From 31 July 2009 To 01 August 2010 RC-W CERP PROJECTs REPORTED IN CIDNE IN THE LAST 12 MONTHS UNCLASSIFIED.

Slides:



Advertisements
Similar presentations
©2010 Information Age Publishing 1 The Violence Volcano Chapter 1 How Workplace Violence Has Grown.
Advertisements

David Ensley, Chief Research and Data Analysis Program Statistics.
August July 2010 Annual Academic Calendar Colegio Los Robles.
SodexoUSA.com 12/14/11 Distinguished Dietitian. 2 The purpose of this presentation is to 1.Inform Area 326 managers of the Distinguished Dietitian award.
Presentation Title Here Second Line if Necessary Month 00, 2009 Presenter(s): First Name Here Second Name Here (if necessary) Third Name Here (if necessary)
Regional Registry/Registrar Events Tim Cole Chief Registrar Liaison 7 March 2010.
Islamic Republic of Afghanistan Independent Directorate of Local Governance Evaluation of Human Resources in the Provinces and Districts Presentation July.
RC-S CERP PROJECTs REPORTED IN CIDNE IN THE LAST 12 MONTHS From 31 July 2009 To 01 August 2010.
RC-SW CERP PROJECTs REPORTED IN CIDNE IN THE LAST 12 MONTHS From 31 July 2009 To 01 August 2010.
RC-N CERP PROJECTs REPORTED IN CIDNE IN THE LAST 12 MONTHS From 31 July 2009 To 01 August 2010.
HEART TRANSPLANTATION
King Conservation District Grants 2010 Allocation Guidance WRIA 8 Salmon Recovery Council March 18, 2010.
Project Plan for VMC. VMC Project [1.0.0] [labor-hour = 1956 hr] Project Management [1.1.0] [labor-hour = 196 hr] System Engineering [1.2.0] [labor-hour.
June 11, 2009 Board Meeting Presented by: Sharonica L. Hardin, PHR, St. Louis Public Schools & Matt McGrath, Holmes Murphy & Associates.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
The Western Electricity Coordinating Council Document Categorization Project Steve Ashbaker February 19, 2009 RPIC Meeting – February 19, 2009.
2008 May 31Standards PD: Day 2 morning: slide 1 Feedback from Yesterday We want to begin today by reviewing some the things you said yesterday afternoon.
No Child Left Behind Adequate Yearly Progress Report July 22, 2009.
Instructions for using this template. Remember this is Jeopardy, so where I have written Answer this is the prompt the students will see, and where I.
Steve Kimble FTE Administrator Leon County School District FTE TRAINING August 2009.
Calendar Lesson Parts of the Calendar Created by: Ramona Lewis-Dailey.
Data Included: Caseload by Age Group Caseload by Child Care Account Caseload by Program Setting Caseload IE Contracts.
TREx ESC Coordinator Training April Agenda Version 3.6 Enhancements Required vs Recommended Frequently Asked Questions Questions?
Department Leadership Teams Involving Everyone in the Plan on a Page! November 17, 2009.
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
9 November 2009.
ILH ED Door to Doc. Two Phase Improvement 1.Combine Triage and Quick Reg March 16, Implement ED KaT July 16, 2010.
Keeping Students First Answering Commonly Asked Questions About the Impact of the Budget System Parents Meeting April 27, 2011 Calgary Board of Education.
Learn all about the year.
Georgia Building Authority Parking & Access Services Online Building Access System Agency Access Reports August 26, 2010.
Leave &Time Reporting. Employee Categories Faculty (benefits eligible) < 12 month (9 month): summer appointments dont count! 12 month Staff (benefits.
New way of systematic management of delay reduction projects in courts – combining external expertise and internal participation FINLAND.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
Plan of action The duration of the action will be 30 months (this includes 5 months for winding up the action and 1 month extra in case of delay).
Detlef Swoboda. Copyright © All rights reserved. Jul 2008 Channel from Cherbourg to Portsmouth 26 July – 2 August 2008.
TROY UNIVERSITY MPA COURSE COMPARABILITY August, 2009 – July, 2010 FACULTY Fulltime:22 Adjunct: COURSES Taught by Fulltime:99 (70.7%) Taught by Adjunct:41.
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
Solids In Contact Auxiliary Projection. Notes Determine the projections of the sphere C, which touches the sphere B at a point 39mm above the horizontal.

