C Q R Session 2: Identification of Factors Affecting How Much Back-up Power Is Required at a Remote Site Session 2: Identification of Factors Affecting.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

C Q R Session 3: Best Practice Combinations of Alternate Power Sources to Provide Optimum Duration Session 3: Best Practice Combinations of Alternate Power.
K. F. Rauscher November 2004 C Q R Welcome IEEE COMMUNICATIONS SOCIETY Emergency Power Conference Monday, November 22, 2004 Bell Labs Network Reliability.
Airport Emergency Plan - Overview
Department of Military Affairs & Public Safety WV Office of Emergency Services Primary GIS Missions: Support Emergency Operations Partner with GIS Data.
CMOM CMOM Capacity, Management, Operation & Maintenance and Remote Wireless Monitoring of Collection Systems 5 th Annual FVOA Mini Conference August 18,
TERMINATION AND RECOVERY. Termination of the Emergency Considerations for event termination If the Emergency Operations Center (EOC) has not been activated,
Facilitating a Dialog between the NSDI and Utility Companies J. Peter Gomez Manager, Information Requirements, Xcel Energy.
FCC Broadband Field Hearing Georgetown University Medical Center Deputy Chief Eddie Reyes Alexandria Police Department Thursday, November 12, 2009.
MOTOROLA and the Stylized M Logo are registered in the US Patent and Trademark Office. All other product or service names are the property of their respective.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
CLEC Restoration Overview Impact of 11-Sep. Agenda  Ground Zero Restoration  Issues & Implications  Summary  Ground Zero Restoration  Issues & Implications.
____ __ ____ _____ ____ ______ _____ _____ ____ _____ _____ _____ ____ _____ Click to edit Master text styles Second level Third level Fourth level Fifth.
Abstract Earthquakes are hazardous to people and the economy. Potential loss impacts include lives, homes, office buildings, manufacturing plants, schools,
Session 131 Hazard Mapping and Modeling Supporting Emergency Response Operations using GIS and Modeling.
The Australian/New Zealand Standard on Risk Management
Western States Energy & Environment Symposium October 27, 2009.
The President’s National Security Telecommunications Advisory Committee (NSTAC) National Conference on Emergency Communications (NCEC)
Business Continuity and You! The Ohio State University Business & Finance Enterprise Continuity Program Quarterly Update October 2008Business and Finance.
Review of Power Blackout on Telecom P. J
Survivability Considerations for Design of Government Private Wireless Networks Clay Whitehead Motorola Networks and Enterprise.
Federal Communications Commission Communications Security, Reliability and Interoperability Council Working Group 6 – Best Practice Implementation Stacy.
ELECTRICAL CRITICAL INFRASTRUCTURE SECURITY Charles Hookham, P.E., M.ASCE, VP, Utility Projects HDR Engineering 1.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Business Crisis and Continuity Management (BCCM) Class Session
BITS Proprietary and Confidential © BITS Security and Technology Risks: Risk Mitigation Activities of US Financial Institutions John Carlson Senior.
1 FCC’s Homeland Security Partnerships Executive Office of the PresidentState and Local Governments Sister Agencies Industry and Trade Organizations Federal.
Envisioned Role for NTI Concerning ITS Deployment in Egypt by Dr. Mahmoud EL-HADIDI Professor of Telecommunications at Cairo U & Consultant at NTI 3 rd.
Wireless Priority Service (WPS) OVERCOMING WIRELESS CONGESTION IN EMERGENCIES.
AT&T Response Terrorist Attack September 11, 2001 Presentation to NRIC V PJ Aduskevicz October 30, 2001 Presentation to NRIC V PJ Aduskevicz October 30,
Technology Planning. Primary Elements Stakeholders Leadership team Needs assessment Technology components Work plan Budget Policies Evaluation.
Association of Defense Communities June 23, 2015
