Beam tolerance to RF faults & consequences on RF specifications Frédéric Bouly MAX 1 st Design Review WP1 - Task 1.2 Bruxelles, Belgium Monday, 12 th November.

Slides:



Advertisements
Similar presentations
Fault-recovery procedures and associated R&D Frédéric Bouly (IPNO/CNRS) - Isaías Martín (ADEX) MYRRHA accelerator 1 st International Design review WP3.
Advertisements

Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Lorentz force detuning measurements on the CEA cavity
Stephen Molloy RF Group ESS Accelerator Division
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
ESS DTL beam commissioning
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
Low Emittance RF Gun Developments for PAL-XFEL
DTL: Basic Considerations M. Comunian & F. Grespan Thanks to J. Stovall, for the help!
CAS, BilbaoMueller, Ugena, Velez, Zerlauth May 31 st v0 SCC – Industrial ADS.
W. 3rd SPL collaboration Meeting November 12, 20091/23 Wolfgang Hofle SPL LLRF simulations Feasibility and constraints for operation with more.
Anders Sunesson RF Group ESS Accelerator Division
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
1 Simulation for power overhead and cavity field estimation Shin Michizono (KEK) Performance (rf power and max. cavity MV/m 24 cav. operation.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
FNAL 8 GeV SC linac / HINS Beam Dynamics Jean-Paul Carneiro FNAL Accelerator Physics Center Peter N. Ostroumov, Brahim Mustapha ANL March 13 th, 2009.
Fault Tolerance in the MYRRHA superconducting linac
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs A.Farricker 1, R.M.Jones 1, R.Ainsworth 2 and S.Molloy 3 1 The University.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Superconducting Cavity Control & Fault-Compensation Strategy for MYRRHA F. Bouly (LPSC / CNRS), J.-L. Biarrotte (IPNO / CNRS) LLRF-Beam Dynamics Workshop.
1 Overview of the MYRRHA accelerator & presentation of the MAX project Jean-Luc BIARROTTE CNRS-IN2P3 / IPN Orsay, France EURATOM FP7 MAX project coordinator.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
Oleksiy Kononenko CERN and JINR
Marcel Schuh CERN-BE-RF-LR CH-1211 Genève 23, Switzerland 3rd SPL Collaboration Meeting at CERN on November 11-13, 2009 Higher.
A.Saini, K.Ranjan, N.Solyak, S.Mishra, V.Yakovlev on the behalf of our team Feb. 8, 2011 Study of failure effects of elements in beam transport line &
Warm linac simulations (DTL) and errors analysis M. Comunian F. Grespan.
R. Miyamoto, MEBT Lattice Optimization, ESS AD Beam Physics Internal Review 1 MEBT Lattice Optimization Ryoichi Miyamoto (ESS) For Beam Physics Group,
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
Operated by the Southeastern Universities Research Association for the U. S. Department of Energy Thomas Jefferson National Accelerator Facility 6 March.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
Aaron Farricker 107/07/2014Aaron Farricker Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs.
1 & 2 JUNE 2015 – LLRF – BEAM DYNAMICS WORKSHOP URIOT Didier What is taken into account in simulations LLRF – Beam dynamics Workshop.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
1 Superconducting linac design & associated MEBT Jean-Luc BIARROTTE CNRS-IN2P3 / IPN Orsay, France J-Luc Biarrotte, 1st Myrrha design review, Brussels,
DTL: Basic Considerations M. Comunian & F. Grespan Thanks to J. Stovall, for the help!
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
From Beam Dynamics K. Kubo
RF-kick in the CLIC accelerating structures
General Design of C-ADS Accelerator Physics
Physics design on the main linac
Progress in the Multi-Ion Injector Linac Design
Physics design on Injector-1 RFQ
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Challenges and Perspectives of Accelerator Driven Systems (ADS)
Joint Accelerator Research JGU & HZB
12 GeV CEBAF.
CEPC Injector Damping Ring
Pulsed Ion Linac for EIC
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
PETRA IV System design concept Old and new machine
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
MEBT1&2 design study for C-ADS
Physics Design on Injector I
Studies on orbit corrections
DTL M. Comunian M. Eshraqi.
ERL Director’s Review Main Linac
Status of the JLEIC Injector Linac Design
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

Beam tolerance to RF faults & consequences on RF specifications Frédéric Bouly MAX 1 st Design Review WP1 - Task 1.2 Bruxelles, Belgium Monday, 12 th November 2012

Starting point & Objectives 2 Bouly F. MAX 4 th General meeting, Frankfurt12 th November 2012 INTRODUCTION ■ Evaluate the minimum RF power required to enable fault-recovery procedures.  Take Margins as regard to control errors : cavity theoretical parameters (ex: (r/Q)), accuracy of control systems, measurement errors.  It depends on coupling (from the power couplers) - A choice has to be made for each section of the linac.  Re-tuning beam dynamic studies will give the new V cav and ϕ s for each compensation cavity. ■ Carry out beam study based on the reference linac design to :  Give an exhaustive list of critical retuning cases  Evaluate the retuning feasibility ■ From these typical scenarios evaluate the power consumption of recovery cavities in every linac sections

