Saad Haj Bakry, PhD, CEng, FIEE 1 Economic Evaluations Saad Haj Bakry, PhD, CEng, FIEE P RESENTATIONS IN N ETWORK M ANAGEMENT.

Slides:



Advertisements
Similar presentations
Managing Hardware and Software Assets
Advertisements

Financial Planning 1 Introduction and Budgeting. Learning Objectives Understand the importance of linking planning and budgeting Understand the importance.
Chapter 13 Preparing The Systems Proposal Systems Analysis and Design Kendall and Kendall Fifth Edition.
Saad Haj Bakry, PhD, CEng, FIEE 1 TMN: Telecommunications Management Networks Saad Haj Bakry, PhD, CEng, FIEE P RESENTATIONS IN N ETWORK M ANAGEMENT.
Preparing the System Proposal Chapter 13 Topics: –Systems proposal –Determining hardware needs –Determining software needs –Decision to rent, lease, or.
Chapter 3 Program Management and Project Evaluation Professor Hossein Saiedian McGraw-Hill Education ISBN
Saad Haj Bakry, PhD, CEng, FIEE 1 Service Level Agreements: SLAs Saad Haj Bakry, PhD, CEng, FIEE P RESENTATIONS IN N ETWORK M ANAGEMENT.
Network Management Functions
SYS364 Feasibility and Cost Analysis. Today’s Agenda  Feasibility and Cost Analysis Tools  Understanding Costs and Benefits  Payback Analysis  Return.
ISO Information Security Management
Network Security Policy
Reporting and Interpreting Property, Plant and Equipment; Natural Resources; and Intangibles Chapter 8 McGraw-Hill/Irwin © 2009 The McGraw-Hill Companies,
Location Strategy and Layout Strategy
INDUSTRIAL & SYSTEMS ENGINEERING
ISMT221 Information Systems Analysis and Design
Saad Haj Bakry, PhD, CEng, FIEE 1 The Problem of Choice Saad Haj Bakry, PhD, CEng, FIEE P RESENTATIONS IN N ETWORK M ANAGEMENT.
Saad Haj Bakry, PhD, CEng, FIEE 1 Security Challenges and Protection Measures Saad Haj Bakry, PhD, CEng, FIEE P RESENTATIONS IN N ETWORK S ECURITY.
Chapter 10 Managing the Delivery of Information Services.
PROJECT EVALUATION. Introduction Evaluation  comparing a proposed project with alternatives and deciding whether to proceed with it Normally carried.
Saad Haj Bakry, PhD, CEng, FIEE 1 Introduction to Network Management Saad Haj Bakry, PhD, CEng, FIEE P RESENTATIONS IN N ETWORK M ANAGEMENT.
3.1 Sources of Finance Chapter 18 Part 1.
Economic Aspects of Information Systems Updated 2015 MIS 2000 Information Systems for Management Instructor: Bob Travica.
Chapter 13 Organizing Information System Resources MIS Department Centralization and Decentralization Outsourcing Computer Facilities and Services.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Organizing Information Technology Resources
FINANCIAL STATEMENTS. Why Use Financial Statements? Investors and bankers Investors and bankers Suppliers and creditors Suppliers and creditors You and.
MANIT WEB HOSTING SERVICES Presented by - Sandeep Jain & Devesh Lal CRISP, Bhopal.
Reporting and Interpreting Property, Plant and Equipment; Natural Resources; and Intangibles Chapter 8 McGraw-Hill/Irwin © 2009 The McGraw-Hill Companies,
4.1 Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 4 Chapter IT Infrastructure: Hardware and Software.
