1 T1-T3 in L1 algorithm  Idea (F. Teubert) Use extra tracking information to measure the large Pt that triggers the event (L1, HLT). Based in the fact.

Slides:



Advertisements
Similar presentations
Freiburg Seminar, Sept Sascha Caron Finding the Higgs or something else ideas to improve the discovery ideas to improve the discovery potential at.
Advertisements

More on making fake TT clusters More creating Fake TT clusters We can compute the number of combinations instead of the purity (following all the possible.
1 Reconstruction of Non-Prompt Tracks Using a Standalone Barrel Tracking Algorithm.
LHCb PatVeloTT Performance Adam Webber. Why Upgrade?  Currently we de-focus the beams o LHCb Luminosity ~ 2x10 32 cm -2 s -1 o ~ 1 interaction per bunch.
B triggering Fabrizio Palla INFN Pisa Consorzio CMS Italia Firenze 7 Sept
27 th June 2008Johannes Albrecht, BEACH 2008 Johannes Albrecht Physikalisches Institut Universität Heidelberg on behalf of the LHCb Collaboration The LHCb.
1  trigger optimization in CMS Tracker Giuseppe Bagliesi On behalf of  tracking group Workshop on B/tau Physics at LHC Helsinki, May 30 - June 1, 2002.
Feb 26, 2004 Mike Hildreth – DØ Collaboration Meeting Run IIb Trigger Simulation Report Mike Hildreth & Ela Barberis for the Run IIb Trigger Simulation.
Increasing Field Integral between Velo and TT S. Blusk Sept 02, 2009 SU Group Meeting.
VELO Testbeam 2006 Tracking and Triggering Jianchun (JC) Wang Syracuse University VELO Testbeam and Software Review 09/05/2005 List of tasks 1)L0 trigger.
In order to acquire the full physics potential of the LHC, the ATLAS electromagnetic calorimeter must be able to efficiently identify photons and electrons.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
L3 Muon Trigger at D0 Status Report Thomas Hebbeker for Martin Wegner, RWTH Aachen, April 2002 The D0 muon system Functionality of the L3 muon trigger.
Tracking at LHCb Introduction: Tracking Performance at LHCb Kalman Filter Technique Speed Optimization Status & Plans.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
April 21st 2010Jacques Lefrancois1 UPGRADE NEWS Scope of upgrade presented by Andrei in upgrade meeting April 16th Role of trigger presented by Hans in.
Optimising Cuts for HLT George Talbot Supervisor: Stewart Martin-Haugh.
TrigSim Status ● What is TrigSim? ● What version do I use? ● Web site ● Basic running ● Features of p ● Drawbacks of p ● Future plans 10/24/03.
1 T1-T3 in L1 algorithm  Outlook: I) Summary of L1-confirmation II) About the TrgForwardTracking package III) Confirming (preliminary)  L1-confirmation.
Jose A. Hernando Trigger Gaudies Reconstruction Tools & Algorithms Inspectors MC & Data Algorithms Template preserved container Jose A. Hernando.
News from Jet/Etmiss Monica. Jet/Etmiss meeting yesterday (25/5) at P&P week – Mostly review of conf notes for ICHEP10 – Good review to check where we.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Standalone FLES Package for Event Reconstruction and Selection in CBM DPG Mainz, 21 March 2012 I. Kisel 1,2, I. Kulakov 1, M. Zyzak 1 (for the CBM.
Detection of electromagnetic showers along muon tracks Salvatore Mangano (IFIC)
Refitting Tracks from DST E. Rodrigues, NIKHEF LHCb Tracking and Alignment Workshop, Lausanne, 8-9th November 2006  Motivations  Step-by-step …  Current.
“Vertexig and tracking ” Entirely based on works and results by: S. Rossegger, R. Shahoyan, A. Mastroserio, C. Terrevoli Outline: Comparison Fast simulation.
TrigSim Status ● What is TrigSim? ● How do I run it? ● How does it compare to actual hardware? ● Where can I get more info? ● What version do I use? ●
Cellular Automaton Method for Track Finding (HERA-B, LHCb, CBM) Ivan Kisel Kirchhoff-Institut für Physik, Uni-Heidelberg Second FutureDAQ Workshop, GSI.
