11 OASIS Subcommittee - Notification Task Force UPDATE May 29 2013.

Slides:



Advertisements
Similar presentations
DRAFT Recommendation Preemption & Competition CHALLENGER COUNTEROFFER June 25, 2013 NAESB OS.
Advertisements

WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems In Order 890, FERC directed transmission providers, working through.
WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems In Order 890, FERC directed transmission providers, working through.
OASIS Subcommittee Status Preemption and Competition EC Meeting 4/30/13.
Business Practices Subcommittee Update August 17, 2010.
Lottery Method in BPA’s Simultaneous Submission Windows and Potential Application to the Simultaneous Defender Matching Process NAESB Meeting 05/01/13.
Preemption and Competition Redirect Issues NAESB OS Meeting June 6, 2012 BPA Presenting.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
NAESB Coordinate Interchange
Business Practices Subcommittee Update October 26, 2010.
Business Practices Subcommittee Update February 2, 2010.
Business Practices Subcommittee Update February 1, 2011.
Timing and Flowchart Assignment
W. Weathers1A Conference Call 8/18/05 Examples: In all cases a Parent Reservation to be Redirected must be Firm Point-to-Point. Unless noted otherwise,
Business Practices Subcommittee Update April 30, 2012.
Standards Review Subcommittee Update October 22, 2013.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Timing Considerations for Short-term Preemption and Competition Automation NAESB OS Presentation.
NAESB Coordinate Interchange Standard, Version 1 / 0
North American Energy Standards Board Upadate Presented by Bob Harshbarger.
Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake.
MIC/ISAS LIAISON REPORT June 15, 2007 April, 2007 ISAS Meeting Highlights.
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
FERC Order minute Scheduling.
Resales and the Northwest Market A High Level Preview presented by Pacific Northwest Customers*
Tiers 1 & 3 Assignment Flat Profile Recommendation.
DRAFT E-Tag Notification Presentation NAESB OS Mar 26-28, 2013 Seattle, WA.
EC Meeting 2/24/ AP Item 7(b) Modify NAESB standards WEQ , WEQ , and related standards to be consistent with the Commission’s policy.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, January 19, :00 to 4:00 p.m. EST 4 th Quarter
DRAFT Request for Initiation of a NAESB Standard NAESB OS Oct 23-24, 2013 Richmond, VA.
NAESB WEQ UPDATE Interchange Scheduling and Accounting Subcommittee Meeting Salt Lake, UT August 26, 2015 Bob Harshbarger Puget Sound Energy.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Resales, Aggregations & Redirects of Resales NAESB OS July 22-24, 2014 BPA Presenting.
1 Free Template from  NAESB  Coordinate Interchange Scheduling Subcommittee  OASIS Subcommittee  Business Practice Subcommittee.
Resale Business Practice Standards 3 Options remain.
Short-term Competition and Preemption (STCP) May 2015 Presenter: Marie Pompel Bonneville Power Administration.
Standards Review Subcommittee Update November 2007 – January 2008 February 5, 2008.
Electronic Scheduling /Information Technology Subcommittees (ESS/ITS) Update 2008 Review November 4, 2008.
E-Tag Notification Assignment NAESB OS Sep 17-19, 2013 Seattle, WA Assignee – Robin Cross Seattle City Light Interested Resources: Marie Pompel - BPA Power.
Resale Business Practice Standards 3 Options remain.
NITS Concepts  Contract Data Model: NITS Agreement represented as a Contract Contract has one or more Facilities Facility may be one or more Resources.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Standards Review Subcommittee Update August 17, 2010.
Consolidation (API 5.d R09015) Business Practice Standards Draft WEQ OS Marie Pompel – July 2015.
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
NAESB Update Kathy Anderson October 2015 MIC Meeting.
02/19/14 REVIEW AND UPDATE FLOWCHART AND TIMING. Goals Finish going through the process flowchart listing the steps and various options for each. Develop.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
UNCONDITIONAL AND LEAD TIMES PREEMPTION AND COMPETITION TIMING.
NT Assignment Update: 9/17/13. NT Assignment Update Resources: CompanyResources BPARebecca Berdahl, Milos Bosanac, Ann Shintani, Bob Zerfing ClarkBrenna.
Preemption-ROFR Notification
NT Assignment Update: 9/17/13.
WEQ OASIS Subcommittee
BPA Formal Comments Overview to NAESB OS
BPA Formal Comments Recap of ‘Best Offer’ Proposal
Duke Energy Carolinas Quarterly Stakeholder Meeting
NAESB WEQ OASIS Subcommittee Report NAESB WEQ Executive Committee
Recommended Appendix B Redirect Standards Examples
Service Across Multiple Transmission Systems
Duke Energy Carolinas Quarterly Stakeholder Meeting
Service Across Multiple Transmission Systems
BPA Formal Comments Recap of ‘Best Offer’ Proposal
Short-term Competition and Preemption (STCP)
ESC Use Case Review Joint OASIS Implementation Task Force Paul R
2019 Annual Plan Items 3b and 3f (formerly 2018 API 3c and 3h)
Assigned to the WEQ OASIS and WEQ OASIS/BPS Subcommittees
Interchange Authority Function Task Force
Kathy Anderson October 2015 MIC Meeting
OASIS Subcommittee Status Preemption and Competition
NAESB WEQ OASIS Subcommittee Report NAESB WEQ Executive Committee
OASIS Notification Recommendation.
Presentation transcript:

11 OASIS Subcommittee - Notification Task Force UPDATE May

2 Scope and Goal Scope: NAESB has minimum standards to notify impacted parties of reductions or other changes as a result of Short-Term Competition and Preemption in WEQ-001 (OASIS) and WEQ-004 (Coordinate Interchange). Identify notification proposals for OASIS subcommittee (OS) discussion/motions. Goal: Provide the OS with notification options for their consideration. Include (1) existing NAESB and other standards, (2) pro/cons of existing and proposed features, and (3) proposed recommendation. 2

33 Proposed Timeline – June 2013 Categories under review for short- term competition E-Tag notifications (firm transmission) OASIS notifications (firm transmission) Review Existing standards/specifications Options – pros/cons Recommendations Others?

4 Status Current review Considered STF preemption scenarios (requests and reservations) Developed draft e-Tag notification options (and pros/cons) Reviewed current OASIS notification standards Still to do Develop draft OASIS notification options (and pros/cons) Review current e-Tag notification standards Consider STF competition scenarios Other?

5 E-Tag Notifications 1. Preemption (reductions) of a confirmed Reservation referenced on confirmed e- Tag(s) 2. Competition that results in a reduction of a confirmed Reservation that is referenced on confirmed e-Tag(s) Did not look at e-Tag notification for Transmission Service Request that have been Superseded, as such transmission would not be part of confirmed e-Tag

6 E-Tags that have lost transmission capacity due to preemption or competition This is a concern when confirmed reservations Conditional Window overlap into the Scheduling Window (primarily for Daily and Hourly products) No procedure to appropriately allocate these type of reductions of transmission to confirmed e-Tags When a reduced transmission reservation is referenced on multiple confirmed e-Tags, there could be many options on how that reduction is allocated to e-Tags Currently, the authorized parties that may reduce the transmission profile of a confirmed e-Tag does not include the TCH. A tag author is the only party allowed to make a market adjustment to the Transmission Profile on a e-tag

77 Related E-Tag Standards WEQ-004, Coordinate Interchange Addresses interchange deliveries Appendix A (Transaction e-Tag Actions) describes a reduction of transmission profile as a possible e- Tag action of certain approval entities, requiring TP approval. NERC reliability standards To be determined

88 E-Tags that have lost transmission capacity due to preemption or competition – Options being considered Maintain Status Quo: Currently there is no requirement for a Transmission Provider or Transmission Customer to notify PSE/Tag Author via the e-tag process when the supporting Reservation has lost capacity 1. Auto-notification to all potentially impacted e-Tag parties of a potential issue. 1. The TP send a Pre-Notification to PSE /Tag author when the TCH has lost Capacity used to support the e-tag (Heads up notification) 2. Auto-notification to smaller group of potentially impacted e-Tag parties of more certain issue 1. Allow the TCH to notify the Tag Author/PSE that they have lost their Capacity on XXXXX A-ref via the e-tag process. 3. Limit RFI (tagging) to the unconditional window a) Shorten Conditional window for reservations b) Do not allow RFI to be Accepted if the supporting Reservation is still deemed in its Unconditional window 4. Create ability for Transmission Contract Holder (TCH) to modify certain e-Tags: Allow TCH to submit a downward adjustment to the e- tag energy and transmission profile when TCH has lost Capacity on the Aref used to support the e-tag 5. Create pro-rata methodology for TP to implement allocated transmission and energy profile reductions on e-tags (if no action) Others?

99 OASIS notifications Preempted OASIS requests (TSR that are Superseded) Preempted OASIS reservations (NT has Pre-empted PTP) Competed OASIS reservations (on hold until competition procedure is finalized) The following are initial OASIS standard review for notification descriptions.

10 Preempted OASIS requests When PTP requests are not confirmed due to a subsequent, higher tiered request : once request is denied (and will be in its entirety), AREF of competing request and reason is to be described in the comment field : state change dynamically notified if customer requested such notification on OASIS Others?

11 Preempted OASIS reservations When confirmed, conditional PTP reservations are displaced or reduced by a higher tiered request Same as for Preempted Requests, except that partial reductions are allowed (Displacement-No ROFR): the status of Displaced indicates reservation is displaced in its entirety. Otherwise, a portion is reduced. Others?

12 Competed OASIS reservations When confirmed, conditional PTP reservations are not matched, or otherwise displaced/reduced by a higher tiered request : implies Counteroffer status made to notify customer the subsequent match offer (Displacement-With ROFR): the following are the actions that will initiate electronic notification, if customer has elected to receive such notification Competing_Request_Flag is set to Y Seller_Comments include the AREF of the competing request The status change associated with the Customers matching request, and the status change associated with that Competing_Request_Flag is set back to N once the result of the competition is resolved

13 Proposed for June 2013 OS Proposal to identify/resolve e-Tags orphaned Proposal for OASIS notifications Others?

14 Notification Task Force participants Providers Danielle Johnson (BPAT) Ron Robinson (TVA) OASIS system Paul Sorenson (OATi) Customers Joel Jencks, Marie Pompel, and Ann Shintani (BPAP) Rhyan Kyle (PSEM) Cory Anderson, Robin Cross (SCL) Kim Haugen (Snohomish) Rhea Payne, Rick Applegate (Tacoma) E-Tag system None