A UTONOMOUS R ESCUE V EHICLE (T EAM 10) Team members: Julia Liston, Vipul Bhat, Krithika Iyer, Ruiyang Lin.

Slides:



Advertisements
Similar presentations
ECE 477 Design Review Team 16 Neil Kumar, Scott Stack, Jon Roose, John Hubberts.
Advertisements

Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
Left to Right: Michael Kelton, Ethan Hall, Greg Wegman, Vashisht Lakhmani.
TEAM 9 - MRAV DESIGN CONSTRAINTS ANALYSIS by Nick Gentry.
ECE 477 Group 8 Recon Robot Arjun Bajaj Aabhas Sharma Abhinav Valluru Vinit Bhamburdekar.
A UTONOMOUS T RACKING R OBOT Team 7 Victor Abreu Thomas Schreifer Brent Eisenmann Matthew Beutler Peng Xie Hisham Hassan Sponsor: ECE Department Faculty.
OutLine Overview about Project Wii Robot Escaper Robot Problems and Solutions Demo.
 Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design  Schematic and theory of operation.
A.G.I.L.E Team Members: Brad Ramsey Derek Rodriguez Dane Wielgopolan Project Managers: Dr. Joel Schipper Dr. James Irwin Autonomously Guided Intelligent.
EE396 Project Micromouse Team: Ocha. Team Members Kanoa Jou (Programmer) Ryan Sato (Hardware) KiWoon Ahn (Recorder) Alan Do (Programmer)
RAMMBO the Robot Butler RAMMBO the Robot Butler R obert Moroson A ngela Uribe M elissa Jansen M ahdi Moghaddamzadeh B ianca Ragin O ur team (as stated.
Team GPS Rover Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
UEzMOW University Of Evansville Team: Mark Randall Systems Design (Team Captain) Zachariah Fuch High Level Control s Addisu Taddes Low Level Controls.
Deon Blaauw Modular Robot Design University of Stellenbosch Department of Electric and Electronic Engineering.
R3R3 Ethan Hall Michael Kelton Greg Wegman Vashisht Lakhmani.
Design Review: RoboSiM Robotic Surveillance in Motion
BLDC MOTOR SPEED CONTROL USING EMBEDDED PROCESSOR
ECE 477 DESIGN REVIEW TEAM 7  SPRING 2013 COST ROBOT CAROLINE TRIPPEL, ANDREW LOVELESS, ERIC OSBORNE, BRYAN DALLAS.
Engineering 1040: Mechanisms & Electric Circuits Fall 2011 Introduction to Embedded Systems.
ECE 477 F INAL P RESENTATION T EAM 10  S PRING 2013 Ruiyang Lin Vipul Bhat Julia Liston Krithika Iyer.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 FINAL PRESENTATION TEAM 7  SPRING 2013 COST ROBOT ERIC OSBORNE, BRYAN DALLAS, ANDREW LOVELESS, CAROLINE TRIPPEL.
Long Range Vehicle Control (Super Tank) Jason Holmes Matt Wickesberg Matt Guenette Michael Piercy.
Administrative Introduction Our goals for this project is for the two robots to work together intelligently using wireless communication Not only did.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
Xin Jin Zelun Tie Ranmin Chen Hang Xie. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
o Portable low-cost aerial drone that can be used for reconnaissance o Relay real-time video and data, like location, heading, battery life o Take high-resolution.
GROUND UTILITY NETWORK DECIPHERING AUTOMATED MACHINE GROUP 10 BLAKE SIMONINI DIDIER LESSAGE GABRIEL RODRIGUEZ G.U.N.D.A.M.
To come up with a practicum project that full filled the 411 requirements Create a fun project that would get kids interested in science and engineering.
Wall-E Prototype I Team 1 Xin Jin
ECE 477 Design Review Team 01  Fall 2010 Jigar Gandhi Chandler Wall John-Taylor Smith Eric Zarowny.