S t a t u s a n d u pd a t e s Gabriella Cataldi (INFN Lecce) & the group Moore … in the H8 test-beam … in the HLT(Pesa environment) … work in progress.
Search for High-Mass Resonances in e + e - Jia Liu Madelyne Greene, Lana Muniz, Jane Nachtman Goal for the summer Searching for new particle Z’ --- a massive.
1 Farm Issues L1&HLT Implementation Review Niko Neufeld, CERN-EP Tuesday, April 29 th.
L1 Global Muon Trigger Simulation Status URL of this presentation:
1 S, Fedele, Student Presentations, 2004/08/04S Amazing Title Slide Reworking the CES Cluster Reconstruction Algorithm By: Steve Fedele Advisor: Pavel.
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
1 HLT (confirmation, generic)  Idea Reconstruct only a fraction tracks In hand:  better PT estimation  signal (secondary) vertices  Data TDR DaVinci.
LHCb Trigger Meeting – Februaryr 9, 2004, CERNMassimiliano Ferro-Luzzi 1 Tagging and Offline selection versus multiplicities What are the “best” multiplicity.
Elliptic flow of D mesons Francesco Prino for the D2H physics analysis group PWG3, April 12 th 2010.
Confirming L1 decision Use: DaVinci v7r4 field 043 Idea (Teubert’s) : Most of min.bias L1 possitive trigger are due to missmeasurements of Pt (P) How mutch.
July 22, 2002Brainstorming Meeting, F.Teubert L1/L2 Trigger Algorithms L1-DAQ Trigger Farms, July 22, 2002 F.Teubert on behalf of the Trigger Software.
1 Reconstruction tasks R.Shahoyan, 25/06/ Including TRD into track fit (JIRA PWGPP-1))  JIRA PWGPP-2: Code is in the release, need to switch setting.
3 May 2003, LHC2003 Symposium, FermiLab Tracking Performance in LHCb, Jeroen van Tilburg 1 Tracking performance in LHCb Tracking Performance Jeroen van.
Muon HLT: status of the algorithms and performance Sergio Grancagnolo for the Muon HLT group.
AliRoot survey: Reconstruction P.Hristov 11/06/2013.
Trigger Strategy and Performance of the LHCb Detector Mitesh Patel (CERN) (on behalf of the LHCb Collaboration) Thursday 7 th July 2005.
BEACH 04J. Piedra1 SiSA Tracking Silicon stand alone (SiSA) tracking optimization SiSA validation Matthew Herndon University of Wisconsin Joint Physics.
Electron and Photon HLT alley M. Witek K. Senderowska, A. Żurański.
1 HLT GENERIC SIGNAL LOSSES ANALYSIS summer internship 2004 Philippe Kobel EPFL, Lausanne, summer internship 2004.
1 HLT (generic)  Data TDR DaVinci v9r3 DC04 DaVici v12r0 DC04 DaVici v12r1  Outlook! # of track candidates!!! Comparation DC04 & TDR data  L1 does a.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
ATLAS UK physics meeting, 10/01/08 1 Triggers for B physics Julie Kirk RAL Overview of B trigger strategy Algorithms – current status and plans Menus Efficiencies.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
Some introduction Cosmics events can produce energetic jets and missing energy. They need to be discriminated from collision events with true MET and jets.
Using IP Chi-Square Probability
A PID based approach for antineutrino selection
Global PID MICE CM43 29/10/15 Celeste Pidcott University of Warwick
Michele Pioppi* on behalf of PRIN _005 group
Status of the Offline Pattern Recognition Code Goa, March 12th 2013
The role of PS/SPD in the LHCb trigger
The Level-0 Calorimeter Trigger and the software triggers
A Fast Hardware Tracker for the ATLAS Trigger System
on behalf of the LHCb collaboration
The LHCb Trigger Niko Neufeld CERN, PH.
Update on LHCb Level-1 trigger
LHCb Trigger, Online and related Electronics
8th International Conference on Advanced Technology and
Hadronic recoil analysis:
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Missing B-tracks in L1 trigger
on behalf of the LHCb collaboration
LHCb Trigger LHCb Trigger Outlook:
Presentation transcript:

