Team Members: Thong Truong Paul Lucas Khoi Nguyen Asgedom Grehiwot Mircea Bec Meshari Ebrahim Faculty Advisor: Dr. Faryar Etesami Industrial Adviosr :

Slides:



Advertisements
Similar presentations
Team SYNERGY in Partnership with Parker PGI
Advertisements

Corner Rounder Capstone Team Melissa Anders Andrew Dillon Joshua Schmidt Matt Kirtley Team Members: Faculty Advisor: Huafen Hu.
Formula 1 Group Members: Quinn Collett Steve Godlewski Tobiah Halter Jeff Swanson Academic Advisor: Dr. Chien Wern June 4, 2003.
Dr. Parmigiani, This is Will Rogers. I had a couple of your classes most recently senior design (Autonomous Underwater Vehicle). The company I'm working.
Cooling System Reuben Ness Riki Hopkins Craig McLain
MATLS 4Z06 Industrial Projects MSE Capstone Course Joey Kish (Coordinator) Monday, April 29, 2013.
SUSTAINABLE PRODUCT & PROCESS DEVELOPMENT ISQA 511 Dr. Mellie Pullman 1.
Northwest Natural 12” Pipeline Integrity Project Team Members Jon Ziring Zack Lemmon Long Nguyen Academic Advisor Faryar Etesami NWN Sponsor Advisors Ross.
Team Members Industry Contact Academic Advisor Dr. Faryar Etesami.
Slim Air Moving Device 2011 Karmand Rasheed Ben Furst Bruk Yimesgen Alex Aseyev Faculty Advisor: Dr. Faryar Etesami Industry Advisor: Jered Wikander.
Presenters: Michael Dixon Ben Gheliuc Group Members: Haidar Al Gharash Daniel Gheliuc Fue Her Zach McCurter Capstone Advisors: Faryar Etesami Evan Thomas.
FSAE Saluki Racing Brake system Team 28 DESIGN REVIEW
Mobile Environment Chamber End of Term Progress Report Team members: Tuan Ngo ( presenter 1) Giang Nguyen (presenter 2) Duc Tran Peter Elabd Thien Nguyen.
Formula SAE Cooling System Reuben Ness Riki Hopkins Craig McLain.
Academic Advisor: Dr. Dave Turcic Team Members: Ron Pahle Khoa T. Tran Duc M. Le Thanh Q. Nguyen Shafi Alhajri Sponsoring Company: Edwards Vacuum Ltd.
Design Project Management
Electrical Engineering Capstone Courses EE-4BI6 Electrical and Biomedical Engineering  Dr. Hubert deBruin EE-4OI6 Electrical and Computer Engineering.
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
Bicycle Harvesting Waste Energy: Bicycle Power Generation MSD-I RIT-Systems Design Review Winter/Spring P12414 January 13, 2012 Group # P12414.
P RODUCT D ESIGN AND D EVELOPMENT Chapter 3, 4 & 5 – Product Planning, Customer Needs & Product Specifications.
Braking System for a Hospital Bed Approach Calculations Design Team Nicholas Beechnau Aaron Cole Nicholas Nwabueze Matthew Hays Brainstorming sessions.
Contact : Stephen Gass Advisor :Faryar Etesami Team Members : James Boag Jerry Boyum Cory Nardin Roger Smith.
Humidifying a Sealant Cure Oven. Traditional Method Large monuments – big enough to drive a car into. No Flow control – holds to many parts. Costly to.
Design Project Management Design Project Managers Identify tasks Make and update plans Sequence tasks Allocate time Allocate People and Resources Monitor.
Formula SAE Flow Testing Device Team members: Keith LundquistLong DangAdam Barka Vu NguyenJasper Wong Industrial Advisor:Academic Advisor: Evan Waymire,
2011 Human Powered Vehicle Challenge 'Mjolnir' Team Members: Tad Bamford Ben Higgins Chris Schultz Aaron Stanton Neal Pang.
Intel ® Robotic Tablet Charger Presenters Hung Nguyen Kevin Hughes Group Members Garrett Pauwels Justin Carey Nolan Igarashi Richard Mullenburg PSU Faculty.
Dr. Parmigiani, I thought I'd send you a message and let you know where I've ended up since college… … As you may recall I took senior project from you.
Intel ® Robotic Tablet Charger Presenters Garrett Pauwels Justin Carey Group Members Hung Nguyen Nolan Igarashi Richard Mullenburg Kevin Hughes PSU Faculty.
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
Capstone Team -Andre Nylund -Chris Grewell -Craig Lechtenberg -Fadel Al Jutail -Matt Melius -Mufeed Yacoub Team Advisor -Dr. Raul Bayoán Cal.
ME4182 Midterm Progress Report Team: Future Crew Technologies Chris Biggers Simon Cole Ray Cortés Chuck DeVane Victor Renteria TeJuan Rowe Professor: Dr.
Sponsor: Carrier Corporation Advisor: Dr. H. El-Mounayri May 3, 2007 Design Team: Mike Abel Braden Duffin Simon Marin Joe McGuire.
PECO PRODUCT DESIGN SPECIFICATIONS REPORT PRESENTATION
Abstract Introduction End Product & Deliverables Resources Project Requirements Team Members: Faculty Advisors: Client: Team Members: Faculty Advisors:
Defining Design Goals and Design Requirements © 2013 Project Lead The Way, Inc.Engineering Design and Development.
Product Design Specification Lecture 5. 2 PDS in Design Process Recognition of Need Becoming Informed Problem Definition  Market analysis  Background.
Axle Temperature Control Product Design Specification Design Team Mike Erwin Emery Frey Boun Sinvongsa Lee Zimmerman PSU Faculty Advisor Dr. Lemmy Meekisho.
Magnetically Levitated Propeller Bernie Garcia (ME, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachary Louison.
Tata McGraw CHAPTER 4 Product and Service Design.
PRODUCT DESIGN SPECIFICATION
 Oxygen Analyzer Team 7: Justin Akiyama, Andrew Do, Sapphire Lopez, Jay Patel, Marvin Patel, Nirav Shah.
Engineering Design Team Asgedom Gebrehiwot Paul Lucas Thong Truong Mircea Bec Meshari Ebrahim Khoi Nguyen PSU Faculty Advisor Dr. Faryar Etesami Boeing.
TEAM ADAPTIVE REC Members Advisors Dale Calnek Jerel Hutapea Chang-Won Park Casey Radtke Academic: Dr. Sung Yi Industry: Jennifer Armbruster Todd Bauch.
Team Members: Paul Lucas Mircea Bec Khoi Nguyen Thong Truong Meshari Al Ebrahim Asgedom Gebrehiwot PSU Faculty Advisor Dr. Faryar Etesami Boeing Industry.
DESIGN OF PRODUCTS AND SERVICES Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Cross-Country Sit Ski Cody Barnett Betsy Camp Josh Metzler Robbie Quesada Mark Scheel Alex Triplett.
Design Process Design process is a collection of procedures and habits that help teams design better products.
Design and modeling 10 step design process
Ten-Stage Design Process
Introduction to Methods Engineering
A Novel Approach to Treating Pressure Ulcers
Table of Contents: Design
Investment and Productivity
Ten-Stage Design Process
Chapter 4 Product Design. Chapter 4 Product Design.
LEAN ORGANIZATION SUMMARY
Failure mode and effect analysis
Garage Parking Indicator
Campus Locator – Definition Phase (May04-04)
Formula SAE Flow Testing Device
Apparel management & quality control
SEALANT CURING OVEN Presenters Engineering Design Team
Flat Air Moving Device TEAM MEMBERS ADVISORS Bruk Yimesgen
FORCES ACTING ON YOUR SUCCESS ... OR FAILURE ____________________ Competition Patients' needs and expectations Regulations Technology Financial.
Product Design Specifications
2007 PSU Human Powered Vehicle Team
Team 505: SAE Hybrid Vehicle Battery Box and BMS
Team Members: Reuben Ness Craig Mclain Riki Hopkins
Presentation transcript:

