1 The Rural Alliance January 25, 2006. 2 2006 – A Critical Year 2006 will be a critical year for the RLEC industry Multiple events with significant impact.

Slides:



Advertisements
Similar presentations
Universal Service Funding An Overview of the Connect America Fund Marsha Spellman, JD Oregon Connections Conference October 25,
Advertisements

Telecommunications Law CLE State Deregulation at the PUC December 2014 Pete Kirchhof Colorado Telecommunications Association.
Different approaches before and after Telecom Act Before Telecom Act –Implicit cross subsidies –Based on rate of return approach –ILECs only receivers/IXCs.
TELECOM POLICY UPDATE: Impact of the FCC USF NPRM MTIA Industry Affairs Conference May 17, 2011 Steve Kraskin
Wireline Competition Bureau 2004 Promoting Real Consumer Choice and Investment in Broadband Facilities.
FCC Broadband Workshop “State and Local Government Toolkits and Best Practices” September 1, 2009 Commissioner Ray Baum Oregon Public Utility Commission.
MOSS ADAMS LLP | 1 © Moss Adams LLP | April 2012 V2 Rural Telecom Revenues FCC Reform Spring 2012 Presented to ABC Communications.
An analysis of the FCC’s USF and ICC Broadband Reform Proposals.
Basic Telecom Sector Reform Issues: Competition, Tariffs & Interconnection Hank Intven Seminar on ICT Policy Reform and Rural Communication Infrastructure.
Broadband ? Bob Loube NASUCA 2011 Thanksgiving Loube NASUCA
February 19, 2008 How Should We Think About IP-PSTN Interconnection? NARUC Committee on Telecommunications.
© 2004 AT&T, All Rights Reserved. The world’s networking company SM An Evolution Path for Numbering and Interconnection Future Of Numbering Symposium November.
MOSS ADAMS LLP | 1 Tribal Telecom 2013 Federal Telecommunications Regulatory Updates.
Intercarrier Compensation. Nextel calls to BellSouth BellSouth pays to terminate Nextel calls In aggregate, it may cause BellSouth to increase capacity.
ECO 436 Industry Studies Seminar David G. Loomis Universal Service.
1 Keeping Consumers Connected Washington State and Universal Service WUTC Workshop May 5, 2010 John F. Jones CenturyLink Vice President State Government.
Alliances with NGOs ESM210 November 7, Types of Alliances Corporate sponsorship  Firm contributes to the environmental group financially or in.
Unified Intercarrier Compensation – An Old Problem 1980 FCC Tentative Access Plan (pre- divestiture) Found the wide variety of existing access compensation.
1 Intercarrier Compensation: A Rural Perspective 2006 Annual Meeting August 8, 2006.
NMECG PRESENTATION TO THE NEW MEXICO PUBLIC REGULATION COMMISSION APRIL 3, 2012 THE FEDERAL COMMUNICATIONS COMMISSION’S ORDERS TO IMPLEMENT REFORM AND.
Joint Board Recommendation USF Reform NARUC Winter Meeting February 2008 Ray Baum Commissioner Oregon Public Utility Commission State Chair USJB.
© Copyright 2007 Arbinet-thexchange, Inc. All Rights Reserved. Voice Peering Steve Heap Chief Technology Officer.
Opening Markets and Keeping Them Open: A Contract and Antitrust Model Ray Gifford, Chairman Colorado Public Utilities Commission.
Phil Nyegaard Public Utility Commission State of Oregon January 11, 2006 Creating an Extended Area Service (EAS) Region.
Different approaches before and after Telecom Act Before Telecom Act –Implicit cross subsidies –Based on rate of return approach –ILECs only receivers/IXCs.
Changes in State and Federal Telecommunications Policies: How Do They Affect US All? SCAN NATOA 16 th Annual Spring Conference and Star Awards Long Beach,
Better Thinking. Better Results. Where does my Recovery Come from? Presented by: Bob Schoonmaker MTIA/ATA Annual Meeting August 9,
NASUCA 2012 mid-year meeting
Missoula Plan Plan reflects themes that always seem to appear – Different treatment for different ILECs by size and by type of regulation (price cap versus.
Access Charges The major questions –What services did IXC’s require in order to provide their interLATA toll and private line services? –What to do about.
