Oregon’s Experiments in Closing the Transportation Funding Gap Presented to Focus Georgia April 25, 2007 James Whitty Manager, Office of Innovative Partnerships.

Slides:



Advertisements
Similar presentations
New Public Transit Alliance (NuPTA) RIPEC Study: Transportation at a Crossroads (2002) Growing Smart with Transit: A Report of the Transit 2020 Working.
Advertisements

R O A D U S E R F E E T A S K F O R C E 1 OREGONS TRANSPORTATION FUNDING CHALLENGE.
Overview and Principles for Implementing State PPP (P3) Legislation Presented at the NCPPP P3 Connect Denver, Colorado Conference By Jim Reed, Group Director.
Wisconsin Transportation Finance and Policy Commission Freight Rail Day 2012 October 26, 2012.
Oregon’s Road User Fee Pilot Program Presented to International Fuel Tax Agreement Managers’ Workshop September 2006 PowerPoint Presentation provided by:
October 10, 2013 Federal Transportation Revenue Options Discussion.
Oregon Mileage Fee Concept and Road User Fee Pilot Program Presented to WASHTO Construction and Materials Committee Portland, Oregon April 8, 2008 James.
Getting Started with Congestion Pricing A Workshop for Local Partners Federal Highway Administration Office of Operations.
County Transportation System Governor’s Transportation Advisory Committee September 14, 2012 Abbey Bryduck, AMC Policy Analyst.
THE PRACTICE OF TOLLING Theory in Motion May 7, 2013 Michael Copeland Yagnesh Jarmarwala Justin Winn.
Local Highway Technical Assistance Council Joint Senate and House Transportation Committees January
Colorado Transportation Finance and Implementation Panel Overview Fort Morgan,Colorado September 13, 2007.
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
I-95 Corridor Coalition MBUF Research for the I-95 Corridor Coalition Gary W. Euler.
21 st Century Committee Report Recommendations NC 73 Council of Planning Annual Meeting January 22, 2009.
Viability Gap Funding By Ashok Chawla Additional Secretary Department of Economic Affairs, Government of India 20 th December, th December, 2006.
Funding Your Journey Florida Transportation Economics 101 Howard Glassman Executive Director MPOAC.
IBTTA Washington Briefing Washington, D.C. March 30, 2015 Jonathan L. Gifford, Ph.D. George Mason University / Research.
International Partnership Meeting Thursday, January 17, 2013 Washington D.C. 1.
1 Metrolinx delivers The Big Move Regional Transportation Plan: Transforming Transportation in the Greater Toronto and Hamilton Area November 5, 2012 Bruce.
Funding the Future of Our Transportation Infrastructure Juva Barber Executive Director.
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
THE CONDITION OF OUR SURFACE TRANSPORTATION INFRASTRUCTURE How Do We Adequately Finance Our System?
Wales Infrastructure Investment Plan Gerald Holtham Adviser to Welsh government.
Oregon’s Road User Fee Pilot Program Presented to NEACT LaGrande, Oregon August 4, 2005 James Whitty, Manager Office of Innovative Partnerships and Alternative.
Funding Your Journey Florida Transportation Economics 101 Presenter’s Name Organization.
OREGON INNOVATIVE PARTNERSHIPS PROGRAM OTC Presentation 1/20/05.
Freight Issues in the Report of the National Surface Transportation Policy and Revenue Study Commission Transportation for Tomorrow.
Maximising Investment Opportunities: releasing value from estates Barclays Private Equity 15 th May 2008.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Michigan’s Roads Crisis: Study Findings, Conclusions and Where Do We Go From Here? Best Practices Conference Rick Olson, State Representative, 55 th District.
Quantifying Transportation Needs and Assessing Revenue Options: The Texas Experience presented to The Arkansas Blue Ribbon Committee on Highway Finance.
Legislative Opportunities and Impediments - The Virginia Experience Virginia Public Private Partnerships ATRA TECHNIX Program Phil Bomersheim “Activist”
The Oregon Road User Fee Concept and Pilot Program Presented to National Surface Transportation Infrastructure Financing Commission Washington DC September.
Beyond the Crossroads National Conference on Transportation Infrastructure and Regulatory Policy May 27, Denver, CO Future Infrastructure Needs,
Oregon Transportation Infrastructure Bank (OTIB) Prepared by: Matthew Harris, Senior Financial Analyst.
Oregon Transportation Infrastructure Bank (OTIB) Prepared by: Matthew Harris.
Construction Conference Construction Conference NDDOT’s: NDDOT’s: Future Federal Funding Future Federal Funding State Legislative & Budget issues.
1. 2 Route 895 PPTA (2002) 3 Communication Dilbertian [v. Newtonian] Logic: We know that communication is a problem, but the company is not going to.
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
Prepared for Transportation Planning Board presented by Arlee Reno Cambridge Systematics, Inc. in cooperation with K.T. Analytics November 16, 2005 Status.
Convergence of Transportation Policy and RFID Enabler of Future Transportation Policy Chris Body Mark IV Vice President, Business Development.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Funding US Infrastructure NW Financial Group, LLC.
Overview of PPI’s in Georgia April 26, 2006 Earl Mahfuz, Treasurer.
Public Private Partnerships: Their Limits and Potential for the Private Provision of Transportation Infrastructure Adrian Moore, PH.D. Vice President Reason.
Solving Challenges Others Cannot Using Public Private Partnerships Parkland Blue Ribbon Panel Christopher D. Lloyd October 22, 2007.
State Public Transportation Partnership Conference Reauthorization of the Surface Transportation Programs Jack Basso Director of Program Finance and Management.
FAST Lanes Program Transportation and General Government Policy Committee Association of Metropolitan Municipalities August 16, 2004 Minnesota Department.
Public Private Partnerships What We Have Learned & What More We Need to Know.
The Future of the Federal Surface Transportation Program Travis Brouwer ODOT Federal Affairs Advisor April 2008.
MAKING IT HAPPEN. TRB 88 th Annual Meeting Risk Management in Public-Private Partnerships January 14, 2009 Statutory and Public Policy Approaches to PPP.
IFTA Annual Business Meeting Virginia Beach, VA August 17, 2011 Federal Highway Administration.
A A S H T O S P R I N G M E E T I N G 1 7 M A Y B E D F O R D S P R I N G S, P A 1 Surface Transportation Authorization: Review of Mid-Course.
Status of Funding and Authorization Subcommittee's of Traffic Engineering and Operations and Management Manchester NH 2009 Ken Kobetsky.
Revenues Sources for Transportation Financing Jeffery A. Richard Foster Pepper & Shefelman.
In Numbers Strength COLORADO TRANSPORTATION FUNDING.
ADOT and Public Private Partnerships - Update MAG Transportation Policy Committee April 21, 2010 Gail Lewis, Director, Office of P3 Initiatives.
Budget Workshop Capital Improvement Plan Presentation on Public Private Partnership and Strategy for Municipal Complex, HWY 50, and Coast to Coast Trail.
Transportation Revenue Sources Presentation to the Discovery Institute October 6, 2004 Amy Arnis Deputy Director Strategic Planning and Programming Washington.
Transportation Management and Policy Spring Colloquium.
Road Services Funding Options Bridges and Roads Task Force October 28,
43 RD ASECAP STUDY & INFORMATION DAYS 2015 A Multimodal, Smart and Safe European Transport System: The Key Role of Motorways Epic Sana Hotel May.
One East Broward Blvd., Suite 1800
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
21st Century Transportation Committee Finance Subcommittee
Mobility Choice Blueprint
Transportation Task Force Mission and Vision
DESIGN-BUILD PROGRAM OVERVIEW
Presentation transcript:

Oregon’s Experiments in Closing the Transportation Funding Gap Presented to Focus Georgia April 25, 2007 James Whitty Manager, Office of Innovative Partnerships and Alternative Funding

Oregon’s Road Revenues Under Stress Oregon last raised gas tax in 1993, to 24 cents Oregon’s license and vehicle registration fees are among the lowest in the nation Concerns about ability to raise gas tax to levels necessary to fund major projects across Oregon. More than $10 billion in unmet modernization needs

Growing Vehicle Miles Traveled and Funding Gap VMT predicted to increase by approximately 40%. Purchasing power of gas tax declines by 40-50% due to inflation.

Effect of Fuel Efficient Vehicles on Highway Fund Revenue

Filling the Gap: Legislative Directives Revenue Bonding  Oregon Transportation Investment Act Innovative Finance Advisory Committee  Oregon Innovative Partnerships Program Road User Fee Task Force  Recommendations: –Mileage Fee: A Per-Mile Road User Charge –Congestion Pricing: A Time Varied Road Use Charge –Tolling New Capacity

~Experiments in Filling the Gap~ Oregon Transportation Investment Act  : OTIA I and OTIA II $500 million in revenue bonds for modernization  2003: OTIA III $1.3 billion in revenue bonds for bridge program $300 million in revenue bonds for modernization  Conclusion: Revenue Bonding for Oregon Highways is tapped out!

