Status of RF synchronization and fast trigger distribution Reported by H. Damerau (CERN) Acknowledgements: J. Moody, P. Muggli (MPP), D. Barrientos, T.

Slides:



Advertisements
Similar presentations
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
LINAC 4 – LLRF ELECTRONICS UPDATE BCC-42 A.K. Bhattacharyya, A. Butterworth, F. Dubouchet, J. Molendijk, T. Mastoridis, J. Noirjean(reporter), D. Stellfeld,
Measurements with laser at MPP and updates on RF synchronization Reported by Heiko Damerau (CERN) Measurements jointly with J. Moody, P. Muggli (MPP),
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Linac 4 LL RF Hardware Architecture and Design Status
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Updates on RF synchronization and fast trigger distribution A. Butterworth, H. Damerau, W. Hofle Acknowledgements: T. Bohl, S. Doebert, I. Kozsar, J. Molendijk,
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
1 Timing and RF Distribution NLC -> ILC Josef Frisch.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
RF Systems Commissioning O. Brunner AB/RF on behalf of the RF group (LTC – March ’08) Many thanks to L. Arnaudon, Ph. Baudrenghien, W. Hofle, D. Valuch,
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
UED at ASTA: LLRF and triggers Need < 100 fs jitter Currently we measure > 500 fs RMS phase noise in 10 Hz to 10 MHz bandwidth at 476 MHz Excessive phase.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
The CERN LHC central timing A vertical slice Pablo Alvarez Jean-Claude Bau Stephane Deghaye Ioan Kozsar Julian Lewis Javier Serrano.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Anders Sunesson RF Group ESS Accelerator Division
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
The CERN LHC central timing A vertical slice Pablo Alvarez Jean-Claude Bau Stephane Deghaye Ioan Kozsar Julian Lewis Javier Serrano.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Timing for AP: introduction Javier Serrano AB-CO-HT 15 September 2006.
Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
1 The Link-On-Chip (LOC) Project at SMU 1.Overview. 2.Status 3.Current work on LOCs6. 4.Plan and summary Jingbo Ye Department of Physics SMU Dallas, Texas.
ESS Timing System Prototype 2012 Miha Reščič, ICS
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
AWAKE synchronization with SPS Andy Butterworth, Thomas Bohl (BE/RF) Thanks to: Urs Wehrle (BE/RF), Ioan Kozsar, Jean-Claude Bau (BE/CO)
RF Phase Reference Distribution for the European XFEL Krzysztof Czuba Warsaw University of Technology, ISE For the RF Synchronization Team P. Jatczak,
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Status of the RF System 09/03/2016 AWAKE RF Status2 D. Barrientos, T. Bohl, A. Butterworth, H. Damerau, W. Höfle, T. Levens, J. Molendijk, S. Rey, U.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
Recent LLRF Developments at CERN and New Projects Wolfgang Hofle on behalf of BE-RF-FB and BE-RF-CS Section LLRF'15 Shanghai, China - W.Hofle CERN Lab.
Integrated phase reference distribution LLRF and laser synchronization system Gang Huang 1, Jin Yang 1,2, Qiang Du 1, Wenhui Huang 2, Yilun Xu 1,2, Larry.
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
Phase Drift Compensation with sub-picosecond Precision over an Optical Link of 3 km for the AWAKE Experiment 06/11/2015 LLRF15, Phase Drift Compensation.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
HINS LLRF Status and Plans Brian Chase For the LLRF Group.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
CC LLRF SM18 test plan and BA6 infrastructure
RF acceleration and transverse damper systems
LKr status R. Fantechi.
LHC RF Embedded SC Cavity Conditioning System
Timing and synchronization at SPARC
Digitizers in CCR for transverse wide-band pick-ups
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
WP02 PRR: Master Oscillator and RF Reference Distribution
RF and Sequences Andy Butterworth BE/RF
Proton Source and LEBT Luigi Celona & Lorenzo Neri
WP02 PRR: Master Oscillator and RF Reference Distribution
Electronics requirements for special diagnostics for the XFEL
LLRF and Beam-based Longitudinal Feedback Readiness
Low Level RF Status Outline LLRF controls system overview
Low Level RF Status Outline LLRF controls system overview
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
LHC Fast Timing Commissioning
Linac Coherent Light Source (LCLS) Low Level RF Status
Linac Coherent Light Source (LCLS) Low Level RF Status
Presentation transcript:

Status of RF synchronization and fast trigger distribution Reported by H. Damerau (CERN) Acknowledgements: J. Moody, P. Muggli (MPP), D. Barrientos, T. Bohl, A. Butterworth, S. Doebert, W. Hofle, J. Molendijk, S. Rey, D. Stellfeld, U. Wehrle (CERN) 19 August 2015

Simplified overview of AWAKE synchronization and RF distribution Laser PLL Fiber receiver/trans mitter 3 GHz master GPS receiver Fiber receiver/trans mitter SPS synchro crate 88.2 MHz (laser) MHz (reference) 10 MHz (reference) 9.97 Hz, 8.68 kHz, MHz, 10 MHz Fractional divider SPS Main RF divider MHz Fast pulse triggers Buffer amplifiers Electron LLRF Various frequencies distributed (many!) Fast pulse triggers (~20 adjustable) Laser Buffer amplifiers Fast pulse triggers MHz Timing MHz Proton LLRF Extraction and bunch rotation triggers BA4 TSG40 BA3/Faraday Cage 2

Laser phase locked loop and RF reference 1.Laser phase-locked loop 2.3 GHz low-noise reference oscillator 3.GPS receiver for 10 MHz frequency reference  Engineering specification draft prepared – 02_AWAKE_EngSpecTemplate_v0.0_LaserLockedLoop_draft2.pdfhttps://edms.cern.ch/file/ /1/ _AWAKE_EngSpecTemplate_v0.0_LaserLockedLoop_draft2.pdf –Feedback from potential supplier expected by end of this week  GPS reference part of package, but could be acquired separately  Most probably also separate optical transmission from BA4  TSG40 with transmitter/receiver provided by CERN 3

New electronic designs 1.Receivers and transmitters for compensated fibre transmission (Diego, John, BE/RF/CS), LHC-type VME form factor  Conceptual design and choices of components completed  Detailed electronics design progressing well 2.Main divider and fractional divider boards (Stephane, HD, BE/RF/FB), LHC-type VME form factor  Conceptual design essentially frozen – iscriminator_ pdfhttps://edms.cern.ch/file/ /1/FrequenciesTimings3GHzReferencePhaseD iscriminator_ pdf  Electronics development can only start in September –Critical hardware, critical path for first prototype in early

Synchronization with SPS 1.Synchronization crate (as for LHC) in BA3/Faraday Cage (Thomas, Urs, BE/RF/BR and BE/RF/FB)  Decision to keep separate RF synchronization  Detailed layout of synchronization extraction process – 13.pdfhttps://edms.cern.ch/file/ /1/ExtractionTimingsSPS-AWAKE_ pdf –  No new electronics development required –Status of spare modules to be checked and made operational –Possibly production run of some hardware  Installation and commissioning expected this year (if boards available) 5

Cabling, crates, racks 1.Two special racks TSG40 (EN/EL and BE/RF FSU team)  Installed by EN/EL and BE/RF FSU team 2.RF distribution cabling  Completed (fully?) under supervision of Guillaume (EN/EL)  many thanks! 3.Optical fibers (TSG40 to BA3 and BA4)  Request submitted to Jeremy (EN/EL)  Separate fibers for GPS reference from BA4 during 2015/16 YETS 4.Special LHC-type VME crates (Donat, BE/RF/FB)  Crate in BA3/Faraday Cage installed  New production run including crates for AWAKE launched 6

RF distribution and fast trigger pulses 1.RF distribution  No new electronics development required –Most probably production run of existing distribution buffers 2.Fast trigger pulse generation  One board per channel (~20 channels)  No new electronics development required –Production run of existing VTU (or CTU) boards  Compile detailed ‘shopping list’ of boards to be tested or reproduced (HD) 7