Proposal for Reforming the Intercarrier Compensation and Universal Service Systems CTIA – The Wireless Association™ May 18, 2005.
Financial Considerations in the New World!! GTA Annual Meeting Hilton Head, SC June 19, 2012 Leo Staurulakis – Executive Vice President.
Comptel/ASCENT February 17, Tom Sugrue Vice President Government Affairs T-Mobile.
THE NEW FCC NPRM THE CHALLENGES, THE RESPONSES AND THE PLAN OF ATTACK A Briefing Provided By The Rural Broadband Alliance STEPHEN G. KRASKIN and DIANE.
International Protocol George Vinall April 1, 1998 Economics of Internet Telephony.
Implications of VoIP TC 310 May 28, Questions from Reviews Duty to Interconnect Reciprocal compensation Line of business v statutory line of business.
BROADBAND ACCELERATION INITIATIVE: POLES, ROW State and Local Government Webinar (FCC) Oct. 5, 2011.
1 Wireline Competition Bureau Competition and Universal Service in a in a Dynamic Marketplace.
The Nation Broadband Plan & Its Effects on USF and ICC Reform Krista K. Tanner Iowa Utilities Board June 7, 2010.
How Telephone Companies Make Money Doug Kitch Vince Wiemer Vince Wiemer.
Universal Service and USF Reform: Establishing a Rational and Efficient System Presentation to NASUCA Mid-Year Meeting San Antonio, TX June 28, 2011.
Summary and State Implications FCC Report and Order and Further Notice of Proposed Rulemaking CenturyLink February 28, 2012.
USF Reform NARUC Panel Presentation Dale Lehman Director, Executive MBA in Information and Communication Technology Alaska Pacific University
1 Intercarrier Compensation May 27, 2004 Glenn Brown
How can Liberalization maximize the Benefits from the Telecommunications Sector to the Caribbean Lisa Agard VP Legal Regulatory and Carrier Services TSTT.
Multi-Provider Migration Discussion Group Proposal for Change February 12, 2003.
Better Thinking. Better Results. Beyond “The Order” – The New Regulatory Horizon for Rural Carriers Bob Schoonmaker, President GVNW Consulting,
Applications of Cost Proxy Models Universal Service William W. Sharkey* and D. Mark Kennet** November 2000 * FCC and The World Bank ** George Washington.
Cost Recovery Mechanisms MATI Tribal Telecommunications Conference June 7-9, 2004 Presented by Doug Kitch & Vince Wiemer Alexicon, Inc.
Wireline Competition Bureau 2006 Annual Report January 17, 2007.
Local Reductions Incentive Program (LRIP) Encouraging Collaborative Solutions for the Future.
The Regulation of Network Industries Simon Wilkie. Caltech Lecture for May 7, 2004.
A group subsidiary Irene Charnley Commercial Director 28 September 2001 Comments on the Telecommunications Amendment Bill.
Intercarrier Compensation: Rate of Return Carrier Impacts Washington Utilities and Transportation Commission – Workshop February 28, 2012 Jeff Dupree NECA.
Level 3 Petition for Forbearance from Interstate and Intrastate Switched Access Charges Victoria R. Mandell Regulatory Counsel Level 3 Communications,
Finding the Right Balance for Rural America: Telecom Policy, Politics and Predictions August
© 2010 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Intercarrier Compensation.
Workshop for West-African Telecommunication Regulators Abuja (Nigeria), September 21-22, 2000.
The Potential Effects of the National Broadband Plan
Agenda Model Accuracy Sufficiency of support and reasonable comparability of rates Standards for Unsubsidized Competitors Disaggregation Caps in the Presence.
Development of the Telecommunications Industry
Different approaches before and after Telecom Act
Level 3 Voice Services Network Architecture June 15, 2004
Internet Interconnection
FCC National Broadband Plan (NBP) and Rural Universal Service Reform
Thursday, September 3, :30 – 9:15 a.m.
Reciprocal Compensation
CTIA – The Wireless Association™ May 18, 2005
Multimedia Training Kit
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Presentation transcript:

