Future NERC Congestion Management Tool Option 3A (Proposed by NERC/NAESB TLR TF) 5/11/2005.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

2 Draft of proposed metrics for the WEQ BPS to conduct analysis and evaluation of the Parallel Flow Visualization pilot project. (PFV Pilot)
1. ***Confidential*** Concerns Tag Non Firm Option October 10, 2010 Bert Bressers 2.
Flowgate Allocation Method Examples of Proportional Curtailment of FIRM PTP and GTL Houston, December 1-2, 2010.
1 Market Flow Threshold Field Test NERC ORS Meeting November 14 th and 15 th.
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Parallel Flow Visualization and Flowgate Allocations Equity Concerns of Non-Market Transmission Owners Equity Concerns of Non-Market Transmission Owners.
Commercial Implications of ERR Calculations Option 3 method vs. Transaction method.
Parallel Flow Visualization/Mitigation Proposal
Business Practices Subcommittee Update August 17, 2010.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
©2005 PJM 1 Redispatch Credit NERC/NAESB TLR Task Force Feb 2-3, 2005 Houston, Texas Operations Reliability Subcommittee Feb 8-9, 2005 Scottsdale, AZ.
E-Tag 1.8 An industry tutorial.
NAESB Coordinate Interchange
1 Credit for Redispatch Small Group Review of Unconstrained MFs NAESB BPS Meeting December 14-15, 2011.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair September 13 th, 2012.
White Paper on the Future of Congestion Management IDC Granularity Task Force Standing Committee Meetings July 20-22, 2004.
Business Practices Subcommittee Update February 2, 2010.
Business Practices Subcommittee Update April 30, 2012.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Operating Reserves --- Again A Discussion Primer
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Craig L. Williams UFAS Liaison Market Interface Manager ECC Cost Benefit Analysis Review July 17-19, 2013 Standing Committees Joint Session.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
FERC Order minute Scheduling.
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
FEBRUARY 27, 2013 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS Parallel Flow Visualization Overview 1.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
Pseudo-Tie Reservations
Theoretical Structure of Financial Accounting
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Business Practices Subcommittee
2013 Calendar Year Customer Survey Results
CMSC Rules Changes under Consideration Market Operations Standing Committee December 3, 2003 PUBLIC.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Reload PFV September 12, Reload PFV  Concern that need to be addressed:  The RC need to have an option in PFV to allow gradual reload of markets.
Flowgate Allocation Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Parallel Flow Visualization Project NERC ORS Meeting May 4, 2011.
Comments on CERC’s Staff Paper: Developing a Common Platform for Electricity Trading S. A. Khaparde, A. R. Abhyankar and V. Sarkar Indian Institute of.
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M16 - Version 8.01 SMU CSE 7315 Planning and Managing a Software Project.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
Generator Prioritization Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
Highlights of Midwest ISO: 2004 State of the Market Report and Day-2 Energy Markets Prepared by: David B. Patton, Ph.D. Independent Market Monitor Midwest.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
NAESB BPS UPDATE TO EXECUTIVE COMMITTEE AUGUST 21, 2012 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS PARALLEL FLOW VISUALIZATION PROJECT 1.
EIM AWG July 5, Guiding Principles The intent of the group is to work collaboratively to better understand the WECC EIM costs and benefits analyses.
1 Parallel Flow Visualization Goals NAESB BPS Meeting September 15-16, 2010.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Interchange Distribution Calculator Working Group (IDCWG) Update
Further Information on MISO FTR Auctions
Pseudo-tie business procedure
Future NERC Congestion Management Tool Option 3A (Proposed by NERC/NAESB TLR TF) 5/11/2005.
Request for Information IDC Granularity Option 3/3A
UFMP methodology changes in the updated webSAS
Two-Tier Firm Curtailment Overview
NERC Congestion Management
Pseudo-tie business procedure
Presentation transcript:

Future NERC Congestion Management Tool Option 3A (Proposed by NERC/NAESB TLR TF) 5/11/2005

Creation of Option 3A NERC directive to investigate a business case for the future of the congestion management tools calls for using Option 3 as a starting point. Option 3 use of ERR would not provide proper market signals for congestion relief and that the model would not be politically marketable as a future IDC enhancement. As part of the investigation into the business case for Option3, the NERC/NAESB TLR Task Force suggests pursuing a variation of Option 3 that will be referenced here as Option 3A.

