Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.

Slides:



Advertisements
Similar presentations
1 TAC Report to the ERCOT Board March 21, TAC Summary 3 unanimous PRRs 3 unanimous PRRs TAC discussion regarding Board Retreat Action Items TAC.
Advertisements

Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
Protocol Revision Subcommittee Tom Burke July 2, 2013.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 21, 2009.
Protocol Revision Subcommittee Sandy Morris October 6, 2011.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
1 TAC Report to the ERCOT Board October 18, 2005.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 17, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors June 16, 2009.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 3, 2010.
July 06, 2006 – TAC Meeting 1 TPTF Update Trip Doggett.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Protocol Revision Subcommittee Tom Burke June 7, 2012.
1 TAC Report to the ERCOT Board June 21, TAC Summary 8 PRRS 8 PRRS Withdrawal of PRR 552 Withdrawal of PRR 552 Potomac Recommendations Potomac.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 9, 2009.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
1 TAC Report to the ERCOT Board February 21, 2006.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 12, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
1 TAC Report to the ERCOT Board February 16, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 2, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
Technical Advisory Committee (TAC) update to RMS Kathy Scott January 3, 2013Technical Advisory Committee 1.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2004.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 6, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 16, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
1 TAC Report to the ERCOT Board January 17, 2006.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee December 1, 2005.
Technical Advisory Committee Presentation to the ERCOT Board of Directors September 16, 2008.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
February 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 4, 2014 TAC Update to RMS 1.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee September 4, 2003.
1 TAC Report to the ERCOT Board November 14, 2006.
Protocol Revision Subcommittee Tom Burke April 5, 2012.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 21, 2008.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
Protocol Revision Subcommittee Tom Burke January 3, 2013.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 20, 2009.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors November 17, 2008.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 5, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 05, 2008.
Protocol Revision Subcommittee
TAC Report to the ERCOT Board
Protocol Revision Subcommittee
TAC Report to the ERCOT Board
Technical Advisory Committee
Presentation transcript:

Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006

PRS Summary RPRS Update RPRS Update 6 NPRRs for Approval 6 NPRRs for Approval 2 PRRs Rejected 2 PRRs Rejected 7 PRRs for Approval 7 PRRs for Approval 4 Non-System Changes – IA only 4 Non-System Changes – IA only 3 System Change – CBA/IA 3 System Change – CBA/IA 5 Urgent 5 Urgent

Nodal PRRs PRS unanimously recommended approval of: PRS unanimously recommended approval of: NPRR011 – Revision to Credit Requirements NPRR011 – Revision to Credit Requirements NPRR012 – CRR Granularity in CRR Auction NPRR012 – CRR Granularity in CRR Auction NPRR014 – Zonal PRR Synchronization for Section 16 NPRR014 – Zonal PRR Synchronization for Section 16 NPRR015 – Zonal PRR Synchronization Section 22, Attachment H NPRR015 – Zonal PRR Synchronization Section 22, Attachment H NPRR016 – TPTF Clean-up Items for Section 2, 3, & 16 NPRR016 – TPTF Clean-up Items for Section 2, 3, & 16 ERCOT believes these changes can be absorbed into the initial requirements/design/schedule ERCOT believes these changes can be absorbed into the initial requirements/design/schedule PRS, with 1 abstention, recommended approval of: PRS, with 1 abstention, recommended approval of: NPRR013 – Section 2 (Zonal PRR Synchronization & ERCOT Staff Clarifications) NPRR013 – Section 2 (Zonal PRR Synchronization & ERCOT Staff Clarifications) ERCOT believes these changes can be absorbed into the initial requirements/design/schedule ERCOT believes these changes can be absorbed into the initial requirements/design/schedule

Rejected PRRs PRR 607 – One Minute Ramp Schedules PRR 607 – One Minute Ramp Schedules Motion to approve received 12 Nays, and 3 Abstentions Motion to approve received 12 Nays, and 3 Abstentions PRR 674 – Temporary Alteration of Settlement Equations Related to the RPRS Under-Scheduled Charge – URGENT PRR 674 – Temporary Alteration of Settlement Equations Related to the RPRS Under-Scheduled Charge – URGENT Motion to reject approved to with 2 abstentions Motion to reject approved to with 2 abstentions

PRR 653 – OOME Ramp Rate Adherence Purpose (Constellation, IPM) Allows a QSE to request a VDI when being un- deployed from OOME instructions at a rate greater than the QSE’s ramp rate. Benefit Corrects payments to generators providing reliability services and eliminates a disincentive to providing OOME service. Market Impact Some minor uplift due to OOME un-deployment System Change NoN/A AssumptionsN/A PRS Vote PRS recommended approval with 5 abstentions; all market segments were present Effective Date November 1, 2006

PRR 653 – OOME Ramp Rate Adherence Item Reviewed Description NoImpact Credit Monitoring/ Liability Budget Staffing Computer Systems Business Functions Grid Operations Impact

PRR 671 – Remove Sunset Date on Floor for Responsive Reserve Service Bids Purpose (Reliant for DSWG, IPM) Removes the 1/1/07 sunset date while maintaining the requirement that offers not be submitted for less than $0. Benefit Continues current practice. Market Impact N/A System Change NoN/A AssumptionsN/A PRS Vote PRS unanimously recommended approval; all market segments were present Effective Date November 1, 2006