1 The Rural Alliance January 25, 2006

– A Critical Year 2006 will be a critical year for the RLEC industry Multiple events with significant impact – FCC Intercarrier Compensation FNPRM – Post-RTF Universal Service Program – USF Collection Mechanism – 1996 Telecom Act Re-Write – Consolidation of the RBOCs and IXCs – Brand X Ramifications Policy ideas with negative implications for RLECs – Bill & Keep – USF mechanisms that are not based on costs – Unregulated IP Interconnection – Giving VoIP and IP-enabled services a free ride How much of your cash flow comes from USF and Intercarrier Compensation? – It will all be in play

3 The Rural Alliance ARIC and EPG joined to form the Rural Alliance Over 250 RLECs, state and national associations and other stakeholders now make up the Rural Alliance Major Goals – Develop effective ICC and USF solutions and advocacy – Create a policy environment that will promote continued infrastructure investment in high-cost rural areas – Encourage additional rural stakeholders to join the cause – Create a powerful advocacy coalition Major Activities – Comments and advocacy – Effective messaging on critical telecom issues

4 The ICC Problem Disparate charging mechanisms based on: – Jurisdiction (intrastate, interstate) – Nature of the call/technology (local, long distance, Internet) – Type of carrier (LEC, IXC, CMRS, ISP, end-user) System is neither economically rational nor sustainable – Disparities leading to arbitrage and/or fraud – Phantom traffic – Inability to differentiate between interstate, intrastate and local traffic

5 Key ICC Issues How to unify the ICC rate structure? Which jurisdiction has authority over unified rates? Level of unified rate – Finite cost-based rate – Zero rate (i.e., Bill and Keep) Application of unified rates – Originating and terminating – Terminating only Do we need new interconnection rules? Revenue replacement issues – Increased SLC charges – New revenue replacement mechanism

6 Where Are We Now? FNPRM issued March 3, 2005 Comments filed May 23, 2005 Reply comments filed July 20, 2005 NARUC ICC Task Force facilitating negotiations among parties

7 Synopsis of Rural Alliance Comments Unified cost-based rates Compensation for both originating and terminating traffic Maintain access and reciprocal compensation rules Establish nationwide local rate benchmarks Increase SLCs to current cap levels before receiving revenue replacement funding Maintain existing interconnection rules and meet- points Develop rules that minimize “phantom traffic” Collaborative federal/state solution

8 Key Issues in ICC Negotiations 1. Originating Compensation 2. “Two-Track” Approach 3. Level of Rates 4. Access Replacement Mechanism (ARM) 5. Interconnection Rules 6. Commitment to Agreements

9 Originating Compensation LECs should be compensated for usage of their network by other carriers The ICF plan proposes elimination of originating compensation RLECs have “equal access” and 800 service obligations to originate traffic for others who bill the customer for the call 251(b)(5) rules do not contemplate these call origination obligations We have yet to find any valid public interest reasons why originating compensation should be eliminated

10 “Two-Track” Approach RBOCs and RLECs have vastly different service territories and cost structures RLECs depend on revenue contribution from ICC and USF/ARM to meet universal service and COLR obligations If RLEC ICC rates are driven too low there will be serious ramifications for the ARM It is in the public interest for RLECs to have different ICC rates and transition strategies than RBOCs

11 Level of Rates RLEC’s ICC rates should be cost-based RLEC rates should be based on the unseparated traffic sensitive cost of providing local switching and transport services The Transport Interconnection Charge (TIC) should be reinstated into RLEC transport rates Bill & Keep is not in the public interest because: – It is not cost-based – It would invite uneconomic network usage – It would create excessive reliance on USF and make the fund less sustainable – It will harm consumers, especially in rural areas