Section 9 External and internal resources AQA ICT A2 Level © Nelson Thornes Section 9: External and internal resources Management of Internal Resources.
Budget Cost Justification. What is a Budget Assigning specific amounts of money to specific areas in a fiscal year.
Reporting and Interpreting Property, Plant and Equipment; Natural Resources; and Intangibles Chapter 8 McGraw-Hill/Irwin © 2009 The McGraw-Hill Companies,
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Operations Management: Financial Dimensions
ADB Grant 0133-CAM: Public Financial Management in Rural Development Ministries (Component 1) Analysing Budgets March ,
Version 4.0. Objectives Describe how networks impact our daily lives. Describe the role of data networking in the human network. Identify the key components.
Chapter 9: Reporting and Interpreting Long-Lived Tangible and Intangible Assets Learning Objective 1 Define, classify, and explain the nature of long-lived.
Strategic Management of IS/IT: Organization and Resources
Financial Project Metrics in Feasibility Study
T RADITIONAL ITU V IEWS S AAD H AJ B AKRY, PhD, CEng, FIEE N ETWORK P LANNING: Looking before Leaping.
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
1. Tracking and oversight 2. Costing and Charging Assessment & Improvement of IT Services / IT Service Management Nynke de Vries.
An ERP Investment Decision
Why is Outsourcing a Problem? Customer view –length of contract –benefit tends to diminish over time –IT may be outsourced as a commodity, but later may.
PRJ566: Project Planning and Management Cost Benefit Analysis.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Chapter 3 Financial Management Part 2 BCN 4772 Summer 2007.
Incorporating Quality of Service into Incentive-based Regulation Juan Rivier Florence School of Regulation Workshop Improving.
Lecture 4. IS Planning & Acquisition To be covered: To be covered: – IS planning and its importance Cost-benefit analysis Cost-benefit analysis Funding.
Chapter 13 Preparing The Systems Proposal Systems Analysis and Design Kendall and Kendall Fifth Edition.
N ETWORK T ECHNOLOGY R EPLACEMENT: P ERFORMANCE B ASED A NALYSIS Saad Haj Bakry, PhD, CEng, FIEE.
Saad Haj Bakry, PhD, CEng, FIEE 1 Network Management Support Saad Haj Bakry, PhD, CEng, FIEE P RESENTATIONS IN N ETWORK M ANAGEMENT.
1 Business Aspects of Software Engineering SWE 513.
P RINCIPLES OF R ISK A NALYSIS S AAD H AJ B AKRY, PhD, CEng, FIEE.
Software Engineering Lecture # 1.
© EIPA – Robin Smail / Ex-ante Project Appraisal & project selection 1 Robin Smail Senior Lecturer CoR / DG Regio Open Days 28 September 2004 Steps for.
Copyright ©2009 Pearson Education, Inc. Publishing as Prentice Hall 22-1 Operations Management 10.
Chapter 13 Preparing The Systems Proposal Systems Analysis and Design Kendall and Kendall Fifth Edition.
Professor Saad Haj Bakry, PhD, CEng, FIEE I T COMPONENTS MANAGEMENT.
IS Development Methodology
Materials & Logistics Management
The Times 100 Business Case Studies
Managing the Delivery of Information Services
Network Management Functions
Cost Concepts and Design Economics
BUSINESS INCOME COVERAGE EXPENSE CHART
Capital Improvement Plans
Chapter 13 Preparing The Systems Proposal
Presentation transcript:

