1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Camas, WA - PWG F2F Meeting August 13, 2008.

Slides:



Advertisements
Similar presentations
Printer Working Group Face-to-Face Meeting December 8, 2010
Advertisements

SunGuide TM Software Development Project Release 3.1: I-95 Express Lanes Design Review Follow-up January 29, 2008.
Altiris Denver User Group Meeting August 20, 2008.
Supplementary Figure 1 >15 alleles Sens: 44% 1-Spec: 19% alleles Sens: 54% 1-Spec: 66%
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Doc.: IEEE /098 TGd Report May 2000 Bob OHara, Chairman, TGdSlide 1 TGd Report May 2000 Meeting Seattle, WA.
Doc.: IEEE /097 TGd Agenda May 2000 Bob OHara, Chairman, TGdSlide 1 TGd Agenda May 2000 Meeting Seattle, WA.
Slide 1 FastFacts Feature Presentation August 12, 2010 We are using audio during this session, so please dial in to our conference line… Phone number:
RADEXT WG IETF-71 Agenda Friday, March 14, :00 – 11:30 AM.
PPSP WG IETF-80, Prague, March 28, 2011 Chairs: Yunfei Zhang Cullen Jennings Jabber:
1Copyright © 2007, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. MPSA/PWG Power Management Survey Results for WIMS WG Session Printer Working Group Face-to-Face.
1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Longmont, CO - PWG F2F Meeting June 25, 2008.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Irvine, CA - PWG F2F Meeting April 29,
1 Copyright © 2012 The Printer Working Group. All rights reserved. IPP Working Group Session August 7, 2012 Redmond, WA PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August 14, 2008 Camas, WA PWG F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1 IPP Working Group Session 24 June 2009 Rochester, NY - PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Seattle area, WA IDS-Microsoft F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group 17 February.
1Copyright © 2010, Printer Working Group. All rights reserved. Workgroup for Imaging Management Solutions Workgroup Session Printer Working Group/WIMS.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group October 20, 2010 Lexington, KY PWG F2F.
1Copyright © 2009, Printer Working Group. All rights reserved. MFD Meeting Agenda Monday 1:00-1:15 :Introductions, Assign Minute Taker(s) 1:15-2:15 :Discussion.
1Copyright © 2007, Printer Working Group. All rights reserved. PWG Plenary Status Report WIMS/CIM Working Group December 12, 2007 Austin, TX PWG F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1 IPP Working Group Session 18 August 2009 Redmond, WA - PWG F2F Meeting.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report IDS Working Group August 6, 2012 Redmond, WA PWG F2F Meeting Joe.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group June, 2009 Webster, NY PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Bagsværd, Denmark- PWG F2F Meeting August.
1Copyright © 2009 Printer Working Group. All rights reserved. 1Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group Session.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report IDS Working Group August 4, 2010 Bagsværd, Denmark- PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1 Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group Session 9 December 2009 Austin, TX - PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. Workgroup for Imaging Management Solutions Workgroup Session Printer Working Group/WIMS.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group April 6, 2011 Cupertino, CA PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report IPP Working Group 19 August 2009 Redmond, WA - PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Webster, NY- PWG F2F Meeting June 11, 2010.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1 Copyright © 2009, Printer Working Group. All rights reserved. 1 IPP Working Group Session 14 October 2009 Cupertino, CA - PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group February 3, 2011 Wailea-Makena, HI PWG.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2009 Waikoloa, HI PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report IDS Working Group February 2, 2011 Wailea-Makena, HI PWG F2F Meeting.
1 Copyright © 2010, Printer Working Group. All rights reserved. IPP Working Group Session 10 February 2010 Scottsdale, AZ - PWG F2F Meeting.
1 Copyright © 2010, Printer Working Group. All rights reserved. IPP Working Group Session 10 February 2010 Scottsdale, AZ - PWG F2F Meeting.
What Was Judy's Old School Like?
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
Addition Facts
SVQs Business and Administration Launch Events January/February 2011.
Writing times in digital
Welcome to Bradford GP Training Scheme Induction Course 9th and 10th August 2012.
Caritas for people with disabilities. Agenda Wednesday Caritas für Menschen mit Behinderungen 10: :45Welcome, short introduction 10:45 – 11:15Introduction.
INTERNET SHIELD COURSE F-SECURE ® ANTI-VIRUS CLIENT SECURITY 6.
We are learning how to read the 24 hour clock
Omniran ecsg 1 OmniRAN EC SG November 2013 EC Opening Report Chair: Max Riegel (NSN)
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Network Security Workshop Dhaka, Bangladesh 09 – 11 November 2013 Proudly Supported by:
Addition 1’s to 20.
25 seconds left…...
The Future of the Vermont Technology Grade Expectations January 30, 2009.
Let’s take a 15 minute break Please be back on time.
We will resume in: 25 Minutes.
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Imaging Device Security (IDS) Working Group Lexington, KY – P2600 Meeting October 24,
1Copyright © 2010, Printer Working Group. All rights reserved. MFD Meeting Logistics The documents and schema used are available from the MFD page
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2012 Redmond, WA PWG F2F.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2011 Camas, WA PWG F2F Meeting.
PWG Plenary Status Report MFD Working Group
PWG Plenary Status Imaging Device Security (IDS) Working Group
PWG Plenary Status Report Workgroup for Imaging Management Solutions
Presentation transcript:

1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Camas, WA - PWG F2F Meeting August 13, 2008

2Copyright © 2008, Printer Working Group. All rights reserved. Detailed Agenda Wednesday, Morning 9:00 Introductions 9:05 Agenda Bashing 9:10 Review Status 9:15 Approve Minutes from 8/7 Telecon 9:20 Review Health Assessment Attributes Doc 10:45 Break 11:00 Continue Review of Health Assessment Attributes Doc 12:30 End Morning session Wednesday, Afternoon 2:00 Action Item: Submission to IETF NEA WG 2:15 Review of HCD NAP Binding Specification 3:45 Break 4:00 Discuss Microsoft NAP Protocols document How to include this info into the specification 5:30 End

3Copyright © 2008, Printer Working Group. All rights reserved. Status Current effort is to Develop Assessment Attribute Specification. Second version of the spec to be reviewed Binding of Assessment Attributes into NAP. A proposal was reviewed in the 7/24 telecon The proposal is now a formal specification First review today Define the required NAP protocol stacks. Review Microsoft NAP Protocols document How to include this into a specification