1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.

Slides:



Advertisements
Similar presentations
Printer Working Group Face-to-Face Meeting December 8, 2010
Advertisements

PWG Quarterly Oct 2006 WIMS CIM Update Project Status Rick Landau Dell, CTO Office 2007/02/08 V0.1.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG-DMTF Alliance Work Rick Landau, Dell Printer Working Group (PWG) DMTF Alliance Partner.
1Copyright © 2007, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
PWG Quarterly Oct 2006 WIMS CIM Update Project Status Rick Landau Dell, CTO Office 2006/10/25 v0.1.
IPP Printer State Extensions IPP Working Group 19 February 2007 Maui Craig Whittle / Ira McDonald.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August 14, 2008 Camas, WA PWG F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1 IPP Working Group Session 24 June 2009 Rochester, NY - PWG F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group 17 February.
1Copyright © 2010, Printer Working Group. All rights reserved. Workgroup for Imaging Management Solutions Workgroup Session Printer Working Group/WIMS.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary – PWG Last Call Imaging State & Counter MIB v2 7 February 2008 Irvine, CA PWG.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Workgroup for Imaging Management Solutions (WIMS/PMP) Printer.
IPP Printer State Extensions PWG Plenary October 2006 Lexington.
1Copyright © 2011 The Printer Working Group. All rights reserved. Workgroup for Imaging Management Solutions (WIMS/PMP) April 5, 2011 Cupertino, CA PWG.
PWG Quarterly Apr 2007 WIMS CIM Update Project Status Rick Landau Dell, CTO Office 2007/04/17 V0.1.
1Copyright © 2009, Printer Working Group. All rights reserved. MFD Meeting Agenda Monday 1:00-1:15 :Introductions, Assign Minute Taker(s) 1:15-2:15 :Discussion.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report WIMS/CIM Working Group February 7, 2008 Irvine, CA PWG F2F Meeting.
1Copyright © 2007, Printer Working Group. All rights reserved. PWG Plenary Status Report WIMS/CIM Working Group December 12, 2007 Austin, TX PWG F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1 IPP Working Group Session 18 August 2009 Redmond, WA - PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2009 Cupertino, CA PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2008 Lexington, KY PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report WIMS/CIM Working Group December, 2008.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report WIMS/CIM Working Group February 7, 2008 Irvine, CA PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2010 Scottsdale, AZPWG F2F Meeting.
April 5 th, 2006 BOF – PWG MIB Implementers Guide 1 Printer Working Group BOF – PWG MIB Implementers Guide PWG Meeting Mt. Laurel, NJ April 5 th, 2006.
1Copyright © 2009 Printer Working Group. All rights reserved. 1Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group Session.
1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Camas, WA - PWG F2F Meeting August 13, 2008.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1 Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group Session 9 December 2009 Austin, TX - PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group December, 2009 Austin, TX PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. Workgroup for Imaging Management Solutions Workgroup Session Printer Working Group/WIMS.
PWG F2F Mtg, Plenary Session, August 2008 WIMS-CIM WG Status Rick Landau Dell, CTO Office 2007/08/08 v0.1.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1 Copyright © 2009, Printer Working Group. All rights reserved. 1 IPP Working Group Session 14 October 2009 Cupertino, CA - PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2009 Waikoloa, HI PWG F2F Meeting.
PWG F2F Mtg, Plenary Session, June 2008 WIMS-CIM WG Status Rick Landau Dell, CTO Office 2007/06/25 v0.1.
1 Copyright © 2010, Printer Working Group. All rights reserved. IPP Working Group Session 10 February 2010 Scottsdale, AZ - PWG F2F Meeting.
1 Copyright © 2010, Printer Working Group. All rights reserved. IPP Working Group Session 10 February 2010 Scottsdale, AZ - PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report Workgroup for Imaging Management Solutions (WIMS/PMP) Printer.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2011 Wailea, HI PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group December, 2011 Austin, TX PWG F2F.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group December, 2012 Irvine, CA PWG F2F.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group Decemberr, 2010 Irvine, CA PWG F2F Meeting.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group February, 2012 Irvine, CA PWG F2F.
1Copyright © 2010, Printer Working Group. All rights reserved. MFD Meeting Logistics The documents and schema used are available from the MFD page
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2010 Lexington, KY PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August, 2009 Redmond, WA PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August, 2010 Bagsværd, DenmarkPWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February 7, 2008 Irvine, CA PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2011 Camas, WA PWG F2F Meeting.
PWG Plenary Status Report MFD Working Group
PWG Plenary Status Report MFD Working Group
Proposed Alert Table Extension For Multi-Function Printers
IEEE-ISTO PWG Web-based Imaging Management System WIMS Working Group
PWG Plenary Status Report Workgroup for Imaging Management Solutions
Web-based Imaging Management System WG
Web-based Imaging Management System WG
PWG Plenary Status Report MFD Working Group
Web-based Imaging Management System Working Group - WIMS
Web-based Imaging Management System Including CIM Realignment
Semantic Model Workgroup
PWG-DMTF Alliance Work
Printer Working Group Face-to-Face Meeting 19 February 2007
Web-based Imaging Management System Working Group - WIMS
IEEE-ISTO PWG WIMS DMTF/CIM – PWG Realignment
Web-based Imaging Management System WIMS & CIM Realignment
Semantic Model Working Group
Web-based Imaging Management Service WIMS Working Group
Presentation transcript:

1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting December 4, 2008 Irvine, CA

2Copyright © 2008, Printer Working Group. All rights reserved. WIMS WG Agenda 13:00 – 13:10 Introduction 13:10 – 14:10Proxy CIM Provider Prototype 14:10 – 14:25Break 14:25 – 15:25 Future Projects/Potential MIB Activity 15:25 – 15:30Wrapup

Initial Details Intellectual Properties Policy Statement This meeting is being held in accord with the PWG Intellectual Properties Policy. Identify Minute Taker Agenda modifications Acceptance of Previous Minutes F-2-F: ftp://ftp.pwg.org/pub/pwg/wims/minutes/08OCT- Lexington-WIMS-CIM-face-to-face.pdf ConCall: ftp://ftp.pwg.org/pub/pwg/wims/minutes/cim_ pdf 3Copyright © 2008, Printer Working Group. All rights reserved.

Dell CIM Provider Prototype An SNMP to CIM Provider is being prototyped by Rick Landau. The primary purposes of this prototype are to: Validate the updated Printer CIM Schema. Provide one implementation of the CIM Schema to help advance the new elements from the experimental state. Rick>> 4Copyright © 2008, Printer Working Group. All rights reserved.

Future Projects - Objectives Evangelizing and perhaps sponsoring development activities for Web Service Management of Printers Default consensus is to restrict our WS specific activities to creating CIM schema. Develop standardized management elements for MFDs. Suggestion that existence of a standard will encourage implementation of the stabdard (in addition to proprietary). Path to standard WS management elements may start with standard SNMP MIBs. 5Copyright © 2008, Printer Working Group. All rights reserved.

Futures Discussion – PMP WG No new leadership has emerged for PWG MIB WG (PMP). WIMS will assume PMP responsibilities. What form should be taken?. Keep PMP as separate WG? Run two WGs in parallel? Merge two WG into one hardcopy device management WG? Depends on level of PMP type activities 6Copyright © 2008, Printer Working Group. All rights reserved.

Futures Discussion – PMP Projects Update and Publicize Printer MIB FAQ Current FAQ is out of date and hidden Most of us are aware of implementation eccentricities Users and Fleet Management Agencies both need to understand some of these variations, and should have some place to voice their questions. Printer Port Monitor MIB update spec interoperability testing ? advance PPM to PWG standard ? MDF MIB or MIB extensions? Many attempts, of varying completeness, started in the past but were not complete MFD group is addressing service semantics; need to address management elements Power Management objects Green Issue. What elements? Existing private MIB/CIM Mapping? New MIB or Augmentation/Extension of existing MIB? 7Copyright © 2008 Printer Working Group. All rights reserved.

Previous MFD Management Initiatives Network Scanner MIB – 2000 version based on Printer MIB from MFPA – Never completed or seriously reviewed ftp://ftp.pwg.org/pub/pwg/pmp/contributions/Scanmib8.txt Iras initial Cut at an MFP MIB – 2004 – Considered too ambitious at the time. Some elements made it into Counter MIB and Printer Schema 2 ftp://ftp.pwg.org/pub/pwg/wims/mibs/imaging-system-mib mib Xerox 2006 Approach to changing HR MIB, Printer MIB to accommodate MFD Alerts – Dropped in favor of MIB Alert Table Groups Extension ftp://ftp.pwg.org/pub/pwg/pmp/contributions/Xerox-Proposed- MFD-changes-for-Printer-related-RFCs-v2.pdf PWG Printer for Multi-Function Devices, March 2007 ftp://ftp.pwg.org/pub/pwg/pmp/wd/wd-mfp-alert-groups pdf enums-only extension to Printer MIB for scan, fax, etc., MFD alerts in existing prtAlertTable Rationale:ftp://ftp.pwg.org/pub/pwg/pmp/contributions/Rationale-for- MFD-Alert-Table-Ex tensions.pdf Status:ready for prototype - technically complete

9Copyright © 2008, Printer Working Group. All rights reserved. Futures Discussion –CIM Print Services CIM Schema - In progress Printer Profile – Expose elements from networked printer MIB-II elements in CIM networked Computer System approach; also basis for the basic computing device in MFP Expansion to MFPs awaits establishment and implementation of standard MFP management elements

PMP WG/WIMS-CIM WG What form should combination take? Keep PMP as separate WG? Keep separate Names, Mail lists, FTP directories, Web Pages Have separate meetings conference calls (when meetings are necessary) Run two WGs in parallel? Keep separate Names, Mail lists, FTP directories, Web Pages Address MIB issues (when necessary) during WIMS meetings Copy WIMS minutes to PMP directory/list when PMP topics discussed. Merge two WG into one hardcopy device management WG? Name? WIMS/PMP, WIMS, PMP, HCDM ? Consideration of PMP role as identified printer MIB reference 10Copyright © 2008, Printer Working Group. All rights reserved.

Wrapup Summary of Conclusions Schedule Estimates Action Items Thanks for your participation! 11Copyright © 2008, Printer Working Group. All rights reserved.