Oregon Innovative Partnerships Program (OIPP) An innovative procurement method created to: –Develop Partnerships with Private Entities and Units of Government –Expedite Transportation Project Delivery –Maximize Entrepreneurship and Innovation in Project Development –Leverage Public Financing with Private Sources of Capital    “Money at Risk” ~Experiments in Filling the Gap~

The OIPP law defines: “Transportation project” as “any proposed or existing undertaking that facilitates any mode of transportation in this state.” Very broad legal authority could apply to Roads, Bridges, Rail, Ports, Ancillary Facilities, Telecommunications, … any facility that transports.

OIPP Agreements Under OIPP authority, ODOT may enter into agreements - if approved by Oregon Transportation Commission - relating to transportation projects the subject of which may include, but need not be limited to: Planning Acquisition Financing Development Design Construction Reconstruction Replacement Improvement Maintenance Management Repair Leasing Operation Any Financing Mechanism (franchise & user fees)

Proposals can be initiated by Private Firms and/or Units of Government Allows Procurements outside the normal processes of Oregon procurement law Allows Entry of Private Partners at the Earliest Conceptual Stages of the Project Projects Can be Selected by Best Value or Qualifications instead of Lowest Cost Requirement OIPP Allows ODOT to Receive Both Solicited and Unsolicited Proposals

ODOT’s OIPP Choice  RFP for PDA Solicited Proposals ⊲ Controlling project selection Project Screening ⊲ Recommendations to Oregon Transportation Commission Two stage, Triple Project Procurement ⊲ Pre-Development Agreement (PDA) followed by Implementation Agreement (IA) Wide Open Proposal Opportunity ⊲ Attracting innovation into project development and financing Project Extensions ⊲ Creating most viable project

1.Newberg-Dundee Bypass  Bypass of congested state highway to coast 2.South I-205 Corridor Improvements  Possible tolled expressway in SE Portland 3.The Sunrise Corridor  New limited-access facility into high growth area OIPP Projects ODOT signed pre-development contracts with the Oregon Transportation Improvement Group (OTIG), a Macquarie-led consortium

Oregon’s PDA Approach Sharing Risk Among the Parties Up-front investment of private capital for project development Exposure cap on project development costs OTIG 100% at-risk for project financing, construction and facility operation/maintenance Collaborative Working Groups Active interaction between ODOT staff & OTIG Greater public acceptance Off Ramp Opportunities for Exiting Arrangement Provides political cover Allows exploration of less obvious project candidates

SUNRISE PROJECT Off ramp taken I-205 PROJECT Pause for further planning NEWBERG-DUNDEE BYPASS Still seeking solution OIPP PROJECTS – STATUS REPORT

OIPP Challenges - Internal Internal Barriers  Traditionalists  Fear of Tolling and PPPs  Leader Hesitancy Negotiating Internal Barriers  Project selection criteria  Project screening process  RFP development  Involvement of Leadership

OIPP Challenges - External External Barriers  Local Government Resistance  Public Resistance  Political Opposition Negotiating External Barriers  Involvement of Local Leaders Pre-proposal meeting Consultation on proposals Proposer interviews PDA negotiations Project Working Groups Twice monthly briefings  Insertion of Tolling Message Early

Determining Best Financing Approach Finding best path forward ODOT Financial Adviser Analysis and Critique of Private Partner’s Financing Approach and Verification of Data Public Sector Comparator Alternative Private Sector Comparator

A per-mile charge based on miles driven within Oregon by zone Zone 1 = in state Zone 2 = out of state Zone 3 = rush hour Oregon’s Mileage Fee Concept ~Experiments in Filling the Gap~

Characteristics of Collection Miles collected electronically by zone

Mileage fee imposed as part of fuel purchase Fuel tax deducted from fuel purchase price Characteristics of Collection csr R# 1 S# 1 T# :55 AM 06/09/06 Leathers Fuels SE Powell Blvd Portland, OR Pump# 1 Unleaded ST Fuel (4.68) VMT Fee: 5.12 Rush Hour: 40 In-Oregon: 28.6 Non-Oregon: 0 No Signal: 0 Subtotal Total Cash Thank You !

Oregon’s weight-distance tax retained for heavy vehicles Fuel tax maintained for non- equipped vehicles Mileage charge integrates with existing fuel tax collection system Key Features

Multi-Jurisdictional and Variable Pricing Applications Area Pricing Higher rates at peak periods Local Option Defined boundaries Differing rates

Website for Office of Innovative Partnerships and Alternative Funding