3 Introduction   Beam tolerance to RF Faults - Methodology -Example : loss of a Spoke module - Status on different critical cases   Couplings (Q i ) choices - P RF & Q i are directly linked - Methodology - Results & consequences   RF specifications - Statistical study of errors - RF power required for each section Summary & Prospects Bouly F. MAX 4 th General meeting, Frankfurt12 th November 2012

4 Introduction   Beam tolerance to RF Faults - Methodology -Example : loss of a Spoke module - Status on different critical cases   Couplings (Qi) choices - P RF & Q i are directly linked - Methodology - Results & consequences   RF specifications - Statistical study of errors - RF power calculation for each section Summary & Prospects Bouly F. MAX 4 th General meeting, Frankfurt12 th November 2012

Method 5 Bouly F. MAX 4 th General meeting, Frankfurt  Beam tolerance to RF Faults ■ Simulations are based on the linac reference design (“strong focusing”option 1) (J-L. Biarrotte, “SC linac design & MEBT”)  I 0 = 4 mA ; Beam input parameters from injection line (C. ZHANG, “Injector layout & beam dynamics”) ■ Local compensation - E acc nominal chosen to enable a ~ 30 % increase (based on the SNS):  1 failed cavity (or 1 Cryomodule) is compensated by 2 cavities (or 2 Cryomodules) placed upstream & 2 cavities (or 2 Cryomodules) placed downstream. ■ Procedure developed during previous project :  PDS-XADS () : Procedure setup - Identification of the difficulty to apply local compensation below 15 MeV. (J-L. Biarrotte, D.Uriot,M. Novati, P. Pierini, H Safa “Beam dynamics studies for the fault tolerance assessment of the PDS-XADS linac design”, EPAC 2004).  EUROTRANS : Transient effect study - Definition of dynamic retuning scenario (J-L. Biarrotte, D.Uriot,“Dynamic compensation of an rf cavity failure in a superconducting linac”, Phy. Review, May 1998). ■ The synchronous phases are kept in a range similar to nominal conditions (i.e. -40° ≲ ϕ s ≲ - 15°), in order to try to keep the longitudinal acceptance of the linac. 12 th November 2012

Example : Failure of a spoke cryomodule (1/6) 6 Bouly F. MAX 4 th General meeting, Frankfurt  Beam tolerance to RF Faults Failed module (2 cavities) 4 re-tuned modules (8 re-tuned cavities) Energy & Phase diagnostics Longitudinal size diagnostic Energy diagnostic SPOKE SECTION 5-CELL ELLIPTICAL (β 0.47) SECTION TraceWin Calculations 12 th November 2012

Example : Failure of a spoke cryomodule (2/6) 7 Bouly F. MAX 4 th General meeting, Frankfurt  Beam tolerance to RF Faults Cavities voltage Synchronous phase Beam Energy Cavities RF power (Beam loading) 12 th November 2012

8 Bouly F. MAX 4 th General meeting, Frankfurt  Beam tolerance to RF Faults Example : Failure of a spoke cryomodule (3/6) Fault-recoveryNominal Tuning 12 th November 2012

9 Bouly F. MAX 4 th General meeting, Frankfurt  Beam tolerance to RF Faults Example : Failure of a spoke cryomodule (4/6) 12 th November 2012

10 Bouly F. MAX 4 th General meeting, Frankfurt  Beam tolerance to RF Faults Example : Failure of a spoke cryomodule (5/6) Nominal TuningFault-recovery Emittances (rms) Lattices phase advance 12 th November 2012

11 Bouly F. MAX 4 th General meeting, Frankfurt  Beam tolerance to RF Faults Example : Failure of a spoke cryomodule (6/6) Nominal TuningFault-recovery Longitudinal acceptance of the linac (SC linac + MEBT + HEBT) ε acc / ε RMS ≈ 5.25/0.075 = 70 ε acc / ε RMS ≈ 4.5/0.075 = th November 2012

12 Bouly F. MAX 4 th General meeting, FrankfurtOctober 1 st 2012  Beam tolerance to RF Faults Summary : studied scenarios Spoke β cell β cell β Failure of 1 cavity - Failure of a Cryomodule - Failure of the last cavity - Failure of 1 cavity - Failure of a Cryomodule - Failure of 1cavity - Failure of the last cavity - Failure of the last Cryomodule - Failure of 1 Cryomodule - Failure of the 1 st cavity - Failure of the 1 st Cryomodule (in progress) 11 identified scenarios

