Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
Third Energy Package for Change of Supplier 2009/73/EC.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Gas emergency cash-out Ofgem perspective Transmission Workstream - 3 July 2008.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
RIIO Gas Transmission Workshop - 5 th Sept Supplementary information 1 Hypothetical examples to illustrate the impact of combining the constraint management.
Review Group -140 Thoughts on additional information requirements.
Capacity trade and transfer mechanism and the next AMSEC auction Bob Hull Director, Transmission 9 May 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Industry Dialogue on xoserve Services 14 th September 2007.
Transfers and Trades Special Transmission Workstream
Force Majeure Existing FM situation: Up to 200GWh/d capacity shortfall due to the rejection of NG’s planning application for a PRI in Corse / Tirley area.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Restricted Invoice Period Criteria Rochelle Hudson.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transmission Planning Code – Draft Document
NTS Entry Charging Review Update
Exit Capacity Substitution and Revision
Background to National Grid’s Baseline analysis
Potential Alternative Proposal – Interaction with Electricity Capacity Market 23 January 2018.
Joint Office Presentation for Modification 0678
Development of Entry Capacity Substitution
Entry Capacity Substitution
Entry Capacity Transfer and Trade
Options for the Development of a Demand Side Response Mechanism
Richard Fairholme E.ON UK
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
Transmission Workstream 1st February 2007
Review Group 221: Review of Questions from Session 2
Presentation transcript:

Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007

2 Outline TPCR Revision of baselines New obligations on NGG as part of TPCR - to introduce mechanisms to transfer and trade capacity Mod 138 decision

3 Potential impact of the Transmission Price Control Review ( ) on the next AMSEC auctions Revision of baselines at a number of entry and exit points Two new obligations on NGG: –to introduce capacity trade mechanism –to introduce capacity transfer mechanism

4 Revision of baselines To reflect physical capacity of the network at peak  whilst assuming relatively high flows at near-by entry points  conservative but realistic view To reduce buyback exposure of consumers compared with the price control arrangements

5 Entry capacity baselines

6 Introduction of two new obligations Introduction of two new obligations to put capacity trade and transfer mechanisms into place The purpose of the new obligation to enable the transfer of capacity is to guard against the risk that capacity is 'sterilised' at an entry point where it is not needed by reducing the obligation at that entry point and making additional capacity available elsewhere The purpose of the new obligation to enable the trade of capacity is to increase the economic and efficient operation of the NTS by increasing the scope for shippers to have access to capacity where they value this most

7 Obligation to introduce capacity transfer mechanism new obligation on NGG to facilitate the transfer of unsold capacity to meet demands for capacity elsewhere upon request and ahead of an auction NGG shall provide a shipper with a rate of transfer that would enable it to buy entry capacity at one point but use it at another the transfer rates would be specific to each individual request

8 Obligation to introduce capacity trade mechanism new obligation on NGG to facilitate the transfer of sold capacity to meet demands for capacity elsewhere upon request and ahead of an auction NGG shall provide shippers with a rate of transfer that would enable shippers to transfer sold capacity between entry points

9 Capacity trade and transfer methodology NGG is required to establish a methodology which would need to be consulted on with interested parties, and approved by Ofgem for calculating trade and transfer rates In calculating these rates it would be reasonable for NGG to factor in any changes in buy back risk as a result of the trade and transfer It is also reasonable for NGG's methodology to result in a zero capacity trade or transfer rate where this reflects genuine physical constraints on the network We expected NGG to submit its proposed methodology to Ofgem by the end of February 2007

10 Ofgem decision on UNC Mod 138 Ofgem decision to reject mod 138 Reasons: The proposal only implements a small subset of the capacity trade mechanism and does not introduce the associated mechanism for the transfer of unsold capacity. Without this mechanism it is unclear that introducing capacity trading on its own will lead to a more efficient and economic operation of the NTS (i.e. does not meet objective (a) the efficient and economic operation of the pipe-line system to which this licence relates) The proposal (introducing a restricted set of trading in a once a year window) would not seem to meet the objectives Ofgem currently anticipates introducing into the licence of NGG in accordance with the TPCR proposals. Although NGG has now produced a draft capacity trade methodology, Ofgem has not yet indicated whether it would be minded to accept this proposed approach. Although the capacity trade methodology is not a necessary prerequisite for a decision in favour of this modification proposal it would be a necessary precondition for the modification proposal to have any effect (i.e. does not meet objective (c) so far as is consistent with sub paragraphs (a) and (b) the efficient discharge of the licensee's obligations under this licence) The proposal introduces a trade mechanism only within the portfolio of a given shipper. Ofgem shares the concerns expressed by some respondents that a restricted mechanism of this sort will have different effects on different shippers (for instance those who already have a diversity portfolio of capacity holdings). Ofgem is therefore concerned that this may unduly distort the competitive market between shippers (i.e. does not meet objective (d) so far as is consistent with sub paragraphs (a) to (c) the securing of effective competition: (i) between relevant shippers; (ii) between relevant suppliers; and/or (iii) between DN operators (who have entered into transportation arrangements with other relevant gas transporters) and relevant shippers)

11