Helium Bag Readiness. Scattering chamber Clamshell flange (not here yet) Coffee can collimator 0.005 Polyurethane Balloon (sides only) 10 m Mylar Balloon.

Slides:



Advertisements
Similar presentations
D.T. unit 5C: Moving Toys How to make a moving toy.
Advertisements

Health and Safety! Before you begin making your frames it is very important that you understand the safety issues involved.
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Run Plan Document E04-007: Threshold Pion Production.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Chubaka Producciones Presenta :.
Status Update on Mechanical Prototype in Rome November 6,
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Status report for Helium bag and Gauss meter installation for D Hiroshi Kou.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
By: Nate Miller Micah Nichols Kristine Rundorff. Dry Cleaning Bags Cotton Balls Petroleum Jelly Straws Scotch Tape.
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - prototypes validation and pipe production - microflanges and fixation system - the intervention.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
JPARC- Decay Volume M.Sakuda (KEK) 11 November Decay Volume Requirements Design 2. Construction Status 3. Summary and schedule In collaboration.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
Readiness Review for Jlab Experiment E Hall A and BigBite Collaboration experiment Approved Jan 2004 for 16 days Precision Measurement of the Electroproduction.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Update on the Hall C Monte Carlo simulation for 12 GeV Mark Jones.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
Resistive protections Rui de Oliveira 09/12/15
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
CLAS12 Drift Chamber Prototyping
The Q Weak Experiment Event tracking, luminosity monitors, and backgrounds John Leacock Virginia Tech on behalf of the Q Weak collaboration Hall C Users.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Thermodynamics – branch of physics concerned with the study of both thermal and mechanical (or dynamical) concepts. Application: Steam Engines in 1800’s.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Update on Pavia MM mechanical prototype
Gaspard-Hyde-Trace workshop 2015
new straw end plug: D=10.6 mm straws support frame Levan option
Quality Control in Straw Production
The interaction region for FIRST (status report)
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Liquid target system for New TPC experiment
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
Teacher name August phone: Enter text here.
Circle Chart Template Process Name.
Tropical cyclones movement
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Helium Bag Readiness

Scattering chamber Clamshell flange (not here yet) Coffee can collimator Polyurethane Balloon (sides only) 10 m Mylar Balloon Front wire chamber Upgraded Rear wire chamber E Plane 20 H targetElectron Beam 10 m mylar foil

Transport of low energy protons ( MeV/c) from target through BigBite to MWDC Transport protons using helium a few mm above atmospheric pressure. Almost as good as using vacuum. More convenient and cheaper. Use company that makes polyurethane helium filled balloons of all shapes and sizes. Polyurethane skin thick. Will lose helium slowly over a few days. Test leakage rate. Flexible enough to have limited angular movement of BigBite. Show sample material. Stretched over circular snout fixed to scattering chamber and hot glued Stretched over rectangular angle aluminum attached to wire chamber frame and hot glued Investigate stability of the system and radiation damage of polyurethane and glue and measure helium loss rates.

Shape of Polyurethane Helium Filled Balloon cm 44.0 cm 33.1 cm 38.7 cm Bottom view 2 Deg 5 cm 25.2 cm 18 Deg Side view cm 33.8 cm cm 82.3 cm 5 cm Stretch over aluminum support frame and hot glue poly and terminate with 10 m mylar Stretch over coffee can collimator and hot glue

Test on Balloons Need to always keep inflated above atmospheric pressure Monitor during the experiment. This is crucial. Mechanical stability of of joints and seams and leak rates On the polyurethane balloons and mylar balloons Conduct radiation damage test on both types. –Effects on hot glue joints –Effects on seams –Effects on polyurethane

Balloon Milestones March –Design/Draft shape of polyurethane helium containment balloon –Design Coupling balloon to chamber –Order sample polyurethane balloon material April –Order prototype polyurethane balloon ( thick) and prototype and 10 m mylar pillow shape balloon. -Order two extra balloons for protecting PMTs from helium leaks -Design Helium gas handling system for balloon May –Test all prototype balloons for helium leak rate and radiation damage –Test gas handling system. June-July –Evaluate test results and make modifications. Decide on many balloons and type. Purchase final balloons August –Assemble flanges, collimator, window, gas handling system, and balloon for further testing. September, November, and December –Continue checking out system and measure loss rates over long term