Immunisation rates: How is Moreton Bay General Practice Network doing? Jane Sanders Acting Team Leader - Programs.
WALT: Know the months of the year poem. Answer questions about the months.
Calculation and Submission of Operating Subsidy Training
Find the measure of each angle. Justify your answer.
1 UNCLASSIFIED//FOUO Effects - Sean Currans – AG Th 20 October 2012 AG Brief TF Centurion (136 MEB) This briefing located at: TBD.
PRU Census 2011 Headlines 1 Version 1.0.  Where an establishment has an Establishment Number between 1100 and 1150 (inclusive) they will be deemed to.
School Census Summer 2010 Headlines 1 Jim Haywood Product Manager for Statutory Returns Version 1.0.
Regional TV Effectiveness Study Automotive: Hyundai i30 Regional TV was a major contributor to most successful new small car launch of past.
Name ____________________ Date ___________ Period ____.
Analyzing Genes and Genomes
Fund Balances What are fund balances? Why does _____ ISD maintain a fund balance in the General Fund?
Essential Cell Biology
Essential Cell Biology
Highlights From the Survey on the Use of Funds Under Title II, Part A
Energy Generation in Mitochondria and Chlorplasts
Romania Mean Wind Speed / metres per second Mast height – 80 metres Wind Data recorded over 2 years
Teacher Turnover Teacher Turnover Background Turnover is determined by state for both district and school level turnover Compare snapshot.
Superintendent Director Pupil Personnel Services Administrative Assistant Director of Curriculum, Instruction, & Assessment Director of Career & Technical.
 In dates, use a comma between the day of the month and the year. Ex: July 7, 2007  In a sentence, a comma follows the year. Ex: Emery was born on August.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Big Walnut Local School District Monthly Financial Summary May 2015.
Category Category Category Category Category
Plan Sales Vs. Actual Sales by Month Gross Margin by Category
IEEE Standards University Website Traffic Monthly Report
April May April May June July July June August Sept August
Making Tens.
Births as per Civil Registration System,
Making Tens.
Multiplying Up.
Divide 9 × by 3 ×
Presentation transcript:

From 31 July 2009 To 01 August 2010 RC-W CERP PROJECTs REPORTED IN CIDNE IN THE LAST 12 MONTHS UNCLASSIFIED

Herat Province – Projects Divided by Month From 31 July 2009 To 01 August 2010 UNCLASSIFIED Herat Province CERP Project Total number 181

Herat Province – Projects Divided by District From 31 July 2009 To 01 August 2010 Herat Province CERP Project Total number 181 UNCLASSIFIED

Herat Province – Projects Divided by AIMS Category From 31 July 2009 To 01 August 2010 Herat Province CERP Project Total number 181 UNCLASSIFIED

Baghdis Province – Projects Divided by Month From 31 July 2009 To 01 August 2010 UNCLASSIFIED Baghdis Province CERP Project Total number 39

Baghdis Province – Projects Divided by District From 31 July 2009 To 01 August 2010 Baghdis Province CERP Project Total number 39 UNCLASSIFIED

Baghdis Province – Projects Divided by AIMS Category From 31 July 2009 To 01 August 2010 UNCLASSIFIED Baghdis Province CERP Project Total number 39

Farah Province – Projects Divided by Month From 31 July 2009 To 01 August 2010 Farah Province CERP Project Total number 110 UNCLASSIFIED

Farah Province – Projects Divided by District From 31 July 2009 To 01 August 2010 Farah Province CERP Project Total number 110 UNCLASSIFIED

Farah Province – Projects Divided by AIMS Category From 31 July 2009 To 01 August 2010 Farah Province CERP Project Total number 110 UNCLASSIFIED