LEGISLATIVE UPDATE Robert A. Tardif, P.E., Administrator Subsurface Systems Bureau New Hampshire Department of Environmental Services.

Slides:



Advertisements
Similar presentations
Department of Environmental Protection CLEAN FILL POLICY
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Septic Tank, Grease Trap, and Holding Tank Standards and Specifications AOWA:Basic Installer Course1 (1)A new, replacement, or repaired septic.
Intro to Maine Subdivision Law
Land Use Program Septic System Overview Scott Weldon
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 4: Design and Plan Review— Conventional Systems Part.
HOUSE BILL 89 ONSITE WASTEWATER STAKEHOLDER MEETING 2 nd meeting September 8, 2011 Crystal Lovett, MO DNR Facilitator, and DNR-DHSS Panel.
2012 Plumbing Codes International Plumbing Code Uniform Plumbing Code David McCarthy, P.E. City of Phoenix.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
SEPTIC SYSTEM DESIGN. SEPTIC SYSTEM DESIGN Ken Stratton.
The New Mexico Environment Department The Department’s Mission is to provide the highest quality of life throughout the state by promoting a safe, clean,
Connecticut Department of Energy and Environmental Protection.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Alabama Dept of Public Health New Onsite Regulations Overview of Permitting Requirements.
Model Home Permitting and Temporary Certificates of Occupancy Orange County BCC January 27, 2015.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
FORM 1000 – APPLICATION TO DRILL, RECOMPLETE OR REENTER.
Indiana Confined Feeding Operations Permit Program Indiana Department of Environmental Management.
Lancaster County Property Transfer Code John Chess REHS, MPA, Water Quality Supervisor Lincoln Lancaster County Health Department Doug Smith REHS, Environmental.
January Goals: Streamline permitting process for certain solid waste facilities and activities Expand use of 3 rd party inspectors to allow MassDEP.
SITE EVALUATION BASICS OF THE TRADE. Ken Stratton.
Chapter F.A.C. Updates Solid Waste Program.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
OSM CCB Placement in Coal Mines - Proposed Rulemaking John R. Craynon, P.E. Chief, Division of Regulatory Support Office of Surface Mining Reclamation.
Final Rule Setting Federal Standards for Conducting All Appropriate Inquiries U.S. EPA Brownfields Program.
Taking Care of Your Water Rights: Permits, Extensions & Certificates Oregon Association of Water Utilities August 2013 Lisa Jaramillo Water Right Services.
BCC Public Hearing for consideration of an Agreement to Offer Donation of Real Property -and- a Solid Waste Management Permit Renewal APPLICANT: Hubbard.
My septic system is working just fine! New State Wide Rules Began 1 st of 2015 replacing the 1977 code Goals Update system designs to currently available.
Board of County Commissioners PUBLIC HEARING January 5, 2010.
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Amendments to Orange County Code Chapter 9 (Building & Construction Regulations) Orange County BCC June 16, 2015.
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
Location Exception Increased Density Eric R. King Week Five September 30, 2010.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 4: Design and Plan Review— Conventional Systems Part.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Stanton Energy Center Solar Facility Presentation to the Board of County Commissioners February 22,
ENVIRONMENTAL PUBLIC HEALTH Onsite Wastewater Treatment Jim Gaughan, P.E., Environmental Engineer Bureau of Environmental Health Services.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
NC Rules and Requirements: Certified Inspectors of Subsurface Systems NC Certified Inspector Training School.
1 Revised Suggested Modification 3 CO-12 Prevent the disposal of animal waste, wastewater and other byproducts of human, crop-based-agricultural or equestrian.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Item 21 May 11-12, 2004 CIWMB Meeting Discussion And Request For Rulemaking Direction To Formally Notice Proposed Regulations For RCRA Subtitle D Program.
1 Draft Final Safe Fill Regulations Major Changes/Revisions Presented to the CSSAB November 8, 2002.
West Pinal PM 10 Nonattainment Area Construction Dust Rule DECEMBER 9, 2015 JOSH DEZEEUW ENVIRONMENTAL PROGRAM MANAGER 1.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Department of Environmental Quality Life-of-Site Permitting Required Changes to Solid Waste Management Rules 15A NCAC 13B March 10, 2016.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
Septic System Overview
Cross Connection Survey Training
Department of Environmental Quality
Overview of Part 213 Amendments Senate Bill 717 – Act 381 of 2016
Homeowner Responsibility
Division of Waste Management
Tuscarawas County Health Department Operation Permit
Private Septic Systems
Department of Environmental Quality
Private Septic Systems
WHAT YOU NEED TO KNOW ABOUT FINANCIAL ASSURANCE
Department of Environmental Quality
Rulemaking and Readoption of 15A NCAC 02T Soil Remediation Rules
Homeowner Responsibility
Presentation transcript:

LEGISLATIVE UPDATE Robert A. Tardif, P.E., Administrator Subsurface Systems Bureau New Hampshire Department of Environmental Services

HB 1415 Relative to Permits for Repair or Replacement of Sewage and Waste Disposal System.