12 Access Replacement Mechanism Rate-of-Return carriers should receive replacement of revenues lost due to the unification of disparate interstate and intrastate intercarrier rates RLEC SLCs are already high, and should not be increased much more if rates are to remain comparable An Access Replacement Mechanism (ARM): – Should be computed as the difference between current rates and rules and the new “unified” rate levels – Should be available to RLECs that meet defined local service rate benchmarks – Should not be portable to CETCs that do not experience revenue loss due to rate unification

13 Interconnection Rules Existing meet-points and interconnection rules (with certain exceptions) are working well The ICF “Edge” proposal is overly complex, would impose additional costs on RLECs and other carriers, and is designed to eliminate originating compensation NARUC Staff’s “3-Segment Edge” proposal (10/21/05 version) is a better paradigm for the definition of intercarrier compensation obligations ICC reform must address flaws in the current interconnection rules and practices (e.g., VNXX, IntraMTA) RLECs should not be obligated to carry traffic beyond their local network boundaries

14 Commitment to Agreements Any reasonable ICC solution will involve significant new universal service funding or similar mechanisms (i.e. ARM) Parties to any negotiated settlement must commit to not engaging in policy advocacy that would seek to undermine the ARM and USF Such commitment must include the party itself, and any third-party advocacy groups that it supports

15 RA/NASUCA Plan (as of 12/21/2005) Two-Track Plan – RBOC BellSouth Plan ($ tandem, $ end office) SLC Cap increases up to $1 ARM funding phased out over 5 years – Non-RBOC Unified cost-based rates w/TIC (average ≈ 2 cents/min.) FCC review in year 4 to determine if uniform target rates appropriate and originating rates should continue SLC Cap increases $1 Full ARM funding for 8 years (FCC reviews in year 8)

16 RA/NASUCA Plan (as of 12/21/2005) ARM equals intercarrier revenue loss, less local rate increases to benchmark (or imputation) 3-year phase-in of local benchmark at national urban average ARM not part of USF and not portable ARM funded by all (same mechanism as new USF contribution) Collaborative federal-state plan with inducements – State must buy-in to target rates and local benchmarks to qualify for ARM funding – State Inducement Fund for “early adopter” states (replaces 50% of non-RBOC access-related intrastate USF) 3-Segment Edge proposal (as of 10/21/05) with modifications

17 1/11-13 Task Force Meeting RA presents recommendations for Rural RoR carriers ICF makes changes in its plan – “Optional” originating rates (Rural carve-out eliminated) – Tandem provider acts as “banker” for ICC – Recommendation for a “three-track” solution Mid-Size Carriers and ICF develop preliminary “Track 2” plan Proposal to initially transition to interstate followed by a “mid-course review” to determine ultimate rates Ray Baum appoints “Group of 10” to attempt to develop consensus plan – Each “Track” to make recommendations – Interconnection sub-group also created

18 Initial Three “Track” Concept Track 1 – Non-Rural Price Cap Carriers Track 2 – Rural Price Cap Carriers, Non-Rural RoR Carriers, Other Track 3 Carriers that choose to “opt-in” Track 3 – Rural Rate of Return Carriers