13 Introduction   Beam tolerance to RF Faults - Methodology -Example : loss of a Spoke module - Status on different critical cases   Couplings (Q i ) choices - P RF & Q i are directly linked - Methodology - Results & consequences   RF specifications - Statistical study of errors - RF power required for each section Summary & Prospects Bouly F. MAX 4 th General meeting, Frankfurt12 th November 2012

Beam power & RF power amplifier 14 Bouly F. MAX 4 th General meeting, Frankfurt  Q i choice ■ Power delivered to the beam : ■ RF power required from the generator when cavities gets their optimal frequency tuning : with ■ Optimum for coupling :  Ideally, each cavity would have its own power coupler with an optimised Q i (in function of its (r/Q), ϕ s, V cav & I b0 ) ■ To find out the most adapted couplings : we look for the value of Q i which minimise P g /P b (i.e. which minimise the total RF power in nominal configuration)  To calculate the RF power requirements, one has to first choose the coupling values for each of the 3 linac sections. 12 th November 2012

Couplings choice & bandwidth 15 Bouly F. MAX 4 th General meeting, Frankfurt  Q i choice 5-cell Spoke ■ Frequency bandwidth  Spoke (β 0.35) : BW = Hz  5-cell (β 0.47) : BW = Hz  5-cell (β 0.65) : BW = Hz 12 th November 2012

Impact on RF consumption 16 Bouly F. MAX 4 th General meeting, Frankfurt  Q i choice Total RF power increase is negligible : 0.74% (from MW to MW) 12 th November 2012

Return on Spoke failure example 17 Bouly F. MAX 4 th General meeting, Frankfurt  Q i choice ■ Once the Q i has been chosen it is therefore possible to calculate the RF power increase for the recovery cavities in the ideal case : the cavities frequency are perfectly tuned, errors & attenuations are not taken into account. 12 th November 2012

18 Introduction   Beam tolerance to RF Faults - Methodology -Example : loss of a Spoke module - Status on different critical cases   Couplings (Q i ) choices - P RF & Q i are directly linked - Methodology - Results & consequences   RF specifications - Statistical study of errors - RF power calculation for each section Summary & Prospects Bouly F. MAX 4 th General meeting, Frankfurt12 th November 2012

RF Power - Errors & Attenuations 19 Bouly F. MAX 4 th General meeting, Frankfurt  RF specifications ■ RF generator power - general formula  V cav : ± 2%  ϕ s : ± 2°  I b0 : ± 2%  Δf : ± 20 Hz  Q i : ± 2 mm (± 20%)  (r/Q) : ± 10 % ■ Errors taken into account for statistical errors study Example : Cavity n° 76 (β 0.47) which is compensating a failure kW Maxi kW ■ + 10 % margins added from errors study to take into account attenuation and calibration errors draws 12 th November 2012

Summary on RF needs 20 Bouly F. MAX 4 th General meeting, Frankfurt  RF specifications 12 th November 2012

21 Introduction   Beam tolerance to RF Faults - Methodology -Example : loss of a Spoke module - Status on different critical cases   Couplings (Q i ) choices - P RF & Q i are directly linked - Methodology - Results & consequences   RF specifications - Statistical study of errors - RF power required for each section Summary & Prospects Bouly F. MAX 4 th General meeting, Frankfurt12 th November 2012

Conclusions 22 Bouly F. MAX 4 th General meeting, Frankfurt ■ Beam fault-tolerance to a module failure has been demonstrated in each section  Same simulation method applied in each scenario  A special tool should be developed to enable the calculation of the retuning set-points during the linac operation  One scenario to improve : failure of the 1 st Spoke cryomodule - More tricky because bunchers before the failed module have to be retuned  In progress  Carry out simulation with several fault-recoveries in the linac & include errors (misalignments... ) ■ The power coupler Q i requirements have been calculated :  Spoke section (β 0.35) : Q i =  BW = Hz  Elliptical 5-cell (β 0.47) : Q i =  BW = Hz  Elliptical 5-cell (β 0.65) : Q i =  BW = Hz ■ Evaluation of the power requirements to anticipate on control errors + attenuations + fault-recovery scenarios :  Study with faults showed that a reasonable choice for the RF amplifier power would correspond to take a minimum margin of ~ 70 % (75% foreseen) compare to the nominal required Power (errors + attenuations + fault recovery).  Spoke section (β 0.35) : 15 kW  Elliptical 5-cell (β 0.47) : 30 kW  Elliptical 5-cell (β 0.65) : 55 kW ■ R&D activities for fault-recovery procedures study on a real scale experiment will be presented tomorrow. (R. PAPARELLA, “SC elliptical cavities design & associated R&D” - F. BOULY, I. MARTÍN, “Fault- recovery procedures & associated R&D”) 12 th November 2012

23 THANK YOU ! Frédéric Bouly MAX 3rd General meeting, Madrid12 th November 2012