Realtors Approached Representative Warden Initial Proposal brought Back the R&R Rules from 1999 Bill was Passed/Adopted with Amendment on March 7 th Which Created a Permit-by-Rule

RSA 485-A:33, IV (a) The repair or replacement in-kind of a sewage or waste disposal system shall qualify for a permit by rule, provided all of the following criteria are met: (1) The existing system receives only domestic sewage. (2) There is no increase in sewage loading proposed for the repaired or replacement system.

(3) The bottom of the bed is located no less than 24 inches above the seasonable high water table. (4) The system is located 75 feet or more from an abutters well unless there is a standard well release form recorded with the registry of deeds in accordance with RSA 485-A:30-b or there is an existing department waiver to the distance for the abutters well.

(5) The system is located 75 feet or more from the owners well unless there is an existing department waiver to the distance for the owners well. (6) The existing system received prior construction and operational approval from the department and the replacement or repaired system will conform to the provisions of such approval, provided the department may by rule require a minimum septic tank size of 1,000 gallons.

(7) The system is not within 75 feet of any surface water, water supply well, or very poorly drained soil unless authorized by the prior departmental approval described in subparagraph (6). (8) No new waivers to the departments rules are requested. (9) The system has not been previously repaired or replaced under a permit by rule in accordance with the provisions of this paragraph.

(b) Construction of the system may proceed upon the submission of an application to the department by a permitted designer under RSA 485-A:35 and receipt of the permit by rule from the department.

(c) The repaired or replacement system shall not be covered or placed in operation without final inspection and approval by an authorized agent of the department. All inspection by the department shall be accomplished within 7 business days after receipt of written notice from the installer that the system is ready for inspection. The installer shall provide the authorized agent of the department, at the time of the inspection, a copy of the previously approved plan bearing the state approval stamp and associated operational approval, and an existing conditions plan bearing the seal of the permitted designer performing work under the permit by rule.

(d) The applicant submitting the permit by rule application shall assume all liability and responsibility for the components of the design that are part of the system being repaired or replaced under the permit by rule. (e) The installer constructing the system shall assume all liability and responsibility for the construction of the system components repaired or replaced under the permit by rule.

HB 1721 Relative to permitting for the replacement of sewage disposal systems and relative to oil spillage prevention, control, and countermeasure plans.

Sponsered by Representative Ritter (Builder) Addresses the Expansion Rule Env-Wq 1415 Initial Proposal did not require any DES Oversight So Long as the System had DES Approvals Bill was Passed/Adopted with Amendment on March 7 th

(a) No construction or operational approval shall be required from the department prior to expanding, relocating, or replacing any structure that does not increase the load on a sewage disposal system, as long as all of the following conditions are met:

(1)(A) The lot is served by a sewage disposal system that received construction and operational approval from the department within 20 years of the date of the issuance of a building permit for the proposed expansion, relocation, or replacement; or (B) The lot is 5 acres or more in size.

(2) If the property is nonresidential, no waivers were granted in the construction or operational approval of any requirements for total wastewater lot loading, depth to groundwater, or horizontal distances to surface water, water supply systems, or very poorly drained soils. (3) When applicable, the proposed expansion, relocation, or replacement complies with the requirements of the shoreland water quality protection act, RSA 483-B.

b) An owner of a project that requires department approval to proceed because neither of the conditions of subparagraphs (a)(1)(A) or (B) are met, may either submit for approval a design for a new sewage disposal system or apply for a permit by rule for in- kind replacement under RSA 485-A:33, IV. Under either approach, once approval for the sewage disposal system is received from the department, work may commence on expanding, relocating, or replacing the structure. Construction of the sewage disposal system is not required to satisfy the requirements of this subparagraph.

DISPOSAL OF SPENT LEACHFIELD MATERIALS MANAGED UNDER THE WASTE MANAGEMENT DIVISION RULES AS A LEACHFIELD REPAIR RESIDUALS LANDFILL MANAGED UNDER THE WASTE MANAGEMENT DIVISION RULES AS A LEACHFIELD REPAIR RESIDUALS LANDFILL Env-Sw Leachfield Repair Residuals Landfills. Subject to Env-Sw (Exemption Conditions), no permit shall be required to bury waste soil and stone from the repair or replacement of existing leaching fields regulated under Env-Ws 1000, provided that:

(a) The burial location shall be on the same property as the waste generation site; (b) The buried waste shall be placed at least 4 feet above the seasonal high water table and bedrock; and (c) The burial location shall meet the minimum separation distances for leach bed trenches required in Env-Ws 1008.

WASTE CONCRETE May be managed the same as soil and stone in accordance with: Env-Sw On-site Asphalt and Masonry Debris Landfills; and Env-Sw Abandoned Underground Structures USE COMMON SENSE WHEN BURYING MATERIAL ON-SITE