1 Market Flow Threshold Field Test NERC ORS Meeting November 14 th and 15 th.

Slides:



Advertisements
Similar presentations
Bill Blevins Management of the West-North Stability Limit Under the Nodal Market.
Advertisements

NAESB BPS Yasser Bahbaz– IDCWG Chair June 20 th, 2013.
2 Draft of proposed metrics for the WEQ BPS to conduct analysis and evaluation of the Parallel Flow Visualization pilot project. (PFV Pilot)
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Business Practices Subcommittee Update April 30, 2013.
Business Practices Subcommittee Update August 20, 2013.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair May 17 th, 2012.
Business Practices Subcommittee Update October 23, 2012 DRAFT.
Parallel Flow Visualization/Mitigation Proposal
Business Practices Subcommittee Update August 17, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair November 9 th, 2011.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
©2005 PJM 1 Redispatch Credit NERC/NAESB TLR Task Force Feb 2-3, 2005 Houston, Texas Operations Reliability Subcommittee Feb 8-9, 2005 Scottsdale, AZ.
NAESB Coordinate Interchange
1 Credit for Redispatch Small Group Review of Unconstrained MFs NAESB BPS Meeting December 14-15, 2011.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair September 13 th, 2012.
Business Practices Subcommittee Update October 26, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair April 4 th, 2012.
White Paper on the Future of Congestion Management IDC Granularity Task Force Standing Committee Meetings July 20-22, 2004.
Business Practices Subcommittee Update February 2, 2010.
Business Practices Subcommittee Update February 1, 2011.
Business Practices Subcommittee Update April 30, 2012.
National Thousands Block Number Pooling Services NANC Meeting January 13, 2004.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
Addition Facts
FERC Order minute Scheduling.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
JJ Jamieson MIC Chair WECC Board Report March 2014 Webinar.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
Addition 1’s to 20.
Januar MDMDFSSMDMDFSSS
Weekly Attendance by Class w/e 6 th September 2013.
FEBRUARY 27, 2013 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS Parallel Flow Visualization Overview 1.
SPP.org 1. 2 Aggregate Transmission Service Study (ATSS)
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Business Practices Subcommittee Update May 4, 2010.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Flowgate Allocation Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Parallel Flow Visualization Project NERC ORS Meeting May 4, 2011.
Market Operations Standing Committee of the IMO Market Operations Standing Committee September 22, 2003.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
Standards Review Subcommittee Update August 17, 2010.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
Generator Prioritization Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Business Practices Subcommittee Update Executive Committee Meeting April 29, 2014.
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
Business Practices Subcommittee Update October 27, 2009.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
Business Practices Subcommittee Update August 16, 2011.
NAESB BPS UPDATE TO EXECUTIVE COMMITTEE AUGUST 21, 2012 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS PARALLEL FLOW VISUALIZATION PROJECT 1.
1 Parallel Flow Visualization Goals NAESB BPS Meeting September 15-16, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update
Market Flow Threshold Field Test
Business Practices Subcommittee Update
Business Practices Subcommittee Update
Market Flow Threshold Field Test
NERC Congestion Management
Presentation transcript:

1 Market Flow Threshold Field Test NERC ORS Meeting November 14 th and 15 th

2 Introduction Market flows are assigned an amount of relief by the IDC based on level of TLR, amount of curtailment requested and the priority/sub-priority of tags relative to the market flows. On some flowgates, MISO and PJM are unable to consistently accomplish their relief where they have very small impacts. On some flowgates, the markets will either have no generation they can move or will require a large amount of redispatch for a small amount of relief. Reason For Change In Threshold

3 Market Flow Threshold Field Test The FERC, NERC ORS and NERC Standards Committee approved a field test to calculate relief requests based on a down to three percent market flow. This is for all entities that report market flows. Conditions placed on field test: 12 month test to be completed by 12/31/08 Can start before 6/1/07 or after 9/1/07 Must start no later than 12/31/07 At least one market must be ready to start NERC TLR SDT will monitor progress and make periodic reports to the NERC SC

4 Implementation On May 29 th, the field test began. In addition to reporting market flows down to zero percent, PJM started reporting market flows to the IDC down to three percent. On May 29 th, the IDC began calculating PJM relief based on the down to three percent market flows. SPP implemented on October 1 st and MISO implemented on November 1 st. A summary of results was provided to the NERC ORS on September This is a follow-up summary with an additional two months of data.

5 Failure to Meet Relief Obligation What does it mean to have a failure? MISO, PJM and/or SPP did not meet its relief obligation. Not all failures involve the use of three percent threshold (PJM participation started May 29, SPP participation started October 1, MISO participation started November 1). If one or more five minute window failed to meet the relief obligation, this was counted as a violation event. In reality, you cannot expect an instantaneous change in market flows to meet relief obligations.

6 Summary Results IDC threshold reports analyzed for July, August, September and October. The table below shows the number of TLRs where an entity was unable to provide the IDC requested market flow relief. MISOPJMSPP Total TLR 3+ Reports July53022 August September October312731

7 Result Observations/Issues 1.Because there was a delay in setting the market flow threshold by flowgate in the IDC, the use of 3% market flows for TLR curtailments was delayed (PJM-June 12, SPP-October 3, MISO- November 1). 2.The NERC/NAESB TLR SDT asked that the field test extend for a minimum of 12 months for each market participant. Based on a MISO start date of 11/1/07, the field test will continue through 10/31/08 3.There were some reporting problems when the field test first started that prevented using the June reports and requiring manual processing of reports in the first 18 days in July. 4.Problems that continue to exist in the reports: 1.Gaps in the data where a TLR relief obligation existed but there is no market flow threshold report for this time interval.

8 Result Observations/Issues Continued 4.Problems that continue to exist in the reports (continued): 2.The market flow threshold report sometimes shows a market did not meets its relief obligation for a time interval when there was no TLR and/or no relief obligation. 3.The market flow threshold report sometimes shows a markets did not have a relief obligation for a time interval when it did. 5.There appears to be some problems with the TLR events themselves where the markets are assigned a relief obligation based on firm market flows during TLR 3. Also see cases where there are large market flow relief obligations (100 MW or greater). 6.These and other issues will be discussed as the NERC ORS TF does a detailed review of the market flow threshold reports.

9 Next Steps Continue to collect data. MISO, PJM and SPP are preparing reports that track not only the number of relief obligation failures but also the magnitude of the failures using plots from IDC (see slide 10). Schedule an ORS Task Force call to analyze the data. ORS TF participants: Daryn Barker (E.ON.)Richard McCall (NCEMC) Jim Burlew (PJM)Lanny Nickell (SPP) Jim Busbin (SoCo)Greg Stone (Duke) Frank Koza (PJM)Mark Wilson (IESO) Tom Mallinger (MISO)David Zwergel (MISO) NERC/NAESB TLR SDT will be invited to participate in the review. Are there other NERC ORS members interested in participating in the review?

10 Sample Data Being Collected - PJM MF During TLR