19 Rural RoR Proposal (1/17/06) Step Year Begin July 1 Network Interconnect Reciprocal Comp Originating & Terminating Compensation 2 SLC Cap Increases Local Rate Benchmarking 3 Access Recovery Fund Rural RoR Carriers Rural Carriers only responsible for transport of “local” calls within their local footprint 4 No LERG- Slamming Existing meet points 251(b)(5) and 251(g) remain in place ISP-bound traffic as defined in current FCC rules Reduce by 25% of difference between Inter and intrastate switched rates and adopt interstate structure 4 with TIC reinstated in transport and ICLS reduced $ 0.25 per line increase to offset, on a dollar for dollar basis, the access revenue reduction Increase local rates to 75% of benchmark rate Create single new support mechanism (ARM) for Rural RoR carriers to recover access revenue reductions that cannot be recovered through SLC and Local Rate increases on an dollar for dollar basis 5 Include an “Early Adopter Fund” to recover 50% of existing state funds established to reduce intrastate access The ARM would not be portable to carriers that do not experience a revenue loss as a result of rate unification. Any CLECs ARM based upon revenue loss from ICC reductions The ARM would continue for the duration of Phases 1 and II of the plan. The FCC can then determine what portion of the ARM should be harmonized with traditional USF A “Unity Agreement” will be developed Reduce by 25% of difference between inter and intrastate rates $ 0.25 per line increase to offset, on a dollar for dollar basis, the access revenue reduction Increase local rates to 85% of benchmark rate Reduce by 25% of difference between inter and intrastate rates $ 0.25 per line increase to offset, on a dollar for dollar basis, the access revenue reduction Increase local rates to 100% of benchmark rate All access rates reduced to interstate rates $ 0.25 per line increase to offset, on a dollar for dollar basis, the access revenue reduction 42009FCC review and recommendations for additional ‘Phase 2’ intercarrier compensation rate unification Begin Implementation of Phase 2 Reform

20 Rural RoR Proposal - Footnotes 1. As defined in the Telecommunications Act of Optional pooling and rate banding as today. At the option of the LEC, tandem provider provides billing of ICC rate with 5% mark-up for tandem switched calls. Terminating rates applied to reciprocal compensation if no contract exists at plan implementation. If a contract exists, upon expiration rate will be the lower of contract rate or unified rate. Termination rates would not apply to existing mandatory EAS arrangements between ILECs. Rates would apply to IP  PSTN termination, but not to IP  IP termination. 3 If a carrier chooses not to increase rates to the benchmark level, the benchmark would be imputed in the ARM calculation. 4 Local calling area of the originating carrier determines call type for originating compensation. 5 ARM for RoR carriers would be calculated by taking interstate switched and special access revenue requirement, plus base year intrastate net switched and special intercarrier revenues, less net revenues from unified intercarrier rates, less SLC, less increase of local rates to benchmark levels, less ICLS, less LSS. The ARM will provide the ability and incentive for rural carriers to invest in rural network infrastructure.

21 Initial Position of Other Tracks Track 1 – Essentially the ICF plan – Uniform termination charge $ – Eliminate originating compensation – SLC cap increase $3.50 – Universal service fund (portable) to replace revenue loss Track 2 – Target rates at or slightly above rates in CRTC portion of ICF plan $ transport + $ termination (ICF CRTC) – SLC cap increase less than ICF but more than RA – ARM (non-portable) to replace revenue loss

22 Major Issues for Resolution Definition of the three “Tracks” Sustainability of the ARM – Who qualifies – Early Adopter Fund Rate issues – Specific rate levels – Benchmark rate – SLC rate – TIC Interconnection issues – Definition of 251(g) and 251(b)(5) traffic – Should there be compensation for EAS traffic? – Transport obligations of RLECs Network Architecture Unity Agreement

23 Next Steps? NARUC “settlement” discussions continue NARUC Winter Meetings 2/12 – 14 FCC FNPRM??? Comments and Replies??? Ex-Partes

24 Where Do We Go From Here? Much has been accomplished – The RA has a sound ICC reform proposal – We are reaching out to other rural stakeholders – We are forming an alliance with consumer interests – We are getting traction on many of our key issues But much remains to be done – Continued dialogue with NARUC, NASUCA and other stakeholders – Other USF related dockets – Continued FCC and Hill advocacy We are in a war for our survival!

25 The Bottom Line Join the Rural Alliance The stakes are enormous – the time is short Powerful interests are trying to move the process in a direction harmful to RLECs and rural consumers Policy makers respond best to broad coalitions Chairman Martin will be receptive to well-crafted rural policy solutions Together we can be stronger!