1 WORLD BANK PROCUREMENT PLANNING. 2 Identify procurement items in project scope (goods, works, service) Decide strategy Separate contracts for each component:

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

MONITORING OF SUBGRANTEES
1 The PEFA Program – and the PFM Performance Measurement Framework Washington DC, May 1, 2008 Bill Dorotinsky IMF.
______________________
1 Unit C3 Finance, legal Affairs and Partner support CALL FOR PROPOSALS APPLICATION PROCEDURE SPECIFIC ADMINISTRATIVE AND FINANCIAL ISSUES Version
Administering Lump Sum P/T Contracts via a Cost Loaded Schedule
Construction Contracting
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Project Procurement & Contract Administration Jiwei Ma
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Maintaining Configuration Control with the Engineer of Choice Saturday, April 25, 2015.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
Alternative Project Delivery
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Selection of Consultancy Services
Procurement of Consultancy Services. 2 Differences between.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
PROCEDURES FOR SELECTING THE CONTRACTOR
OHT 6.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Development plan and quality plan objectives The elements of the development.
Janaury The “World Bank Group”
Yaoundé, November Presented by: Mamata Teindrebeogo, Amadou Doudou Seck World Bank.
GLOBAL LESSONS: DESIGNING CDD OPERATIONS Samantha de Silva HDNSP April 2005.
Development plan and quality plan for your Project
Selection of Consultant Nazaneen I. Ali Sr. Procurement Specialist 1.
THE WORLD BANK Procurement Briefing the Netherlands November 3, 2003 Shaun Moss, Lead Procurement Specialist, Europe and Central Asia Region.
CONSULTANT GUIDELINES
Very Small-Value Procurement Under World Bank/IDA Small Grants, Loans and Credits Zagreb Regional Procurement Training Feb. 27 – March 3, 2006.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
PROCUREMENT PLAN States should prepare Procurement Plan for the entire outlay approved by the PAB for the State Component and all the Districts. The Procurement.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
1 CAPACITY BUILDING AND TRAINING ON PROCUREMENT Session 9 – The World Bank Procedures for IT Procurement September 21, 2005 by Arif Hassan.
1 Presented by: Mr. Chip Summers (703) Contracting: New Initiatives/Issues.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
Presentation on Financial and Procurement Procedure to be followed by the Institute Management Committees.
OPCPR- 03/26/20081 Procurement Under OP/BP 8.0 This presentation will cover…  Organizational and Institutional Support  Simplified Procurement Arrangements.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
TSUNAMI RELIEF PROGRAM KICK OFF MEETING. INTRODUCTION WHAT IS PROCUREMENT? WHY IS UNDERSTANDING PROCUREMENT SO IMPORTANTS? WHAT ARE THE BASIC PRINCIPLES.
United Nations Procurement Division
Achieving peak performance in contracting for services Presentation to the 10 th IPPU CPD Grand Imperial Hotel 31 st March, 2012 John F. A. Etidau.
CS 111 – Dec. 3 Lab recap Problem solving approach for systems analysts –8 phases –Just understand the flow/process/sequence of the steps, not specifically.
1 Administrative Procedures of a QIF Grant World Bank Project Coordination Unit (PCU)
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
IFMS Scope & Implementation Strategy Ethiopia By Tedla Mulugeta IFMS Project Manager Nov. 11,2004.
Procurement under CDD Projects By Sunil Bhattacharya.
State of Georgia Release Management Training
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
November 12, 2009 PM Process Improvement Plan: Employee Presentation.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Project Management – PTM712S
TECHNICAL ASSISTANCE FUND IIB– Slovak Republic
Procurement Management
PROCUREMENT FIDUCIARY ARRANGEMENTS IN SECTOR-WIDE APPROACHES (SWAps)
4.4 Procurement by grant beneficiaries
K.N. Venkata Raman Procurement Consultant, World Bank.
Enterprise Content Management Owners Representative Contract Approval
Procurement Manual – An Overview National Hydrology Project
SWAPs: Based on Lessons Mainly from Morocco and Zambia
Preparation of Procurement Plan (PP)
Planning is a critical success factor
IFMIS Acquisition Principles
BIDDING DOCUMENTS AND MAIN FEATURES
WORLD BANK PROCUREMENT PLANNING.
Procurement Planning Mani Ram Gelal
Enhancing Procurement Efficiency: Litigation Issues, Standard Bidding Documents and eGP Shakti Prasad Shrestha March 21, 2018.
WITHIN THE INTERNATIONAL RECONSTRUCTION FUND FACILITY FOR IRAQ
Second Avenue Subway Project Execution Strategy
Slovak Republic - International Investment Bank Technical Assistance Fund
Presentation transcript:

1 WORLD BANK PROCUREMENT PLANNING

2 Identify procurement items in project scope (goods, works, service) Decide strategy Separate contracts for each component: OR Single responsibility for groups of contracts: OR Turnkey for entire project Considerations Technical interface Sources of supply Coordination capability Time Package Similar items Transportation Goods vs works vs services

3 PROCUREMENT PLANNING Choice of Procedure ICB // LIB // Shopping // Single Source Scheduling Assess: Lead Time Administrative requirements and process Contract performance Review process Determine critical path Develop schedule for each contract Assess staff resources Monitor periodically Procure per applicable procedures Cofinancing aspects

4 PROCUREMENT PLAN Importance Serves as an execution and monitoring tool for procurement of goods, works and services Basis for procurement and modifications Basis for procurement reviews and audit Basis for a successful project implementation

5 PROCUREMENT ARRANGEMENTS [1] Name of package or contract [2] Indicate code: CW for civil works; S&I for supply and install; G for goods; TK for turn-key; SC for specialized services; CS for Consulting Services; TA for technical assistants; TR for training [3] Indicate number of slices, major items or sub-packages expected in the package [4] Expressed in US$000; for example 5,000 = US$5,000,000 [5] Indicate ICB, LIB, NCB, IS, NS, DC, Q (for minor civil works); FA for Force Account; QCBS for Quality and Cost Base Selection of consultant firms; QBS for Quality based Selection of consultant firms; FXB for Fixed Budget Selection of Consultant Firms; LCS for Least Cost Selection of Consultant Firms; CM for commercial practices for selection of consultants by private sector beneficiaries; SS for Sole-Sourcing of firms or individuals; Other for recurrent costs on the basis of administrative procedures based on acceptable schedule and budget [6] If needed [7] To match Procurement Table PROCUREMENT PLAN Estimated Dates Con- tract Signing Con- tract Signing Bid/RFP 1.Invitation 2.Opening 3.Eval. & Recom. 4.Contract Award (BD/RFP) 1.Invitation Pre-qual 6 /EOI 1.Invitation 2.Opening 3.Eval. & Recom. Procure- ment Method 5 Estimated cost 4 Number Of slices/ Items/ Sub- packages 3 Type 2 Descrip- tion 1 Indicate total 7