Significant Differences of Option 3A (to Option 3) ERR calculation that uses net transactions evaluated against weighted external systems is replaced with a process that evaluates contributions by individual tags. Counter Flow tags are also incorporated. In this Option 3A, the tag related Transactional Relief Responsibility will be referred to as TRR. TRR costs are assigned to Transmission Providers (TPs) instead of by Balancing Authority. The host/local/system wide split of redispatch costs does not apply to Option 3A, and the Option 3A redispatch cost are not a function of IROL/SOL declarations. Other associated features of Option 3 that are not discussed in Option 3A will be similar.

Option 3A Recognizes that one of the directives of the NERC ORS in writing the IDCGTF white Paper is the need to include counter- flows in the CM Tool. Proceed with incorporation of counter flows (while continuing to discuss and explore the implications) Option 3A assigning credit to counter-flow tags TRR (and IRR) include flows down to 0% shift factor. Implementation should make every effort to retain superposition of flow principles. TRR redispatch costs would be assigned to each Transmission Provider (TP) with a breakdown of responsibility for each tag. TPs distribute TRR costs, Bas distribute IRR costs. TRR fills need in Option 3 for assigning ERR costs by tag

Feedback Signals to Market Based on actual or potential redispatch, the congestion management tool would provide good- faith estimates of per MW cost of redispatch for each time interval. The per-MW costs would also vary during the relevant time interval to account the RC redispatch adjustments and corresponding TRR/IRR. These good-faith cost estimates will be posted in real-time (for those registered).

Voluntary Curtailments Option 3A does not prescribe tag curtailments. CM Tool posts good –faith estimates of redispatch costs posted by the congestion management tool, each PSE has the right to voluntarily curtail or adjust their tags to reduces their exposure to redispatch costs. Further discussion is needed on the regulatory and tariff issues relating to participation in the assignment of redispatch costs.)

Voluntary Curtailments (cont.) each PSE is bound to the redispatch costs for the Financial Redispatch Cost Interval. Posted pricing signals may cause PSE voluntary curtailment actions that should serve as potential beneficial feedback for next time interval. Time interval is of sufficient size so that RC actions and PSE actions can be properly coordinated. As tags are adjusted voluntarily, the RC can make proper next-interval adjustments to its redispatch. immediate tag adjustments could work against the redispatch being performed by the RC (such as when multiple TLRs are in effect)

Achieving Redispatch Relief The following issues need to be resolved. Should redispatch between CAs be represented in ACE adjustments or some automatic transmission reservation and tag creation? Should the redispatch be subject to needing transmission service? Impact of tags that are implemented for congestion management tool redispatch should be excluded from assignment of redispatch costs. This would also apply for interaction between TLR events. The CM Tool would identify situations where redispatch for one TLR event counteracts redispatch being provided for another TLR event.

Option 3A Tags continue to implement existing IDC TLR level prioritization using either a Weakest Link (WL) or Constrained Path Method (CPM) categorization. When multiple TPs (and/or multiple reservations) are involved in a tag, the TRR will be split on an equal percentage basis up to the TLR level in effect.

Option 3A Impact of individual tags will be a function of their identified sources and sinks. If tags lead to over-contribution at a specific location, the shift factors used for the tag may be adjusted in an attempt to create an equivalent impact and retain as many aspects of power flow superposition as possible. Changes may be made to the NERC procedures to require registration of tag source/sinks and their maximum MW contributions. Adjustments to the available generation for IRR such that the principle of flowgate flow superposition applies. (excluding from IRR generation dedicated to a tag)

Counter-Flow Credit Example The NERC/NAESB TLR TF needs to discuss the implications of including various types of counter flow credits. An example outlining two methods is provided for the 5/9 meeting. Incorporate appropriate verbiage and example based on outcome of discussions. Material highlighted in RED may need to be re-worked.