PRR 671 – Remove Sunset Date on Floor for Responsive Reserve Service Bids Item Reviewed Description NoImpact Credit Monitoring/ Liability Budget Staffing Computer Systems Business Functions Grid Operations Impact

PRR 682 – Emergency Electric Curtailment Plan (EECP) Event Realignment -- URGENT Purpose (Garland P&L for ROS, Muni) Aligns Protocols with OGRR 186, realigning EECP procedures to allow ERCOT to perform faster communication of system conditions. Benefit Improved EECP communications. Market Impact N/A System Change NoN/A AssumptionsN/A PRS Vote PRS recommended approval with 1 abstention; all market segments were present Effective Date October 1, 2006

PRR 682 – Emergency Electric Curtailment Plan (EECP) Event Realignment -- URGENT Item Reviewed Description NoImpact Credit Monitoring/ Liability Budget Staffing Computer Systems Business Functions Grid Operations Impact

PRR 688 – ERCOT Nodal Implementation Surcharge-- URGENT Purpose(ERCOT) Implements PUCT Order for Nodal Implementation Surcharge. Benefit Conforms to PUCT Order. Market Impact Establishes a new ERCOT surcharge. System Change Yes ERCOT implements new charge type. Assumptions 2007 Priority 1, Rank 7.5. PRS Vote PRS recommended approval with 1 abstention; all market segments were present Effective Date Upon System Implementation

PRR 688 – ERCOT Nodal Implementation Surcharge-- URGENT Item Reviewed Description NoImpact Credit Monitoring/ Liability Budget Staffing Computer Systems Business Functions Grid Operations Impact <$50K Impacts Lodestar/Billing Systems

PRR 690 – Termination of the Modified Competitive Solution Method-- URGENT Purpose (Suez, IGEN) Implements PUCT Order in Project 31972, Market Power & Resource Adequacy. Benefit Conforms to PUCT Order. Market Impact Establishes a new ERCOT surcharge. System Change NoN/A AssumptionsN/A PRS Vote PRS unanimously recommended approval; all market segments were present Effective Date October 1, 2006

PRR 690 – Termination of the Modified Competitive Solution Method-- URGENT Item Reviewed Description NoImpact Credit Monitoring/ Liability Budget Staffing Computer Systems Business Functions Grid Operations Impact

RPRS Update PRS’ RPRS TF completed its investigation of RPRS procurement PRS’ RPRS TF completed its investigation of RPRS procurement In general, TF determined that the procurement engine was working properly In general, TF determined that the procurement engine was working properly QSE WG will continue to look at RPRS operational solutions/alternatives QSE WG will continue to look at RPRS operational solutions/alternatives Thanks to Manny Munoz (CenterPoint) & Gary Miller (BTU) Thanks to Manny Munoz (CenterPoint) & Gary Miller (BTU) PRS provides its recommendation to TAC today PRS provides its recommendation to TAC today

PRR 687 – RPRS Under-Scheduled Capacity Delineation -- URGENT Purpose(ERCOT) Modifies PRR 666. Benefit Clarifies PRR 666. Market Impact N/A System Change Yes Same as PRR 666 Assumptions PRS Vote PRS unanimously recommended approval as revised by PRS; all market segments were present Effective Date Upon System Implementation

PRR 687 – RPRS Under-Scheduled Capacity Delineation -- URGENT Item Reviewed Description NoImpact Credit Monitoring/ Liability Budget Staffing Computer Systems Business Functions Grid Operations Impact Same as PRR 666

PRR 676 – RPRS Solution with Nodal RUC-Type Procurement & Cost Allocation -- URGENT Purpose (CPS Energy, Muni) PRR revises RPRS to use Nodal RUC-Type procurement and cost allocation. Benefit Reduces capacity insufficiency fees and eliminates excess funds/costs. Market Impact Market participants would need to revise RPRS shadow settlement. System Change Yes Work would accompany PRR 666/687 Assumptions C/B Ratio – Priority 2, Rank 10 PRS Vote Motion to approve with PRR 674 features failed by to with 4 abstentions PRS recommended approval to with 4 abstentions; all market segments were present Effective Date Upon System Implementation

PRR 676 – RPRS Solution with Nodal RUC-Type Procurement & Cost Allocation -- URGENT Item Reviewed Description NoImpact Credit Monitoring/ Liability Budget Staffing Computer Systems Business Functions Grid Operations Impact <$500K with PRR 687 Impacts Lodestar, POS/MOS

Recommended TAC Actions Approval Approval PRR 653 – OOME Ramp Rate Adherence PRR 653 – OOME Ramp Rate Adherence PRR 671 – Remove Sunset Date on Floor for RRS Bids PRR 671 – Remove Sunset Date on Floor for RRS Bids PRR Emergency Electric Curtailment Plan (EECP) Event Realignment -- URGENT PRR Emergency Electric Curtailment Plan (EECP) Event Realignment -- URGENT PRR RPRS Solution with Nodal RUC-Type Procurement & Cost Allocation -- URGENT PRR RPRS Solution with Nodal RUC-Type Procurement & Cost Allocation -- URGENT PRR RPRS Under-scheduled Capacity Delineation -- URGENT PRR RPRS Under-scheduled Capacity Delineation -- URGENT PRR ERCOT Nodal Implementation Surcharge – URGENT PRR ERCOT Nodal Implementation Surcharge – URGENT PRR Termination of Modified Competitive Solution Method – URGENT PRR Termination of Modified Competitive Solution Method – URGENT