EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June 10-11.

Slides:



Advertisements
Similar presentations
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Advertisements

Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
DVA-1 Project Management Proposal Chris Langley, NRAO 1 US SKA Consortium Meeting - DVA-1 Project Management Proposal June 3-4, 2010.
Title. Preliminary Design2 Agenda Overview Life Cycle Model Data Flow Data Dictionary Constraints Prototype Summary.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, 2007 Progress on 2006 Committee Recommendations Mark McKinnon Project Manager.
First SPL Collaboration Meeting Organization of the Collaboration - Preliminary ideas - R. Garoby 12/12/2008.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
18-19 July, 2002Correlator Backend System OverviewTom Morgan 1 Correlator Backend System Overview Tom Morgan, NRAO.
Tim CornwellEVLA Advisory May 10-11, EVLA: Data Management EVLA has sub-contracted data management to NRAO Data Management group End-to-end processing.
EVLA Monitor & Control EVLA Advisory Committee June 10 – 11, 2002.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
EVLA Monitor & Control Software PDR E2E Interfaces: Observation Scheduling Complaints to: Boyd Waters John Benson, Barry Clark, Tim Cornwell, Rich Moeser,
Bryan ButlerEAC meeting 2003-Sep-091 Computing Issues: Scientific Requirements Bryan Butler EVLA Project Scientist for Software (starting 2003-Oct-01)
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
EVLA Data Processing PDR E2E Data Archive System John Benson, NRAO July 18, 2002.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
Bill SahrEVLA Advisory Committee Meeting September 8-9, EVLA Monitor & Control.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
Future LBO Developments
Software Overview Sonja Vrcic
Bryan Butler EVLA Computing Division Head
Monitor and Control Software
EVLA Overall Software Design
EVLA Computing Software Overview.
Budget, Schedule, Contingency
Software Requirements
EVLA M/C Software PDR, 14 May 2002
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
VLA to EVLA Transition Plan
EVLA Monitor & Control Software PDR
EVLA Computing Reorganization
EVLA Advisory Committee Meeting
Software Requirements
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
Charge to the Review Panel
Gustaaf van Moorsel September 9, 2003
Software Requirements
ENGINEERING REQUIREMENTS FOR BENCH TESTING, SYSTEM INTEGRATION, AND TEST ANTENNA Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002.
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA Advisory Committee Meeting, March 19-20, 2009
Presentation transcript:

EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June 10-11

Gareth HuntEVLA Advisory Committee 2002 June Computer Subsystems e2e Monitor and Control Correlator

Proposal Preparation and Submission Observation Preparation Observation Scheduling Monitor and Control System AntennaFeedReceiverIF System Local Oscillator Fiber Optics Transmission System Correlator Image PipelineData ArchiveData Post- Processing Figure 3.1. Principal EVLA Subsystems NRAO Data Management Group (e2e project) Canadian Partner EVLA Project Primary data flow Control and monitor flow

Gareth HuntEVLA Advisory Committee 2002 June Barry Clark’s View

Gareth HuntEVLA Advisory Committee 2002 June Progress summary M&C M&C has critical deadlines to meet in 2003 –First antenna outfitting in April 2003 The major effort has been to specify and acquire a M&C Interface Board (MIB) for the antennas The RFI requirements of the MIB have placed very tight constraints on the options –Presently one chip and one RTOS Limited success in hiring has placed a huge burden on the staff

Gareth HuntEVLA Advisory Committee 2002 June Progress summary M&C (Good News) The antenna MIB chip has been selected –Several chips delivered –A prototype board has been assembled The RTOS order was placed last week One position filled –One other offer made

Gareth HuntEVLA Advisory Committee 2002 June Progress summary M&C (Bad News) Overall design not yet in place Detailed plan for test antenna software not yet available Strategy for operating three antennas in 2004 not developed –Need to look at other Telescope control systems Three positions still unfilled –Four offers declined

Gareth HuntEVLA Advisory Committee 2002 June Correlator MIB –Less stringent RFI requirements – in a screened room –Will probably use a more standard chip and real-time Linux for MIB Initial design documents for back-end data processing are complete NRAO computer staffing complete

Gareth HuntEVLA Advisory Committee 2002 June e2e Test data archive (Storage Area Network) installed Prototype pipeline tested PDR for EVLA is July 18-19, 2002 One position filled One offer declined Two other offers (NVO, ALMA) accepted