Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.

Slides:



Advertisements
Similar presentations
Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC 15 April :19: UFO event detected by on BLM 15.R8 and beam dump 8:46: P2 cold compressor trip and recovery during morning shift. Access given.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
:30 meetingEBH 1  7:53 start VdM scans LHCb  8:18 beam dump: RF M2B1 crowbar (3 rd time within 24 hours)  Access for RF  Changed thyratron.
LHC 1 st August :34 Dump on TDI.B2 jaw position while filling –Checks and change TDI.B2 reference position by 0.1 mm outwards 09:40 Lost cryo in.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
05:31 Beam dump due to QPS trigger in sector 78.  Quench heaters discharged in MB10.L8. 07:28 Quench heaters charged ok again in cell B10L8.  Was a EN/EL.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Stéphane Gabourin TE/MPE-EP MPP – 23 th Oct 2015 CIBDS beam dump triggers due to glitches in BIS loop B1-A diagnosis and mitigation measures.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Monday 11/07: Recovery Plenty of accesses.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Wednesday 31 October: Morning
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
Scrubbing progress - 09/12/2012
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Wire almost entirely through beam before BLM triggers dump
LHC Morning Meeting - G. Arduini
Technical Stop #4 29th August - 2nd September 2011
Wednesday 03/11 – The Plan Finish electron-cloud program:
Wednesday 10/5 Cryo recovery until 18:30
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
LHC Morning Meeting - G. Arduini
Tue/Wed 12/ :00 Probe beam back again
07/08/2010 Fill #1264 dump at 02:14:38.
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Tuesday 20 September 2011.
Wednesday 23/2 Thanks CRYO!!!.
Coordination: Eva Barbara Holzer, Mike Lamont
Thursday Morning/Afternoon
Tuesday
Monday 152 bunch operation summary
Presentation transcript:

Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC finished (replacement of optical fiber receiver in point 8) 13:00-15:00 Large emittance beam in the SPS. Tuning of the machine 15:00-17:00: check of injection 17:00 - ongoing: Cryo problem in point 8 In the shadow: – Access for: TOTEM, ALICE, CMS. Loss of patrol PM56 (PAD) – Damper intervention

RF End of RF intervention: The problem with 6B1 was traced to the electronics of the monitoring of the Mod Anode current. This is a LEP heritage: It would detect a klystron instability where the electrons would return backward in the tube, from the output cavity back to the grid (backscattered electrons). This never happened with the LHC klystrons because they are driven far from saturation (150 kW for 220 kW max). This interlock was kept however as it also monitors the cathode heating current. Over the last 24 h the cathode heating is normal. So it was decided to increase the threshold for the Mod Anode current. Cavity 6B1 back in operation. Voltages and coupler positions returned to normal. RF Beam dump conditions back to normal: Any klystron trip will dump the beam. OK to increase intensity. David et Philippe

3 of these cases Sun 18/6 at 07:48:44 – Global beam permit B2-A T->F: 07:48: – Dump request B2 TSU-A: 07:48: (BIS fast) – Dump trigger: 07:48: – Dump request B2 TSU-B: 07:48: (BETS fast) First BLM trigger: – 07:48: – i.e. after the beam dump No LBDS internal fault Beam dumps due to BIC (E. Carlier, B. Puccio, B. Todd)

a glitch propagated UA87-SR7-TZ76-UA67 in the A permit loop for Beam 2 The glitch was long enough to cause the generator A to switch off. Replaced optical receiver for the optical fiber in point 8 (most likely source of the problem) Expert following the behaviour of BIS after the intervention Beam dumps due to BIC (B. Puccio, B. Todd)

Injection (V. Kain)

Beam 1: 1 injection out of 9 was with bigger oscillations. Origin not clear yet. Correction for beam 1 mostly occurring at MCIAH (could be also upstream)  analysis ongoing Also, beam 2 is jittering a bit. The way around it is to have enough margin and correct only with enough statistics. – e.g.: use the 12b injection scheme, check the proposed corrections. If the same correction corresponds to MOST of the injections, then send it and check with the remaining injections. Injection (V. Kain)

Filters on one warm compressor in point 8 starting to clog. Decided to switch to “spare” warm compressor on Friday afternoon. Saturday: Filters of the “spare” warm compressor starting to give signs of clogging Call in maintenance team to clean filters of the “main” compressor. Done and restarted successfully During the switch off of the “spare” compressor reduction of the oil pressure leading to a stop of the installation Cryogenics problem

Vacuum Keeping an eye on vacuum. We have preventively closed the vacuum valves in point 8 and 1. Cryo team keeping beam screen temperature higher than cold mass Might need “bake- out” of the beam screen. Follow-up with vacuum expert.

Cryo recovery: not before 22:00 Restart this evening. Plan