1Copyright © 2009 Printer Working Group. All rights reserved. 1Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group 17 February.

Slides:



Advertisements
Similar presentations
Printer Working Group Face-to-Face Meeting December 8, 2010
Advertisements

1 Copyright © 2009, Oracle. All rights reserved. B Table Descriptions.
RADEXT WG IETF-71 Agenda Friday, March 14, :00 – 11:30 AM.
1Copyright © 2007, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. MPSA/PWG Power Management Survey Results for WIMS WG Session Printer Working Group Face-to-Face.
1Copyright © 2013 The Printer Working Group. All rights reserved. IEEE-ISTO Printer Working Group Semantic Model WG – CWMP Printer/MFD Data Model Broadband.
IPP Printer State Extensions IPP Working Group 19 February 2007 Maui Craig Whittle / Ira McDonald.
1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Longmont, CO - PWG F2F Meeting June 25, 2008.
1 Copyright © 2012 The Printer Working Group. All rights reserved. IPP Working Group Session August 7, 2012 Redmond, WA PWG F2F Meeting.
1 Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report IPP Working Group 14 October 2009 Cupertino, CA - PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August 14, 2008 Camas, WA PWG F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1 IPP Working Group Session 24 June 2009 Rochester, NY - PWG F2F Meeting.
1 Copyright © 2010, Printer Working Group. All rights reserved. – Page 1 WIMS WG – Status Update PWG Power Management Project 4 August 2010 Bagsvaerd,
1Copyright © 2010, Printer Working Group. All rights reserved. Workgroup for Imaging Management Solutions Workgroup Session Printer Working Group/WIMS.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary – PWG Last Call Imaging State & Counter MIB v2 7 February 2008 Irvine, CA PWG.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Workgroup for Imaging Management Solutions (WIMS/PMP) Printer.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG PDM WG Status (Projector & Display Management) Rick Landau, Dell PWG F2F Meeting Phoenix,
IPP Printer State Extensions PWG Plenary October 2006 Lexington.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group October 20, 2010 Lexington, KY PWG F2F.
1Copyright © 2009, Printer Working Group. All rights reserved. MFD Meeting Agenda Monday 1:00-1:15 :Introductions, Assign Minute Taker(s) 1:15-2:15 :Discussion.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report WIMS/CIM Working Group February 7, 2008 Irvine, CA PWG F2F Meeting.
1Copyright © 2007, Printer Working Group. All rights reserved. PWG Plenary Status Report WIMS/CIM Working Group December 12, 2007 Austin, TX PWG F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1 IPP Working Group Session 18 August 2009 Redmond, WA - PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2009 Cupertino, CA PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2008 Lexington, KY PWG F2F Meeting.
1 Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report IPP Working Group 10 February 2010 Scottsdale, AZ - PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report IPP Working Group 28 April 2009 Mt Laurel, NJ - PWG F2F Meeting.
IPP Printer State Extensions PWG Plenary 20 February 2007 Maui Craig Whittle / Ira McDonald.
1 Copyright © 2013 The Printer Working Group. All rights reserved. The Printer Working Group Semantic Model Working Group Camas, WA Daniel Manchala (Xerox)
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group June, 2009 Webster, NY PWG F2F Meeting.
1 Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report IPP Working Group 9 December 2009 Austin, TX - PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report WIMS/CIM Working Group February 7, 2008 Irvine, CA PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2010 Scottsdale, AZPWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Bagsværd, Denmark- PWG F2F Meeting August.
1Copyright © 2009 Printer Working Group. All rights reserved. 1Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group Session.
1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Camas, WA - PWG F2F Meeting August 13, 2008.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1 Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group Session 9 December 2009 Austin, TX - PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group December, 2009 Austin, TX PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. Workgroup for Imaging Management Solutions Workgroup Session Printer Working Group/WIMS.
1 Copyright © 2012 The Printer Working Group. All rights reserved. IPP Working Group Session June 6, 2012 Webster, NY PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group April 6, 2011 Cupertino, CA PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report IPP Working Group 19 August 2009 Redmond, WA - PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Webster, NY- PWG F2F Meeting June 11, 2010.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1 Copyright © 2009, Printer Working Group. All rights reserved. 1 IPP Working Group Session 14 October 2009 Cupertino, CA - PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group February 3, 2011 Wailea-Makena, HI PWG.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2009 Waikoloa, HI PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report IPPv2 Working Group 18 February 2009 Waikoloa, HI - PWG F2F Meeting.
1 Copyright © 2010, Printer Working Group. All rights reserved. IPP Working Group Session 10 February 2010 Scottsdale, AZ - PWG F2F Meeting.
1 Copyright © 2010, Printer Working Group. All rights reserved. IPP Working Group Session 10 February 2010 Scottsdale, AZ - PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report Workgroup for Imaging Management Solutions (WIMS/PMP) Printer.
1Copyright © 2012, Printer Working Group. All rights reserved. Semantic Model Meeting Logistics The documents and schema used are available from the SM.
January 6. January 7 January 8 January 9 January 10.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2011 Wailea, HI PWG F2F Meeting.
1Copyright © 2013, Printer Working Group. All rights reserved. Semantic Model Working Group Agenda February 6, 2013 El Segundo, CA PWG F2F Meeting Daniel.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group December, 2012 Irvine, CA PWG F2F.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group Decemberr, 2010 Irvine, CA PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. MFD Meeting Logistics The documents and schema used are available from the MFD page
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2010 Lexington, KY PWG F2F Meeting.
SunSatFriThursWedTuesMon January
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August, 2010 Bagsværd, DenmarkPWG F2F Meeting.
PWG Plenary Status Report MFD Working Group
PWG Plenary Status Report Semantic Model Working Group
PWG Plenary Status Report MFD Working Group
PWG Plenary Status Report MFD Working Group
PWG PDM WG Status (Projector & Display Management)
Presentation transcript:

1Copyright © 2009 Printer Working Group. All rights reserved. 1Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group 17 February 2009 Waikoloa, HI - PWG F2F Meeting

2Copyright © 2009 Printer Working Group. All rights reserved. IPP WG Meeting Agenda 17 February 2009 – Waikoloa, HI 8:00-8:15Introductions, Assign Minute Takers 8:15-9:15IPP/2.0 Review and Discussion 9:15-10:00IPP PSX Review and Discussion 10:00-10:15IPP Production Printing Set2 10:15-10:30 Action Items and Next Steps

3Copyright © 2009 Printer Working Group. All rights reserved. 3Copyright © 2008, Printer Working Group. All rights reserved. Current Status IPP/2.0 Status is Stable Draft Working Group last call ends 6 March Required Operations and Attributes list is stable Current version is 24 January ftp://ftp.pwg.org/pub/pwg/ipp/ippv2-wd/wd-ipp pdf IPP Printer State Reasons Extensions (PSX) Status is Prototype Draft Working Group last call ends 6 March IPP Printer MIB mapping tables are stable Current version is 8 February ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippstate pdfftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippstate pdf

4Copyright © 2009 Printer Working Group. All rights reserved. 4Copyright © 2008, Printer Working Group. All rights reserved. Next Steps IPP/2.0 Complete WG last call and revisions Publish as second Stable Draft (2.0/2.1) PWG Last Call spanning April PWG F2F IPP Printer State Reasons Extensions (PSX) Complete WG last call and revisions Complete IANA Considerations (IPP & Printer MIB) Publish as first Stable Draft PWG Last Call spanning April PWG F2F IPP Production Printing Set2 Interim Draft by April PWG F2F Include in IPP/2.0 Second Edition (later 2009)