1 The Stormwater-Pavement Interface in Cold Climates Washington State University: L. Haselbach/ S, Nassiri.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Weather & transportation services in Montreal : What connection ? World Weather Open Science Conference, Montreal,August 2014 Mr.France Bernard, ing.M.A.,M.Sc.A.
Near Surface Disposal Facilities
Pervious Concrete: Unique Benefits
Permeable Paving. Low Impact Development (LID)  Low impact development (LID) is an approach to managing stormwater runoff to protect water quality.
Behavior of Asphalt Binder and Asphalt Concrete
Field experiment on the effects of a nearby asphalt road on temperature measurement Mariko Kumamoto 1, Michiko Otsuka 2, Takeshi Sakai 1 and Toshinori.
Permeable Pavements Shingle Creek Watershed Management Commission May 31, 2011.
CITY OF HOUSTON FLOODING & DRAINAGE COMMITTEE PUBLIC WORKS AND ENGINEERING May 18, 2010.
1 What is Green Infrastructure and How Does It Reduce Wet Weather Issues? Making natural systems work for us: using soil and vegetation - rather than concrete.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Minimal Impact Design Standards (MIDS) Calculator Training WELCOME November 13, 2013.
New Models for Interstitial Condensation
UW LID Workshop Permeable Pavement Modeling June 2008 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Session 6A: Permeable Pavement. From the Rooftop to the Bay, March 9 -11, 2010 Photos: Chesapeake Bay Program Permeable Pavements Permeable Interlocking.
Keith Dorn Jesse Mefford Hunter Shealy ceramics.org.
Jordan – Vickery Walkway TJ MedlockNeil Wilson. Existing site background Once was lively and stable Drought and financial issues Surround trees providing.
Low Impact Development Best Management Practices
Western Washington Hydrology Model Version 3 Vancouver, WA, Workshop October 17, 2007 PM.
Prepared by: Marcia C. Belcher Construction Engineering Technology
Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.
Coastal Smart Growth s/index.htmhttp:// s/index.htm
Stormwater Management 101: Implementation Options through Partnerships
Errol Heights Proposed Shared Street Pilot Project
Economic Impact of Medical Education Expansion in Nevada & Recommended Approach FUTURE 1.
Construction Perspectives: Non-vegetated GI and Effective Engineer-Contractor Communication Construction Perspectives: Non-vegetated GI and Effective Engineer-Contractor.
WEATHER STATIONS & RAIN GARDENS:LINKING CLIMATE CHANGE & ADAPTATION Joseph McLaughlin 1, Mentors: Ryan C. Locicero 2, Dr. Maya A. Trotz 2 1. Howard W.
As we are reading remember to make connections with the text. They will help you to remember and understand the information more!
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
By: Melissa Webb and Shannon Finneran
Bill Eyring – CNT Senior Engineer Illinois Sustainable Technology Center September 29, 2010 Monitoring and Documenting Green Stormwater Best Management.
Water Management and Conservation in the Landscape (outline) The Water Cycle Stormwater: runoff, conveyance and treatment with urban infrastructure, discharge.
Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)
WARE RET 2014 –Rain Garden Construction-C. Leon King High School Nicole Richards-Works 1, Ryan Locicero 2, Dr. Maya Trotz 2 1. C. Leon King High School;
Runoff and infiltration characteristics of permeable pavements Review of an intensive monitoring program.
Moisture impact on building rocks - the laboratory and in situ investigations FIDRÍKOVÁ D., KUBIČÁR Ľ. Institute of Physics SAS, Bratislava, Slovakia The.
What’s New in Stormwater Requirements for Development Projects? Jill Bicknell, P.E. EOA, Inc. New Development Workshop May 22, 2013.
Stormwater Management: TCNJ Townhouses South
Evaluation of the RTF Standard Protocol Fan and Cooling Savings from Commercial-Sector Heat Pump Units Rooftop Unit Working Group (RTUG) August 20, 2012.
Bernie Engel, Larry Theller, James Hunter Purdue University.
Adaptation to Climate Change Actions in Mongolia Adaptation Workshop IFAD, Rome May 2007.
PSGB Ecosystem Conference The Effectiveness of LIDs in Reducing Stormwater Runoff February 9, 2009 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Low Impact Development (LID)
Institute of Water Research L-THIA LID Overview July 10, L-THIA LID Component Bernie Engel, Larry Theller Y.S. Park, T. Wright.
MnDOT Road Research Update Maureen Jensen Benjamin Worel TRB January 17, 2013.
Western Washington Hydrology Model 2005 AWRA Annual Conference Doug Beyerlein, P.E. Joe Brascher Shanon White Clear Creek Solutions, Inc.
Iowa Environmental Mesonet National Weather Association Conference March 22, 2002 Dennis Todey Iowa State University.
Anti-icing Study at O’Hare International Airport Professor: Barry J. Dempsey Graduate Asst.: Nathan M. Carroll.
Presented by David C. Nyman, P.E. Comprehensive Environmental Inc. Annual Nonpoint Source Conference April 29, 2014.
Community Planning: Monitoring & Evaluation Geddes Institute Research The Geddes Institute Emma Coles.
ASCE LID Conference LID Analysis Considerations in Western Washington November 17, 2008 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Managing Storm Water In the Martin Hall Area Kevin Kulik.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
Request for Approval of Temporary Rule Changes to 15A NCAC 02H.1002 Presentation to NC Environmental Management Commission March 13, 2014.
Analyzing a Development Site for Low Impact Development design.
Water in the Atmosphere Weather and Climate Day 3.
Comprehensive Thinking and Planning
Presented to: REDAC By: Navneet Garg, Ph.D. Date: March 15, 2016 Federal Aviation Administration RPA P2: National Airport Pavement & Materials Research.
Stormwater and our Local Watersheds Green Night in Roselle May 7, 2009.
Sentek Moisture capacitance probe trial installed in January 2014
Metro’s Natural Areas: Maintenance Strategy Needed
Sausalito Downtown Public Restroom
Dynamics of the seasonal thawing of frozen ground at the disturbed area, Alexandra Land, Franz-Joseph Land Archipelago Tikhonravova Yana Earth Cryosphere.
Tennis Court Construction, Installation & Resurfacing Guide
UW Civil and Environmental Engineering
Oklahoma State University
Construction of cold store
Lonza Biologics Campus Expansion, Portsmouth, NH Stormwater Management
2019 Pavement Workshop May 21-23, 2019
JLEIC Accelerator R&D Meeting
Presentation transcript:

1 The Stormwater-Pavement Interface in Cold Climates Washington State University: L. Haselbach/ S, Nassiri

2 Background  Many cold climate stakeholders interested in using low impact technologies such as pervious concrete for managing stormwater quantity and quality.  Their durability under winter and snow-removal conditions are not well understood.  The impact on neighboring pavements with respect to frost heave, etc. and the constraints on storing water below grade in cold climates are not well understood.

3 Project Scope  Objective - assess wintertime impacts on pervious concrete and influence of storing water below grade on neighboring soils/pavements 1Install soil moisture/temperature probes next to a placement 2Monitor surface conditions of permeable and neighboring pavements over winter conditions 3Assess functionality of pervious concrete after use in cold climates

 Site 1: Pervious concrete sidewalk built by WSU in Pullman near Community Hall in May 2015  Site 2: Porous asphalt parking area to be built by the City of Spokane at the arboretum…..tentative July 2015 Objective 1: Soil Moisture Installations 4

 Part of an Ecology project is the match for the work herein, funding the sensor installations in Pullman.  WSU Facilities has funded the new placement on the campus.  The City of Spokane is funding the new placement in Spokane.  This project funds the sensor installation in Spokane. Collaborations for Objective 1 5

 Ongoing pavement condition index evaluation of pervious concrete placements in Pullman after multiple winters (found change in de-icer might have had impacts).  Novel experiment for enhancing micro- texture of pervious concrete surfaces to increase winter skid resistance initiated. Objective 2: 6

Laboratory Specimens: Located Outside by Sloan in Winter: Qualitative Results 7

Laboratory Specimens: Located Outside in Past Winter: Quantitative Lab Results 8 A- broom, b-sand pre-compact, c-Gator, d-sand post, e-control

 All pervious concrete and porous asphalt installations at WSU Pullman have been evaluated for hydraulic functionality.  Sloan pervious concrete sidewalk has been evaluated for cold weather impacts on infiltration over the winter. Objective 3: 9

 Proceedings of LID Conference in Houston January 2015: L.M. Haselbach and B.S. Werner, Pervious Concrete Performance in Eastern Washington: Surface Infiltration  Working on two papers for TRB submittal (by August ) for January 2016 meeting. On impact of temperature on pervious concrete infiltration rate. On the developing friction tests (qualitative and quantitative) to evaluate different pervious concrete microsurfaces for improved winter performance. Products 10

 If the construction goes as planned in Spokane then we expect the project to be complete by the end of the summer.  Then we will be soliciting funds to: collect, evaluate and begin modeling the data from the two sensored sites. And to do the friction analyses on the Community site under winter conditions! Timeline 11

 Dr. Nassiri is proposing detailed heat transfer testing of pervious concrete. We were able to install temperature sensors in the pavement at the new Community site for her work in addition to the proposed laboratory tests. Ancillary 12

Community Placement ..

..

Placement Community Placement Done in seven days! Already tested Infiltration rates and They are great! Sand finish slightly Slower!