ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Example 2 nd Semester 2010/2011 Eng:

Slides:



Advertisements
Similar presentations
Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 1 Reasons to Reduce Project Durations: 1.To realize incentive pay 2.To fit.
Advertisements

Terminology Project: Combination of activities that have to be carried out in a certain order Activity: Anything that uses up time and resources CPM: „Critical.
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
Chapter 10 Resource Management. Objectives Human Resource Management Capital Resource Management Managing the Resource Profile.
18-1Project Management Chapter 18 Project Management.
Operations and Supply Chain Management, 8th Edition
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 15 Supplement Advanced Methods for Project Scheduling McGraw-Hill/Irwin.
Chapter 9: Reducing Project Duration
Reducing Project Duration
Chapter 7 Networks and Scheduling Project Management for Business, Engineering, and Technology.
Reducing Project Duration
■ Project duration can be reduced by assigning more resources to project activities. ■ However, doing this increases project cost. ■ Decision is based.
Project Management Dr. Everette S. Gardner, Jr.. Project Management2 PERT / CPM advantages 1. Disciplined planning 2. Realistic objectives 3. Unambiguous.
Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening) 4/17/ :55 AM.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
CEM 514 Modeling of Construction Operations The LP/IP hybrid method for construction time-cost trade-off analysis By Samir Abdallah Sulaiman.
OPER 576 Project Management Reducing Project Duration or Project Crashing Greg Magnan, Ph.D. May 20, 2004.
Project Management CPM, PERT, Crashing – An Illustrative Example
Analyzing Cost-Time Trade-Offs There are always cost-time trade-offs in project management. – You can completing a project early by hiring more workers.
Construction Project Management
Project Management Chapter 8 (Crashing).
Projects CHAPTER 10. Learning Objectives 1. Explain what project management is and why it is important. 2. Identify the different ways projects can be.
Network Planning Methods Example PERT & CPM
Time/Cost Trade-off Analysis
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Structuring Projects.
Chapter 9: Reducing Project Duration
Project Planning & Control 1 ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lect. 3.
Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening) Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening)
ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lect. 1 2 nd Semester 2008/2009 UP Copyrights.
Chapter 10. Activity-on-Node Network Fundamentals X Y Z Y and Z are preceded by X Y and Z can begin at the same time, if you wish (B) ABC A is preceded.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
CHAPTER EIGHTEEN Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
Lags in Precedence Relationships
Strategic Project Management1SPM PERT/CPM Technical Issues - Part 2 PERT/CPM Technical Issues zPERT & CPM Technical Issues: yResource Loading & Leveling.
1 6. T IME -C OST O PTIMIZATION Objective: The optimization of project duration and cost by an appropriate crashing of activities. Summary: 6.1 Finding.
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
ENGM 631 Optimization Ch. 10: PERT/CPM. Great Pyriamid of Cheops (2,500 B.C.) 42,300,000 Stone Blocks 440 Stories 4Accuracy of 0.04 inch 413 acres level.
TOPIC-6- TIME-COST TRADE OFF
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Work Breakdown Structure.
3/18/ :47 AM 1 Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening)
CONSTRUCTION MANAGEMENT AND ADMINISTRATION UNIT - III.
Chapter 8 - Project Management1 Lecture 2 Today’s lecture covers the followings: 1.To study “project crashing” concept 2.LP formulation for project management.
Time-Cost Trade-off Models
PERT / CPM – Time-Cost Tradeoffs BSAD 30 Dave Novak Source: Anderson et al., 2015 Quantitative Methods for Business 13 th edition – some slides are directly.
Project Management 6e..
Reducing Project Duration
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Project Management Chapter Topics
& Urban Planning Civil Engineering Department
& Urban Planning Civil Engineering Department
Reducing Project Duration
Engineering Project Management
UNIT II Scheduling Procedures & Techniques CRITICAL PATH ANALYSIS
Magister Sistem Informasi Universitas Komputer Indonesia
Project Management Planning Models
ENGINEERING MANAGEMENT (GE 404)
ENM448-Project Planning and Management
Solution to Problem 2 Developed by: Alex J. Ruiz-Torres, Ph.D.
Lecture 6: Time-Cost Trade-Offs
Project Management Time-Cost Model Tutorial
ELC 347 project management
Chapter 9 Resource Allocation © 2012 John Wiley & Sons Inc.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Presentation transcript:

ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Example 2 nd Semester 2010/2011 Eng: Ismail Zakaria Al Daoor 1

2 Project Crashing

3 Example The durations and direct costs for each activity in the network of a small construction contract under both normal and crash conditions are given in the following table. Establish the least cost for expediting the contract. Determine the optimum duration of the contract assuming the indirect cost is LE 125/day. Time-Cost Trade-Off ( Project Crashing )

A(0) B(8) E(5) G(20) I(12) C(15) F(5) H(13) D(23) Act.N.DC.D∆.DC.C.N.C∆.CSlop A B C D E F G H I CPM = A-C-G-I

5 1. The activity on the critical path with the lowest cost slope is G, this activity can be crashed by 5 days, but if it is crashed by more than 2 days another critical path will be generated. Therefore, activity G will be crashed by 2 days only. Then adjust timing of the activities. A new critical path will be formed, A-C-F-H-I. New contract duration is 57 days. The cost increase is 2 x 60 = LE 120. Time-Cost Trade-Off ( Project Crashing )

6 2. At this step the activities that can be crashed are listed below: Either A at cost LE 100/day Or C at cost LE 200/day Or I at cost LE 75/day Or F & G at cost LE 360/day Or H & G at cost LE 100/ day Activity I is chosen because it has the least cost slope, and it can be crashed by 2 days. Because this is last activity in the network, it has no effect on other activities. New contract duration is 55 days. The cost increase is 2 x 75 = LE 150. Cumulative cost increase = = LE 270 Time-Cost Trade-Off ( Project Crashing )

7 3. Now, we could select A or both H & G, because they have the same cost slope. Activity A is chosen to be crashed. This will change the timings for all activities, but no new critical path will be formed. New contract duration is 53 days. The cost increase is 2 x 100 = LE 200. Cumulative cost increase = = LE 470 Time-Cost Trade-Off ( Project Crashing )

8 4. Now, activities H & G can be crashed by 2 days each. A new critical path A-B-D-I will be formed. New contract duration is 51 days. The cost increase is 2 x 100 = LE 200. Cumulative cost increase = = LE 670 Time-Cost Trade-Off ( Project Crashing )

9 5. At this stage, the network have three critical paths. The activities that can be crashed are listed below: Either C & B at cost LE 350/day Or F, G & B at cost LE 510/day Activities C & B are chosen because they have the least cost slope. New contract duration is 49 days. The cost increase is 2 x 350 = LE 700. Cumulative cost increase = = LE 1370 Now, there is no further shortening is possible. Time-Cost Trade-Off ( Project Crashing )

10 The contract duration and the corresponding cost are given in the table below. Time-Cost Trade-Off ( Project Crashing )

Question 12