PREX main detector Piotr Decowski Aimee Shore Smith College Piotr Decowski Aimee Shore Smith College Kumar Krishna Jon Wexler Patrick Rogan Vireak Yim.

Slides:



Advertisements
Similar presentations
Antonin Vacheret DAPNIA/SPhN, CEA Saclay.HAPPEX II Jlab Hall A Electron detectors for HAPPEX2 and He Installation in HRS Linearity tests 4.
Advertisements

PREx detectors Progress report Krishna Kumar Keith Otis UMass Piotr Decowski Selamnesh Nida Smith College Collaboration Meeting, May 17-18,2007.
E status report Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting December 13 th 2007.
BigBite Hadron Detector Status Hall A Collaboration Meeting Xiaohui Zhan On behalf of the E collaboration MIT Jun 21, 2007.
Bigbite Frame Modification & Trigger Plane Bigbite Family Readiness Review Xiaohui Zhan MIT March 19, 2007.
T. Lux. 13/12/ Charged particles X-ray (UV) Photons Cathode Anode Amplification Provides: xy position Energy (z position) e- CsI coating.
PHYSICS InClass by SSL Technologies with S. Lancione Exercise-55
TPC meeting, CERN, January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, January 2003 Børge Svane Nielsen Niels Bohr.
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Barrel PID upgrade K. Inami (Nagoya-u) and PID group - R&D status - TOP counter - iTOP - Focusing DIRC - To do, cost estimation.
QUARTZTOFMike Albrow CMS-FP420 April 28 th 2008 QUARTZTOF An isochronous & achromatic Cerenkov Counter Making Cerenkov light parallel  point focusing.
HCAL-J Status Hadron Calorimeter HCAL-J SBS Collaboration Meeting July, 2014 G. B. Franklin Carnegie Mellon University 7/8/2014 Carnegie Mellon INFN, Catania.
Old Main Group. Design Issues There are no changes to the overall Design It will remain the way it is The Attachment Issue is resolved Going to screw.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
1 Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter 06/23/2003 Kurt Francis - Northern Illinois University.
Focal Plane Scanner Jeff Martin University of Winnipeg with: Jie Pan, Peiqing Wang, David Harrison.
KEK beam test H. Sakamoto. Purpose To optimize a concentration of the second dopant for scintillating fibers KEK beam test to study light yields for various.
CKOV1 folded geometry 1. Optimization 2. Pion-muon separation 3. Instrumented area 4. Possible developments November 16, 2005 Gh. Grégoire Contents.
Mar 31, 2005Steve Kahn -- Ckov and Tof Detector Simulation 1 Ckov1, Ckov2, Tof2 MICE Pid Tele-Meeting Steve Kahn 31 March 2005.
Review of PID simulation & reconstruction in G4MICE Yordan Karadzhov Sofia university “St. Kliment Ohridski” Content : 1 TOF 2 Cerenkov.
Could CKOV1 become RICH? 1. Simulations 2. Sensitive area of the detection plane 3. Example of a workable solution 4. Geometrical efficiency of the photon.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
Jun 27, 2005S. Kahn -- Ckov1 Simulation 1 Ckov1 Simulation and Performance Steve Kahn June 27, 2005 MICE Collaboration PID Meeting.
27 Jun 2005S. Kahn -- Tof/Ckov Status1 Status of TOF and Ckov Sub- packages in G4Mice Steve Kahn 27 June 2005.
E-  identification 1. Reminder from previous presentations, questions, remarks 2. Čerenkov option 3. Study of several optical configurations 4. Conclusions.
Forward Detectors and Measurement of Proton-Antiproton Collision Rates by Zachary Einzig, Mentor Michele Gallinaro INTRODUCTION THE DETECTORS EXPERIMENTAL.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
CEDAR Support Structure and PMT Test Peter Sutcliffe 13 th July 2011 CERN via EVO.
Central Neutron Detector March ’11 Update Central Neutron Detector March ’11 Update Daria Sokhan IPN Orsay CLAS 12 GeV Workshop Paris, France – 9 th March.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
K1.8 meeting Report from E05 group Toshiyuki Gogami 26 Dec 2014.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
SoLID EC Update Zhiwen Zhao 2012/05/22. Beam test update Coverage for PVDIS Road map.
Feb 10, 2005 S. Kahn -- Pid Detectors in G4MicePage 1 Pid Detector Implementation in G4Mice Steve Kahn Brookhaven National Lab 10 Feb 2005.
CLAS12 activity at IPNO D2I: Design, realization and test of the Central Neutron Detector J. Bettane, J.L. Cercus, B. Genolini, G. Hull, M. Imre, A. Maroni,
Status of Aerogel detector for high pT upgrade at PHENIX Budget from US-J project for next two years : (1) 400 liters of Aerogel (2) 600 photomultiplier.
Performance of CRTNT for Sub-EeV Cosmoc Ray Measurement Zhen Cao IHEP, Beijing & Univ. of Utah, SLC Aspen, CO, 04/2005.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Electromagnetic Calorimeter for HADES at SIS100: MAMI and CERN test results Lead-glass modules Tests -  beam at MAMI energy resolution -  - /e - beam.
Water Tank as the Outer Muon Veto Mingjun Chen
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
Development of TOP counter for Super B factory K. Inami (Nagoya university) 2007/10/ th International Workshop on Ring Imaging Cherenkov Counters.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Nov Beam Catcher in KOPIO (H. Mikata Kaon mini worksyop1 Beam Catcher in the KOPIO experiment Hideki Morii (Kyoto Univ.) for the KOPIO.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
O. Atramentov, American Linear Collider Workshop, Cornell U July 2003 Fast gas Cherenkov Luminosity Monitor Progress Update O. Atramentov, J.Hauptman.
Detectors for PREx Collaboration Meeting, April 17-18, 2009 Piotr Decowski, Smith College Krishna Kumar. UMass.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
1 Plannar Active Absorber Calorimeter Adam Para, Niki Saoulidou, Hans Wenzel, Shin-Shan Yu Fermialb Tianchi Zhao University of Washington ACFA Meeting.
TORCH IOP meeting Manchester March 31, 2015 TORCH Maarten van Dijk On behalf of the TORCH collaboration (CERN, University of Oxford,
Aerogel detector revisited Sokolov Oleksiy, UNAM, progress report, 20 Sept 2006 E int = M – wall reflectivity є – PMT relative area Belle geometry (traditional):
Eli Piasetzky Tel Aviv University Beam Scintillating Fibers PSI, Technical Review, July 2012 Guy Ron Hebrew University Israel.
CKOV1 design status 1. Generation of muon and pion beam files 2. PID performances with water radiator 3. Does it help with fluorocarbon FC72 ? 4. Conclusion.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
SuperB – IFR status of the detector & tooling development 1V. Carassiti - INFN FEINP PAN 07-09/09/2012.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Focal Plane Scanner Jie Pan * + for the scanner working group Laura Cobus*, Anna Micherdzinska* Jeff Martin*, Peiqing Wang + * University of Winnipeg /
Focal Plane Scanner Jeff Martin University of Winnipeg
SHMS Aerogel Detector Construction is complete
“Performance test of a lead glass
Presentation transcript:

PREX main detector Piotr Decowski Aimee Shore Smith College Piotr Decowski Aimee Shore Smith College Kumar Krishna Jon Wexler Patrick Rogan Vireak Yim UMass Kumar Krishna Jon Wexler Patrick Rogan Vireak Yim UMass PREx Collaboration Meeting Feb , 2010 PREx Collaboration Meeting Feb , 2010

Outline Detector assembly in HRS focal plane Detector head and its optimization A T - hole detector Progress of construction Other tasks Issues

Detector assembly Beam Two pairs of GEMs Two main detectors Scintillator trigger Quartz blocks and reflectors

Detector assembly, cont. All dimensions and positioning in respect to the VDC are determined and fixed. The information about exact detector position will allow to finalize details of beam optics in the HRS hut (John LeRose)

Detector assembly mounted in the HRS focal plane Trigger Main detectors Beam X-Y movers Unistrut support GEMs

Another view

GEM support details GEMs ElectronicsSupports for electronics These parts will be machined in the Umass, UVA, and Smith College shops. Smith Colleges shop is equipped with computer controlled powerful water jet cutter, which wil be used to cut more elaborated shapes.

Location of the main detector head in the HRS focal plane (Dustins simulations) Quartz holder bar at save distance from the beam (no beam splash) Detector head PMT 14 cm long and 3.5 cm wide quartz

Detector head: Optimization of reflector 14 cm long quartz Conical mirror PMT Tube GEANT simulations: - range of reflectivity coefficients - specular versus diffuse reflection Geometry

Results of Simulations X dependence of PE number (dispersive direction) Y dependence of PE number (transverse direction) Specular reflection Diffuse reflection These regions were tested using cosmic rays PMT side PMT side 14 cm * 4 cm quartz For typical reflectivity % expected number of PEs ~

Setup for cosmic tests Quartz made from 6 smaller pieces PMT Lead filter One of the trigger detectors

Results from cosmic tests Region 1 Region 2 Number of PEs sqrt(PE) Painted flat mirrors Painted cone White paper cone Flat Al mirrors Painted quartz Al cone Wrapped mylar No mirrors Al cone No mirrors Flat Al mirrors Painted cone White paper cone Wrapped mylar Painted quartz Painted flat mirrors Best results Region 2 Best: Painted flat mirror? Painted quartz?

Paint 250 nm2500 nm

A T - hole detector Separate detector on X - Y movers attached to the 45 deg side yellow beam of the focal plane cage. 4 cm * 4 cm quartz tangent to the Cherenkov cone. Detector axis in the beam - y axis plane, at angle 45 deg in respect to the beam. Dustins plots

Status of the detector construction - Most of the parts for detector heads are ready - The design of the detector assembly is finalized, drawings are in the final stage and in the next few days will be given to the machine shop - PMTs are purchased - PMT bases must be modified to be able to accommodate -2000V, out of 9 bases 4 are ready - Quartz and movers are ordered

Other tasks - Setup for measurements of gains of all PMTs by single photon counting is ready, we are still waiting for return of CAEN ADC from repair in Italy - Blue LEDs are purchased and will be mounted in the detector heads for in beam monitoring of PMT linearity

Issues The most serious problem is uncertainty in delivery time of ordered quartz blocks. They should be delivered before the end of February, however, the manufacturer informed us that there will be a delay caused by bandsaw failure. The projected delivery time is now the beginning of the second week of March. For any case we are preparing four 13.4 cm long pieces of quartz, each made from 6 smaller pieces.