Counter-Flow Credit Example (cont.) TLR Situation : The total tag (and actual) flowgate impacts exceed the 500 MW OSL rating by 50 MW. Therefore 50 MW of relief is requested. Two Choices: Crediting Counter-Flows up to Active Priority Level Crediting All Counter-Flows Assumptions : Superposition applies and TRR contributions (Ignoring IRR contributions) equal the actual Flowgate impacts. (Therefore: positive impacts exceed negative impacts)

Counter-Flow Credit Example (cont.)

Counter-Flow Credit Example

Counter-Flow Credit Example (cont.) 1) Crediting Counter-Flows up to Active Priority Level : The active level would be priority 2 (intersection of yellow and blue lines) The redispatch revenues collected would be $2500, and the credits issued would be $1500. The redispatch would cost $1000, with a per MW cost of Flowgate Relief of $20. 2) Crediting All Counter-Flows : The active level would be priority 2 (intersection of cyan and blue lines) The redispatch revenues collected would be $6000, and the credits issued would be $5000. The redispatch would cost $1000, with a per MW cost of Flowgate Relief of $20. (SAME) All counter flows treated equally, but a higher effective TLR priority level is required to pay for the redispatch. Note: Both methods are capable of achieving the full relief (up to 550 MW).

Use of ACE Implementation stage of Option 3A - include assignment of Flowgate redispatch costs to ACE deviations. Incorporation of ACE flowgate impacts may involve utilization of a smaller cost allocation period, integrated hourly ACE, and or next period costs based on the cost of flow uncertainty induced by ACE impacts. Would use a calculation similar to ERR (since flow destination is uncertain) post-redispatch adjustments to account for after the fact tag submittal for reserve sharing.

Application to EEA Declarations tags specific to EEAs are treated the same as all other tags. (subject to TRR) However, must tag internal transactions related to EEAs (to break out the costs from IRR)

Metric Creation Metrics should be used to make future enhancements and improvements to the congestion management tool calculations Intended for compliance?

Metric Creation Can metrics be developed that will measure the RC TLR performance? Can the tool measure how well the actual flow tracked with the applied operating limit? For example, if the RC calls for too much redispatch, they may overshoot in obtaining relief. Adjusting the redispatch on a more frequent basis may allow the RC to regulate the flow within a tighter band below the operating limits. Can a comparison between time intervals be created to make an estimate (metric) of the amount of voluntary tag curtailment?

Time Intervals Time intervals can apply to Option 3A. (as well as for Option3) ICCP data update interval (2 sec?) ICCP data incorporation interval Tag data update interval (as determined by other systems) Interval for Utilization of updated Tag Data (20 minutes) IRR calculation update interval (5 min? can triggered by RC) TRR calculation update interval (5 min? can triggered by RC) Interval for incorporating updated SDX (20 minutes, or triggered by RC ) Redispatch Relief Adjustment Interval (1 minute? – as needed by RC) Interval for estimating good-faith per MW cost (5 minutes) Interval for financial redispatch cost allocation ( ) Others?

Pros (3A vs. 3) The paradigm shift is simplified for Option 3A making it more consistent with the existing IDC processing of tags. This may make Option3A a less expensive Option to implement. Provides details of relief responsibility for tags not found in the ERR of Option 3.

Pros (3A vs. 3) TRR evaluates tags based on their own characteristics and does not require knowing the big picture of all tags used with the ERR calculation in Option 3. A single tag (in Option 3) has the potential to greatly change the net importing/exporting status of a BA and can lead to non- intuitive changes in ERR. - does not send a proper market signal. Option 3A does not have this problem. Can be important for situation like reserve sharing where tags can be submitted after the fact. Delayed tags in Option 3 have the potential to create significant ERR changes Proper market TTR/IRR signals will may lead to voluntary tag curtailment which over time may reduce the duration and amount of redispatch provided directly by the CM Tool.

Cons (3A vs. 3) Some concern about the inclusion of counter-flows. In Option 3A all tag counter-flows can receive credits. In Option 3, counter-flows are treated as offsetting positive flow impacts. However, if ERR is determined to be negative, no credit is given.

END