1 T1-T3 in L1 algorithm  Idea (F. Teubert) Use extra tracking information to measure the large Pt that triggers the event (L1, HLT). Based in the fact that most of “fake” triggers in L1 are due to bad Pt assignment using TT.  Scenarios: L1 confirmation  Measure Pt of some large IP tracks with TT & T1-T3 in L1 L1 upgrade  Redo L1 algorithm as the 1 st step in L1 using TT & T1-T3 (A question of time and money) T1-T3 in L1 algorithm Status Report Jose A. Hernando (2/2/04)

2 Status Report: T1-T3 in L1 algorithm  Previous study (Zurich 11/03) Using HltLongTracking L1 confirmation  Loose 5% in signal efficiency and reducing the output to 20 KHz  After l1Conf (rough) ~70 ms/event in HLT L1 upgrade  Gain in 1.4 factor in the signal efficiency at the same L1 output 40 KHz.  We only need to track 6 (maybe 4) tracks  Rough time estimation it is 8 ms extra in L1 Long tracks are better than Velo-TT tracks  Current Study The changes New trigger code structure  Rewrite and validate the “new” code Should run in L1 and Raw buffers  And if possible in TDR data Some “minor” bugs in old code  (100 um cutoff in vertex search) The questions Using new trigger structure  Confirm previous results How much extra tracking information do we need?  T1 and T3 only or a fraction of them? Better time estimates

3 From Zurich: L1 confirmation (or) 1 st step of HLT  We L1 confirmation : We can reduce the rate to 20 KHz we with a cost ~5% efficiency  Rough time estimations (1 GHz PIII) Redo some L1 calculation  ~ 6 ms Do the full tacking of some candidates  ~9 ms Current HLT time budget  50 ms If we reduce the rate by ½ each L1- confirmed event will have  ~35 ms reconstruction  ~35 ms HLT decision Efficiency (after L1) vs Output rate

4 From Zurich: L1 upgrade, efficiency vs retention  Comparison between current L1 and upgrade L1 We gain a factor for the hadronic channels B( ,  ) we go from ~62% to ~84% We did not include here the muons channels, (L1 upgrade would have M2- M5 and eff. will be even better)  Rough time estimation Current L1 takes 8 ms Full tracking could add 8.4 ms  8.5 average Velo-TT candidates IP If we track less candidates we can reduce time Efficiency (after L0) vs Output rate

5 From Zurich: L1 upgrade, # tracks to be confirmed  How many Velo-TT tracks do we need to confirm (to match and track in T1-T3)? Order the tracks candidates (IP window) by decreasing Pt Match/track only the n-first  (n= 2,4,6)  With only need to track 4-6 Velo-TT tracks to get almost the full performance. So the long tracking could cost 4-6 ms  50%-80% of the L1 current time  50% more CPU’s for L1?  Do we need T1-T3, can we confirm tracks with only T2, or only T1&T3? we do not know yet, work in progress (structure of the tracking code) B( ,  ) efficiency (L1 upgrade) vs Output rate

6 Towards new tracking working code  Approach (metamorphosis) Start from HltLongTrack package (O. Callot + N. Arnaud) Modify step by steps but keeping it alive (working)  The changes in the “Forward” reconstruction Use of TrgTrack and TrgState, and the new TrgProviders Link with MC via channelID Separate tracking from hit allocation A specific Tool to forward track a single track candidate geo Hits Tracks (Forward) ForwardTrackAlg HitCreator IT/OT Clusters Planes Tracks (TT) Tracks ForwardTrackTool Track geo L1Buffer geo RawBuffer Different versions of the algorithm L1-Raw(HLT) buffer, or TDR-DaVinci Common part for TT only Use TrgTracks as Input/Output It calls the Forward tracking tool It does clone killing HitCreator Planes Hits Planes

7 Status of new tracking working code  Status Hit Creator from IT/OT clusters (TDR-DaVinci data)  In future L1 and Raw buffers Forward Tracking Algorithm and Tool are working  Maybe I did no break anything!  Still some minor clean-up Both algorithms will need extra clean up in a future.  Discussion with Callo, and my presentation in Amsterdam The code it is almost a butterfly (but still in cocoon state) Velo tracks (left) & Forward Tracks (right) Before (up) and after (below) restructure of the code 150 minbias event (before L0)

8 Pattern-search histogram  Patter Recognition Forward Tracking (somehow)  Using input direction & q/p  Define a z-plane ref and a x window (depending on p)  Project x-hits onto that plane histogram: Callo’s (or pattern-search) histo  Use the histo-peaks as tracks seeds  Plan: Investigate how the patter-search histo behaves with less stations Use as reference DsK, and B(pi,pi) channels  Where are the 2 largest pt tracks from the signal? I can run the tracking finding tool only with the hits of the MCParticle! A minbias event Tracks ordered by Pt (velo-TT) Callo’s (pattern-search) histogram

9 Conclusion and plans  Status Forward tracking, based in the code of Ollivier’s it is working in the new structure  Some minor changes needed.  Other changes in the future, but not immediately. Timers are in place.  with my histo/ntuple gaudies… to be replace by the new Gaudi algorithm. Investigating the “possible” degradation of the track patter-search histogram with less stations  Plans Recheck that the “new” tracking code it is working With Lausanne: L1 decision algorithm implementation (we can both use it) Validate the previous results  I sent some jobs over the weekend but.. they crashed.. A memory leak at my age!! Investigate the patter-search histogram with less stations.  We will still see the peak?  We need to invent another method?