1 Standards, open standards and Interoperability II 20-21 September 2005 Sophia Antipolis Closing session report Karsten Meinhold.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

1 Accessibility Forum Projects Bill Hetzner Jim Kindrick.
Advanced Piloting Cruise Plot.
Supplemental Web Fig. 2 mos10/mos10, grown on 100 mm plate SLAS27 medium, day 1.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
North American Numbering Council Billing & Collection Working Group Tuesday, September 20, 2005 Co-Chairs: Rosemary Emmer, Sprint Jim Castagna, Verizon.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to CoU V1a, 20 Jan 2012 Doc: Source: ETSI Agenda.
1 Achieving Technical Interoperability - the ETSI Approach Hans van der Veer ETSI Board Interoperability Champion.
World Class Standards Recommended Improvements to The ETSI Standards Engineering Process Hans van der Veer Chair OCG-IOP & Steve Randall STF308 OCG#32,
SOS Interop II Sophia Antipolis, September 20 and 21, 2005 IPRs and standards: some issues Richard Owens Director, Copyright E-Commerce Division Philippe.
1 Standards, open standards and Interoperability II September 2005 Sophia Antipolis, Meeting starts at 09h00 presentations will be made available.
Freescale Semiconductor Confidential and Proprietary Information. Freescale and the Freescale logo are trademarks of Freescale Semiconductor, Inc. All.
SOS Interoperability III: Standards, Open standards and Interoperability ETSI, Sophia Antipolis 20 February 2006 How OSS can/will/should impact standardization?
GRID-Workshop 24 May ETSI GRID-WORKSHOP 24 May 2006 Introduction Karl Heinz Rosenbrock ETSI Director General.
ACCESS TO GENETIC RESOURCES AND BENEFIT-SHARING UNDER THE CONVENTION ON BIOLOGICAL DIVERSITY by Valérie Normand Secretariat of the Convention on Biological.
What is valorisation ? Growth €
FREEDOM DRIVE 2013 The Future of Independent Living, Active Citizenship and Europe – 12 September 2013.
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
EA Demonstration Study : Dissemination Forum – 8 June EA Views and Sub-views Patrick Bardet EA Unit.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
ZMQS ZMQS
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
ABC Technology Project
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
© S Haughton more than 3?
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Event 4: Mental Math 7th/8th grade Math Meet ‘11.
1 Development of Electronic Reporting Tools for IPPC Directive and WI Directive Workshop – Objective and next steps Tuesday 3 rd March 2009 Meeting room.
Addition 1’s to 20.
25 seconds left…...
Jeju, 13 – 16 May 2013Standards for Shared ICT GTSC-10 Summary Kishik Park, Ph.D. GTSC-10 Chair, TTA Document No: GSC17-CL-04r1 Source: GTSC-10 Contact:
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
Figure Essential Cell Biology (© Garland Science 2010)
1 Unit 1 Kinematics Chapter 1 Day
Number Factors and Multiples Saturday, 09 September 2006 ©RSH.
Weekly Attendance by Class w/e 6 th September 2013.
1 Standards, open standards and Interoperability II September 2005 Sophia Antipolis Track 1: Interoperability Break-out session Room = IRIS 6 Moderator:
1 Standards, open standards and Interoperability II September 2005 Sophia Antipolis Track 3: IPR in Standards Break-out session Room = Amphi Athena.
03/03/2016 Report from GA ad hoc group on ETSI’s IPR Policy operation Karl Heinz Rosenbrock ETSI Director-General 1GSC-9, Seoul SOURCE:ETSI TITLE:Report.
Karl Heinz Rosenbrock Director General, ETSI
Standards, open standards and Interoperability
Status of IPR discussion in ETSI Karsten Meinhold
Anthony Wiles ETSI PTCC On behalf of Hans Van der Veer
Review of GSC-10 IPR WG 45 attendees
Summary of GSC-13 IPR WG Meeting
Track 2: Open standards Break-out session Room = Amphi IRIS
Welcome & Introduction
Presentation transcript:

1 Standards, open standards and Interoperability II September 2005 Sophia Antipolis Closing session report Karsten Meinhold

2 Overview 95 attendees 19 input documents presented and discussed. Three Breakout sessions Track 1: Interoperability Moderator: Hans van der Veer 15 attendees Track 2: Open standards Moderator: Jean Pierre Henninot 18 attendees Track 3: IPRs in standards Co-moderators: Markus Muenkler & Karl Heinz Rosenbrock 45 attendees

3 Summary (Track 1) Interoperability Agreed required characteristics for an SDO, Forum/Consortium – to ensure Technical Interoperability [see document SOS2_16] Next step White paper for terminology, definitions, problem area needed (action on Hans van der Veer) Track 1 closed Any follow-on issues to be brought to main workshop level

4 Summary (Track 2) Open standards GSC Resolution 10/4 way of addressing the issue of « open standards » is acceptable. Every SDO should adopt this text having in mind that: it is valid in the ICT scope it gives a characterisation of «open standards » through a minimum set of characteristics in a given context, actors can precise their practical application. [see document SOS2_17] Next step Track 2 closed Presentation of GSC Resolution to ETSI GA#46 in November 2005 Any follow-on issue to be brought to main workshop level

5 Summary (Track 3) IPRs in standards Elaborated a list of suggested IPR issues in standardisation (cataloguing exercise) Agreed to position ETSI as the IPR think tank for IPRs & Standards Ensure that ETSI is part of the solution to be found [see document SOS2_18r1] Next steps Presentation of issues to ETSI GA#46 in November 2005 Ask GA to create a new IPR working group to analyse the issues and consider what actions are required - including potential for changes to the IPR Policy

6 Summary (Track 3) Next steps (continued) Continue debate through SOS web forum but focus on requirements and solutions for an updated IPR regime Discuss possible pilot case with new IPR regime Outline steps to IPR reform Consider addressing larger audience (e.g. GSC#11, 28 May – 2 June 2006 in Chicago)

7 Next Workshop Standards, open standards and Interoperability III February 2006 Sophia Antipolis