Saad Haj Bakry, PhD, CEng, FIEE 1 Economic Evaluations Saad Haj Bakry, PhD, CEng, FIEE P RESENTATIONS IN N ETWORK M ANAGEMENT

Saad Haj Bakry, PhD, CEng, FIEE 2 Objectives / Contents Cost / Expenditures Benefits / Revenues Background in Economics Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 3 Background in Economics Evaluation Methods Change of Value Cost & Benefits Basic Principles Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 4 Basic Principles Symbol FactorCriteria CCost / Expenditures “Cost Reduction” (maintaining requirements / management) BBenefits / Revenues “Maximizing Benefits” (efficient use / charging policy) ECost-Effectiveness: E = B / C ttime Investigation time scale. Break-Even time: E = 1. Optimum Life: Maximum E Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 5 Types of Cost / Benefits IssueTypeExplanation Estimation Problem Tangible Can be quantified directly and assigned a monetary value: e.g. cost of equipment. In- Tangible Difficult to quantify and given monetary value: e.g. staff frustration Operation / Time Recurring Continue to occur through the life of the project: e.g. maintenance cost Non- Recurring Usually occur at the beginning of the project life and do not occur again: e.g. initial investment. Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 6 Change of Value (with Time) FactorExplanation Reference Time / Year t = 0 Reference time (year) for the evaluation of real worth values Proportional Change of Value (positive or negative) Effect of “inflation” Effect of “borrowing” Combined Effects: “discount rate” Change: v(t) Real Worthv(t) = vRV(t) = V(t) / (1+v) t Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 7 Evaluations: Cash Flow Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 8 Evaluations: Investment State Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 9 Evaluations: Efficiency Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 10 Cost / Expenditures Cost Management / Policy Place Network Operation Network Structure Staff Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 11 Network Structure Access / Services Sub network: Access Points Servers Communications Communications Sub network: Switches Channels Installation / Testing Consulting: Planning (Legal, Technical,..) / Design Capacity / BW = Cost Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 12 Place / Staff Training Land Building Offices / Furniture Lighting Air-Conditioning Water Cooling Salaries Other Staff Benefits Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 13 Network Operation Monitoring & Control Preventive Maintenance Help-Desk: Fault Repair Cost of Other Management Functions … Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 14 Cost Management / Policy Contracts / SLAs: Service Level Agreements Distribution of Cost / Criteria Cost Reduction / Resource Sharing Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 15 Service Level Agreements: SLAs Users: Associated with Different Internal Department Internal SLAs Internal IT Department: Computer Services / Intranet External SLAs Resources Suppliers Services Providers Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 16 Cost Distribution: Organization Intranet Centralized Cost is paid by “top management” Top level “overheads” Distributed Cost is distributed among the departments of the organization “Distribution Criteria is needed. Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 17 Cost Distribution: Criteria CriteriaDescription SharesCost is distributed according to specified weights of shares SizeCost is distributed according to size: “employees” / “space”.. ProfitCost is distributed according to “profit” or “loss” UseCost is distributed according to traffic “generation” / “flow” Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 18 Cost Reduction Equipment: Buy / Lease / Rent Operation / Maintenance / Staff: Considering SLAs (Specialized Companies) Sharing Resources Balancing Demands and Resources Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 19 Sharing Resources Examples: Long Distance Channels Management Software Information Services Staff Advantages: Cost Sharing Less Cost per Department Capacity Utilization Cost Effectiveness Problems: Increased Management Complexity / Control & Security / Performance Level Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 20 Benefits / Revenues Management Of Revenues Dimensions of Benefits Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 21 Dimensions of Benefits Time Saving Time Increasing Productivity Geography Saving Movement Saving Space Form: Enhancing Quality / Supporting Management Efficiency / Better Security P ROPER U TILIZATION Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 22 Management of Revenues Tariff Policy Services Competitiveness Busy Period Issues Management Cost v. Revenues Public Services of Non-Urban Areas Future Development: Cost of Expansion / Upgrading / Replacement Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 23 Conclusions Cost / Expenditures Evaluations: Use of Economic Principles Benefits / Revenues Interaction Time / Progress Efficient Management Economic Evaluations

Saad Haj Bakry, PhD, CEng, FIEE 24 References General Network Planning, ITU-T Telecommunications Management: Operation & Management of Networks, National Computing Centre (NCC) Training, UK. R. Jamal-Aldeen, S.H. Bakry, A. Nouh, “Analysis of the cost-effectiveness of information networks with applications”, International Journal of Network Management, Vol. 100, No. 2, pp , March / April Economic Evaluations