Institutional Structures and Processes for High-Quality, Scaled Implementation Mini-hydro power for energy access Oliver J. Haas.

Slides:



Advertisements
Similar presentations
Ministry of Electricity and Energy General Authority for Rural Electricity Rural Energy Access Project OFF GRID RURAL ELECTRIFICATION Summary of The Project.
Advertisements

KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS Nexus Energytech Pvt. Ltd. Arvind Karandikar
- P G Ajith kumara.  Introduce strong community/ business concept  Build capacity of non technical aspects  Build capacity of technical Aspects  Identify.
DEPARTMENT OF TRADE AND INDUSTRY INCREASING ACCESS TO FINANCE.
Hydropower Development: Experience of Nepal
Mini-Grid Based on Renewable Energy (Biomass) Sources to Augment Rural Electrification Implemented by UNIDO.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Outline of JICA’s Assistance prepared for
Renewable Energy in Oman Public Authority for Electricity and Water Khalil Alzidi Senior Renewable Energy Engineer.
Low Carbon Energy Futures workshop Alison Lax Project Manager – Low Carbon Communities.
18 September 2012 Independent System and Market Operator Bill. Progress Report on further Due Diligence incorporating transfer of assets.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
E8-GEF-UNDESA-UNESCAP Financing Sustainable Electrification South-East Asia Dialogues Bangkok, Thailand, September 8-10, 2009 Pro-Poor Public-Private Partnership.
Competitive Funding for Higher Education Richard Hopper Senior Education Specialist The World Bank Baku, Azerbaijan – May 13, 2009.
FY Preliminary AssessmentQuick Wins by 2015 National Sector Strategy ● Need the mid- to long-term Power M/P based on demand forecast.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
- Expert group meeting / Tunis 3-5 October Innovative mechanisms for financing renewable energy projects in North Africa MSP Project-pipeline and.
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation Prepared for: District of Squamish and Project Sponsors Prepared by: Compass Resource.
ETF Conference, Building & Financing European Transport Infrastructure, Brussels, 23rd Oct Building & Financing European Transport Infrastructures.
1 RENEWABLE ENERGY MARKET TRANSFORMATION PROJECT.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
1 Development of Renewable Energy Application in Vietnam Energy and Petroleum Department MINISTRY OF INDUSTRY.
Myanmar: Towards Universal Access to Electricity by 2030 Nay Pyi Taw, January 28, 2015.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
An Integrated Approach to LED Promotion and the Critical Role of Local Government Challenges & Opportunities CLGF Energising Local Economies: Partnership.
Rural Electrification Access by Department of Rural Development
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
Biofuels at the level of the Common Market for Eastern and Southern Africa (COMESA) Presented to First High Level Biofuels Seminar in Africa Addis Ababa,
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Slide 1 An Alfred McAlpine plc company. Thursday, 04 October 2007 Land Management Guidance (v2) Philippa Towler.
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
APEC ENERGY WORKING GROUP FRAMEWORK PROPOSAL FOR IMPLEMENTING ENERGY INVESTMENT RECOMMENDATIONS (November 2004).
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
MiniGrid Group NEP Off Grid Electrification Breakout session.
1 PIDA in the Energy Sector AfDB/AUC Workshop 17th UPDEA Congress Tunisia, 29 May 2012 Interconnecting, Integrating, and Transforming a Continent.
WATER AND SANITATION SECTOR (WSS) IN ESTERN EUROPE AND CAUCASUS Strategic Approach of KfW Development Bank Dr. K. Gevorgyan KfW Representative in Armenia.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
1 Experience from Finland Christian Llull, Ho Chi Minh City, 23rd November 2015 ? Cooperation & Partnership in Wind Project Development.
CAI-Asia is building an air quality management community in Asia Investment Implications of the Action Plan Sustainable Urban.
INTERNATIONAL RENEWABLE ENERGY AGENCY IRENA Renewables Readiness Assessment Comparative Analysis Silia Kilepoa Ualesi Suva, Fiji Islands 13 November 2015.
AU/UNIDO/Brazil High-Level Seminar on Biofuel.  Policies are required to reflect the country’s development vision for the sector  Required to establish.
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
Jela Tvrdonova, The EU priorities:  Use the Leader approach for introducing innovation in the thematic axis  better governance at the local level.
Markets, Barriers and Opportunities for Renewable Energy in APEC Economies Lydia La Ferla Energy & Security Group May 14, 2004.
BRIEF ON RE PROGRAMMES STATUS AND REFITS IN TANZANIA. For International seminar on Global Renewable Energy Support Programme focusing on Globally funded.
Myanmar: Toward Universal Access to Electricity by Role of Minihydro Xiaoping Wang Senior Energy Specialist World Bank July 30, 2015.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
The role of RE Policies Safiatou Alzouma Nouhou IRENA Tanzania RRA Workshop, 9 March 2016.
UN Collaborative Programme on Reducing Emissions from Deforestation and Forest Degradation in Developing Countries FAO-UNDP-UNEP April 2008.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
Models of Aggregation for Water Supply and Sanitation Provision Capacity Building Module.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
Current Electrified Villages Sagaing Region Townships - 11 Villages - 91 Households Kayin State Townships - 5 Villages Households
Renewable energy support schemes in the Republic of Moldova
The 3rd package for the internal energy market
Off-grid Electrification Department of Rural Development
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
The Business of adaptation
WATER REGULATORY AUTHORITY
progress of the water reform in bulgaria
Incentives for electricity infrastructure – ERGEG view
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
UNFCCC Needs-based Finance (NBF) Project
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
Presentation transcript:

Institutional Structures and Processes for High-Quality, Scaled Implementation Mini-hydro power for energy access Oliver J. Haas

Contents The next step is to establish institutional structures and processes that route support to project developers and communities, and mechanisms for the government to monitor and assure high-quality implementation. Interpretation of status quo (energy sector) The desirable situation The role of pilot projects Next possible steps 2 © INTEGRATION

Background Small and mini-hydro power sector exists, characterized by –A large number of MiHPs –A large number of mini-grids (Diesel or bio-gas gen-sets) –Well-equipped fabrication shops  Sense of entrepreneurship  Reliable community-based governance structures  High uncertainty for project developers and operators  Large-scale role out of grids, and large hydro- and gas-power 3 © INTEGRATION

Requirements for S/MiHP Sector Development Operating a S/MiHP must be legal Different operation models should be eligible Tariffs need to allow risk equivalent margins –Adjustment to changing cost structures must be possible. –This must also hold true for systems with capital subsidies. Operating a S/MiHP must be secure for 20, or even better, 25 years –A clear, reliable and long-term scheme for the time when the national grid arrives must be available´. Hydrological resource assessment should be accessible Consumer/village (cluster) must be large enough to break-even Technical support and quality assurance need to be in place Capital subsidies for distribution networks and other fixed assets Provision of long-term loans to enhance the IRR Community involvement needs to be well organized 4 © INTEGRATION

Local Co-governance of Mini- grids (community level) 5 © INTEGRATION 2007 Grid coverage is defined by transparent criteria Code of conduct allows demand management at different times and regulated payments Operators and community can change the code of conduct The community understands the cost of electricity and the impacts of non-payment (free-riding) Sanctions range from individual warning to disconnection Local governance mechanisms assume responsibility for a quick response to problems or conflicts The operator and the community are the owners of the mini- grid Micro-utilities are at least partly community-owned/-governed

Challenges Ahead DRD has interest in promoting MiHPs for rural development –However, is a relatively new department with various rural infrastructure activities. No independent regulator and mixed regulatory responsibility –States are eligible to issue licenses for off-grid MiHPs –Regulatory processes on national / sub-national level are not yet clearly defined  Private project developers are uncertain about the future. Underinvestment in MiHP (no access to capital/finance)  “Everyone wants to be connected to the grid.”  Important to act carefully when regulating an existing sector. 6 © INTEGRATION

From ‘Pilot Project’ to ‘Project Pilots’ What can be the benefit of pilot projects? How to create confidence of SPP/project developers while -enhancing the capacities of public institutions, and -preparing a regulatory framework (templates, tariff schemes, PPAs, licenses etc.)? Conduct an EoI/tendering for pilot projects assuming it would be regulated, wherein -Mobilize the private sector with clear incentives and a competition for new projects (project pipeline of XY MiHPs). -Create standards (grid connectivity, power availability), templates, calculation schemes (tariffs), etc. 7 © INTEGRATION 2007

Assumptions for Program-Pilots A large-scale implementation of decentralized mini-hydro power systems can be best realized by private sector stakeholders. The highest long-term impact will be created if the pilot projects are embedded in a long-term approach and involve private operators from the beginning. Private operators shall be part of the entire process of site evaluation, project development, and system installation and operation during the pilot project phases. 8 © INTEGRATION

The Technical and Business Support Unit/Program The process is aimed to prepare SPP to roll out its individual business models. –Pipeline with clear capital grant (and access to debt finance) –Technical support unit to support and monitor project developers OPTION 1: TENDERING PROCEDURE Call for Proposals for selected sites OPTION 2: THE PROJECT DEVELOPER’S APPROACH Unsolicited proposals for different sites In both cases, projects should be developed for grid integration (later) on and with high quality standards. Sizes/capacities, technologies, target groups and investment costs as well as to the question whether “embedded generation” Quantification of site selection criteria. Villages/settlements must meet the criteria to be suitable for mini-hydro electrification. 9 © INTEGRATION 2007

The Technical and Business Support Unit/Program (II) Selection and Coaching of Private Operators MiHP Development Workshop -Create awareness and mobilize private sector participants -Develop sufficient capacities for those companies that decide to participate in the Guided Site Competition The Guided Site Competition (GSC) -Business plan with financial model, a MiHP/mini-grid implementation and operation strategy. -Up to 5 winners of the GSC and up to 5 additional candidates will receive comprehensive technical assistance to develop their mini-hydro projects to the implementation stage. 10 © INTEGRATION

Guided Site Competition First component –(Site selection and) demand assessment –Technical system design and financial model development –Obtaining of permits and preparation of licenses –Training/support in system installation, commissioning, and O&M Second component –Support in community awareness and PURE promotion –Support to design, installation and commissioning of a distribution grid according to national grid standard (The ownership of the grid will be transferred to the village community while the operator will get the exclusive usage right for the distribution grid. 11 © INTEGRATION

The TBSU Internal Development Process Preparation of the required documents and licenses Provision of capital grants Development of the medium and low voltage network at chosen sites (Support to access debt finance)  The goal is to mobilize the required financing for at least 10 pilot projects until the end of 201?.  The development and implementation of the required frameworks shall be facilitated parallel to the Technical and Business Support Unit/Program (II).  Further tender processes can be launched as part of the program in future. 12 © INTEGRATION 2007

Thank you 13 © INTEGRATION 2007