Team Members: Thong Truong Paul Lucas Khoi Nguyen Asgedom Grehiwot Mircea Bec Meshari Ebrahim Faculty Advisor: Dr. Faryar Etesami Industrial Adviosr : Rory Olson

Background Information Mission Statement Project Plan Customer Identification Product Design Specification House of Quality Technical Risk Management Q&A

 Most of Boeing design aircrafts are affected by corrosion.  How do they prevent corrosion?  Process of preventing corrosion- sealing and curing.  The two current approaches of sealant are known as “traditional” and “lean” methods.  Advantages and disadvantages of each method.

Advantages: ― Hold many parts. ― Has humidity control. Disadvantages: ― Large Size, costly to move. ― Hardwired/Plumbed. ― Inefficient flow control

Advantages: ― Proper size and flow. ― Not hardwired. ― Apply 120v AC Disadvantages: ― No humidity control. ― Plumbed.

Design a device which can embrace the advantages of the two current methods together to produce a highly efficient curing oven. Equip the current oven with a non-corrosive, humidity control and maintain a lightweight design. Design oven will have on board water supply.

Project Milestones Task Start DateFinish DateDue Date Initial Brainstorming Jan 9Jan 28- PDS Report Jan 9Jan 28Jan 30 External Search Jan 20Feb 1Feb 27 PDS Report Presentation Jan 30Feb 13 Initial Design Feb 3Feb 20- Design Feb 20March 10- Design Evaluation March 10March 12- Progress Report Jan 30March 10March 12 Progress Report Presentation Feb 20Feb 25Feb 27 Prototype & Test April 2May 2- Redesign May 2May 10- Repeat Prototype & Test May 10May 17- Manufacture May 17Jun 1- Assemble/Install/Test Jun 1Jun 10-

Internal: PSU Capstone Program. Dr. Etesami, Capstone Instructor. Capstone Team Members. External: Boeing Company. Rory Olson, Boeing Research and Development Engineer

Performance: Quality and Reliability: Priority Maintain 135 ± 5 o F Humidity of 50% ± 5% RH 1 out of 1000 part failure. High

Life in Service: At least 5 years with little maintenance. Materials: No silicone products can be used in the fabrication or assembly of the oven. Use corrosion resistant materials. Dimensions: for this project we would be using 3’ wide x 3’ tall x 4’ deep oven. Ergonomics: Weight light of water tank(<35 lbs. and 4’ height) Priority High Medium Low

Parameter Importance Customer Engineering Criteria Competition Temperature ( o F) Humidity (% RH) Cost ($) Power Source (Volts AC) Weight (lbs) Flow Control Water Supply Current Designs Performance 10 Boeing ***** ---***-** Mobility 6 --****** ****** Testing 9 ***** ---**-- Maintenance 7 --****----- Ergonomics ***-****** Installation Project Team --*******-*****- Current Design _135N/A NoN/A - Target _13550% YesPortable -

Scope Definition: A “scope control process” will be maintained throughout the lifetime of the project. Performance: Performance of each team member will influence directly to the success of the product. Reliability: The product must be reliable since it utilizes on a daily basics. Identify the design’s weaknesses and eliminate or minimize their effects.

Background Information Mission Statement Project Plan Customer Identification Product Design Specification House of Quality Technical Risk Management