RomoRobot Feras Khateeb Yousef Azem supervisors Dr.Raed Al-Qade Dr.Lui Malhis.
Robot Swarm Work group : Ibrahem Batta. Emad Shakhshir. Supervisor: Dr. Ashraf Armoush.
ECE 477 D ESIGN R EVIEW T EAM 5 MY ATM F ALL 2012 Tung Lun Loo Yu Chen Lim Chuan Yean Tan Xue Yuan Wong.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
ECE 477 Final Presentation Team 12  Spring 2013 Xirong Ye Zongyang Zhu Chun Ta Huang Libo Dong.
ABSTRACT: ECE 477 Team Autonomous Rescue Vehicle Presented by Vipul Bhat Our team’s goal is to build a prototype of a robot that can autonomously.
Design Constraint Analysis Team KANG Group 1. Sentry Gun Design and build a turret and armature structure with the ability to detect, track and fire upon.
Team /02/28 1. Chun Ta Huang Xirong Ye 2 Libo Dong Zongyang Zhu.
Grassinator1300 Senior Design Mid-Semester Design Presentation 2014.
Jason Holmes Matt Wickesberg Michael Piercy Matt Guenette Team 12 – Super Tank February 15, 2012.
Team 10 Julia Liston. Project Overview  Our team’s goal is to build a prototype of a robot that can: Use GPS to locate a lost person Autonomously navigate.
Mark Randall & Kevin Claycomb Faculty Advisor: David Mitchell Industrial Sponsor: IEEE.
Patent Liability Analysis -Krithika Iyer Autonomous Rescue Vehicle Ruiyang Lin Vipul Bhat Julia Liston Krithika Iyer.
Mid-Semester Presentation Design II March 4, 2014.
Maze Twinbots Group 28 Uyen Nguyen – EE Ly Nguyen – EE Luke Ireland - EE.
Team 3 Ashwin Shankar Upsham Dawra Samit Sura Joe Katz.
Wall-E Prototype I TCSP #8 Safety and Reliability Analysis Team 1 Xin Jin Ranmin Chen Hang Xie Zelun Tie.
ECE 477 FINAL PRESENTATION TEAM 6  SPRING OUTLINE  Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration.
Maze Twinbots Group 28 Uyen Nguyen – EE Ly Nguyen – EE Luke Ireland - EE.
Team01: Zelun Tie The design project Wall-E Prototype I is an intelligent automated trash collecting robot with obstacle detection capability. The robot.
Team 6. Guitar Audio Amplifier Audio Codec DSP Wireless Adapter Motor Array PC LCD Display LED Arrays Pushbutton or RPG Input Device
ECE 477 Final Presentation Team 01  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
CONTENTS Objective Software &Hardware requirements Block diagram Mems technology Implementation Applications &Advantages Future scope Conclusion References.
We thank the Office of Research and Sponsored Programs for supporting this research, and Learning & Technology Services for printing this poster. Fully-Autonomous.
Electric Air Ukulele Ivan Setiawan (setiawa2) Satyo Iswara (iswara2) ECE 445 Senior Design Spring 2012 Team #32 TA: Jane Tu.
Team 01 : QuadSquad Software Design Considerations Camille Chang 10/23/2013 the ECE quadcopter senior design Purdue University1.
RECON ROBOT ECE 477 Group 8 Vinit Bhamburdekar Arjun Bajaj Aabhas Sharma Abhinav Valluru.
Components of Mechatronic Systems AUE 425 Week 2 Kerem ALTUN October 3, 2016.
Autonomous Rescue Vehicle ( Team 10 )
Autonomous Rescue Vehicle (Team 10)
<Add team picture or relevant project picture here>
Design Constraint Andrew Kasha
Autonomous Rescue Vehicle (Team 10)
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Final Presentation Team 10  Spring 2008
Manual Robotics ..
ECE 477 Final Presentation Group 10  Spring 2005
Presentation transcript:

A UTONOMOUS R ESCUE V EHICLE (T EAM 10) Team members: Julia Liston, Vipul Bhat, Krithika Iyer, Ruiyang Lin

P ROJECT O VERVIEW Our team’s goal is to build a prototype of a robot that can: Use GPS to locate a lost person Autonomously navigate towards the person Lead him or her back to a safe location, which is the starting location of the robot

PSSC S An ability to move and steer using appropriate motors and drive systems An ability to transmit GPS coordinates from the rescue-point transceiver to the robot via an RF module An ability to receive and process GPS coordinates on the robot and move toward the given coordinates An ability to detect obstacles and navigate around them using ultrasonic sensors. An ability to monitor the battery level of the robot

B LOCK D IAGRAM

B LOCK D IAGRAM ( CONTINUED ) +3.3 V Power Supply Module Microcontroller RF Transmitter Module (Xbee Pro) GPS Module UART (9 bit) PWR _CTR Rescue-Point Transceiver

C OMPONENT S ELECTION

C OMPONENT S ELECTION (C ONTINUED ) Microcontroller 2 PWM 2 UART Minimum 4 ATD Minimum 14 digital I/O pins Fast to handle data input (At least 32-bit preferably, with CPU at least 50MHz) 3.3 V operating voltage Final choice: PIC32MX120F032B for Robot and for the rescue point transceiver.

C OMPONENT S ELECTION (C ONTINUED ) Motors Enough torque to handle rugged terrain Steady state current relatively low to reduce power Built-in gear box to simplify design Chose: Dagu 25D Motor with 34:1 Gearbox GPS receiver Accurate locating capability Relatively inexpensive Communicate through UART Chose: ADH Technology - GPS RF module Long range communication (6 miles) Conform to FCC requirements Chose: Digi International Inc - XBP09-DPSIT-156

C OMPONENT S ELECTION (C ONTINUED ) Ultrasonic Sensors: Easy to use ATD High Resolution Cost-effective Chose: Maxbotix LV-EZ4 H Bridge Delivers up to 5 A continuous Low turn-on resistance Built-in circuit protection Chose: TLE5206

P ACKAGING Constraints Traverse rugged terrain Lightweight and Sturdy Room for PCB and off chip peripherals Minimize cost Looks cool

P ACKAGING (C ONTINUED ) Batteries PCB Ultrasonic Sensors GPS

P ACKAGING (C ONTINUED ) Rescue-Point Transceiver

S CHEMATICS (R OBOT )

S CHEMATICS (T RANSCEIVER )

PCB L AYOUT (R OBOT )

PCB L AYOUT (T RANSCEIVER )

PCB L AYOUT (M ICROCONTROLLER ) RobotTransceiver

PCB L AYOUT (T RANSCEIVER P OWER S UPPLY ) 3.3 VoltGround

PCB L AYOUT (R OBOT P OWER S UPPLY ) 3.3 Volt

PCB L AYOUT (R OBOT P OWER S UPPLY ) -3.3V

PCB L AYOUT (R OBOT P OWER S UPPLY ) Digital Ground

PCB L AYOUT (R OBOT P OWER S UPPLY ) 7.2Volt

PCB L AYOUT (R OBOT P OWER S UPPLY ) Motor Ground

P RELIMINARY S OFTWARE D ESIGN Completed testing: Can transmit and receive with UART ATD PWM – Motor control Timing modules and interrupts Future design: Motor control Navigation algorithm – ultrasonic sensors Process GPS data Transmit and receive with RF module

T IMELINE Timeline89Spring Break Week1-Mar8-Mar15-Mar22-Mar29-Mar5-Apr12-Apr19-Apr26-Apr Software (Basic subroutines) Ultrasonic RF Module GPS Motor Control IR Software (Debugging with hardware) Debugging Navigation Debugging GPS and RF communication Hardware Proof Final PCB Motor Testing PCB Population & Testing Final packaging Prepare for Final Design Presentation