1 Crisis Management / Emergency Management Overview.
Steering Committee Working Group 6 Best Practice Implementation October 7, 2010 Stacy Hartman Steve Malphrus Co-Chairs.
Role for Electric Sector in Critical Infrastructure Protection R&D Presented to NERC CIPC Washington D.C. June 9, 2005 Bill Muston Public Release.
GSC /10/2015GSC-8, OTTAWA Randolph Wohlert T1A1 Chairman Wayne Zeuch T1 Vice Chairman ETS – Public Safety and Disaster Relief.
Choosing the Route To Traveler Information Systems Deployment by ITS America ATIS Committee USDOT ITS Joint Program Office Washington State Transportation.
An R&D Manager’s Perspective TechExpo October 5, 2004 Presented by: Veena Rawat.
1Office of the Federal Coordinator for Meteorology OFCM OFCM Special Session: Challenges of Urban Test Beds Charge to the Joint Action Group for Joint.
Disaster Planning The Ten Commandments of Success June 2014.
Mid-Atlantic Regional Council on the Ocean (MARCO) Presented to the 62 nd Annual Interstate Seafood Seminar Bob Connell New Jersey Department of Environmental.
1 Hurricane Recovery Experience John Quigley Director Network Integrity Network Operations November 18, 2004.
NRIC EDUCATIONAL OUTREACH March 14, 2003 Pamela J. Stegora Axberg NRIC VI Steering Committee Chair
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Security at FERC Energy Projects Energy Bar Association Mid-Year Meeting Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory.
International Telecommunication Union The Fully Networked Car Geneva, 3-4 March 2010 Technical session 5: Electric vehicles and Climate Change Enabling.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, AT&T logo and all other marks contained herein are trademarks of AT&T Intellectual Property.
Developing Effective Partnerships with State Government CDC Public Health Preparedness Conference 2005 Marsha Morien, MSBA, FACHE Nebraska Center for Rural.
1 Case Study: Pacific Gas & Electric Company San Francisco Lifelines Council Edwards Salas Senior Vice President, Engineering and Operations, PG&E February,
Information Technology Services Strategic Directions Approach and Proposal “Charting Our Course”
Chief Harlin R. McEwen Chief of Police (Ret) City of Ithaca, NY FBI Deputy Assistant Director (Ret) Washington, DC Public Safety Spectrum Trust Chairman.
1 Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 6, 2009.
1 DOE Office of Electricity Delivery and Energy Reliability David Meyer – May 2005 Developing Policy Options To Enhance Security of Energy Supply for Electricity.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Fiscal Year 2007 Urban Area Security Initiative Nonprofit Security Grant Program Investment Justification Questions, Criteria, and Prioritization Methodology.
[Exercise Name] Initial Planning Conference [Date] Initial Planning Conference [Date]
Industry Overview AT&T and the Bell System Post Divestiture Factors in the Emergence of Competition to the Bells The Vision of the Telecommunications Act.
2014 Storm Preparedness Jeff Brewer – Manager of Engineering Tri-County Electric Cooperative, Inc.
A2 LEVEL ICT 13.6 LEGAL ASPECTS DISASTER RECOVERY.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
Sustainability – why is it way beyond the Triple Bottom Line ?
Tom Lenart & John Field CT DEMHS Region 2.  Department of Emergency Services and Public Protection (DESPP)  Commission on Fire Prevention and Control.
Business Continuity Disaster Planning
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
National Emergency Communications Plan Update National Association of Regulatory Utility Commissioners Winter Committee Meeting February 16, 2015 Ron Hewitt.
Community & Economic Development Conference
Role for Electric Sector in Critical Infrastructure Protection R&D
John M. Felker Director, NCCIC.
Oman Experience on Telecommunications Emergency Plan
Telecommunications for Disaster Relief in Canada
Presentation transcript:

C Q R Session 2: Identification of Factors Affecting How Much Back-up Power Is Required at a Remote Site Session 2: Identification of Factors Affecting How Much Back-up Power Is Required at a Remote Site IEEE COMMUNICATIONS SOCIETY Emergency Power Conference Monday, November 22, 2004 Bell Labs Network Reliability & Security Office Washington, DC Emergency Power Conference Monday, November 22, 2004 Bell Labs Network Reliability & Security Office Washington, DC

C Q R Facilitator: John Stogoski, Sprint & NRIC Scribe: Bill Hitchcock, Sprint & NRIC Facilitator: John Stogoski, Sprint & NRIC Scribe: Bill Hitchcock, Sprint & NRIC IEEE COMMUNICATIONS SOCIETY John Mardula, T-Mobile Steven Dworkin, BatteryCorp Dan McMenamin, VZW Don Klinger, ATT Rex Miller, Motorola Darren Colvin, US Cellular George Tong, Nextel Rick Kemper, CTIA Bob Saint, NRECA Richard Kafka, PEPCO Session 2: Identification of Factors Affecting How Much Back-up Power Is Required at a Remote Site

C Q R Critical Customers – –Hospitals/Public Safety/Govt Facilities/Universities/Broadcast Media – –Linkage between customers and associated network elements Grade of Service – –Escalating Expectations of society Paradigm Shift (wireless/wireline) – –What is an acceptable level of risk? Regulatory/Zoning/Property Mgt issues – –Restrictions in code or lease regarding generators – –Access (safety concern) – –Floor loading – –Requirements differ for tech types (Wireline, wireless, VoIP) – –Tariffed vs. non-tariffed providers Budget $$$ – –Business Case (cost of equip vs. revenue loss) – –Cost of technology Critical Customers – –Hospitals/Public Safety/Govt Facilities/Universities/Broadcast Media – –Linkage between customers and associated network elements Grade of Service – –Escalating Expectations of society Paradigm Shift (wireless/wireline) – –What is an acceptable level of risk? Regulatory/Zoning/Property Mgt issues – –Restrictions in code or lease regarding generators – –Access (safety concern) – –Floor loading – –Requirements differ for tech types (Wireline, wireless, VoIP) – –Tariffed vs. non-tariffed providers Budget $$$ – –Business Case (cost of equip vs. revenue loss) – –Cost of technology IEEE COMMUNICATIONS SOCIETY Key Findings Session 2: Identification of Factors Affecting How Much Back-up Power Is Required at a Remote Site

C Q R Design process for power plants – –Role in telco network (Importance of site) Priority classes of sites (eg Hub Site vs. end cell) – –Threat Assessment – –Interdependencies (eg wireline backhaul) Robustness of network topology – –Environmental factors Rural vs. urban location Location within power grid (opportunity to work with pwr provider proactively) Climate control Proximity to disaster prone areas Coordination b/n Telco, Power Company, restoration coordinators – –Proactive vs. reactive When/how do you build the relationships? – –Mechanisms for coordination (elec co call center, acct rep, fire dept, State/Local EOC, Federal agencies) – –Escalation process to follow justification criteria – –Ability of pwr company to map/DB critical sites Design process for power plants – –Role in telco network (Importance of site) Priority classes of sites (eg Hub Site vs. end cell) – –Threat Assessment – –Interdependencies (eg wireline backhaul) Robustness of network topology – –Environmental factors Rural vs. urban location Location within power grid (opportunity to work with pwr provider proactively) Climate control Proximity to disaster prone areas Coordination b/n Telco, Power Company, restoration coordinators – –Proactive vs. reactive When/how do you build the relationships? – –Mechanisms for coordination (elec co call center, acct rep, fire dept, State/Local EOC, Federal agencies) – –Escalation process to follow justification criteria – –Ability of pwr company to map/DB critical sites IEEE COMMUNICATIONS SOCIETY Key Findings Session 2: Identification of Factors Affecting How Much Back-up Power Is Required at a Remote Site

C Q R Obstacles to response efforts – –Curfews / Roadblocks – –Permits for transport (especially for interstate transport) – –Confiscation of equipment Local police – –Telco low on priority list for power restoration Obstacles to response efforts – –Curfews / Roadblocks – –Permits for transport (especially for interstate transport) – –Confiscation of equipment Local police – –Telco low on priority list for power restoration IEEE COMMUNICATIONS SOCIETY Key Findings Session 2: Identification of Factors Affecting How Much Back-up Power Is Required at a Remote Site