Accelerating Project Delivery California Transportation Commission August 22, 2012 California Department of Transportation  Tab 64.

Slides:



Advertisements
Similar presentations
Oregon Jobs and Transportation Act Section 18
Advertisements

ODOT/OCA Renewed Partnering Initiative
CHANGES IN ENVIRONMENTAL TRAINING PROGRAM AND CONSULTANT PREQUALIFICATION REQUIREMENTS.
Bi-Level Car Procurement Status Report
NEW PROGRAMMATIC CATEGORICAL EXCLUSION AGREEMENT A WORK IN PROGRESS… ODOT—Office of Environmental Services Environmental Update Meeting20 November 2014.
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
Design Exceptions and Risk Management (Tab 6). Roles and Responsibilities 2Design Exceptions and Risk Management At the end of this module, participants.
Kings County as part of the San Joaquin Valley Blueprint County Planning & LAFCO engaging the COG’s Blueprint efforts to map out the County’s future. Greg.
JTA Section 18 Implementation Update Ken Franklin Geo-Environmental ODOT 28 April 2011.
Moving Ahead for Progress in the 21 st Century (MAP-21) – ROW Impacts Dianna Nausley, HQ RES Assistant Program Administrator Washington State Department.
Devil’s Slide Tunnel Project: Home of the California red-legged frog Richard Vonarb District 4 Office of Biological Science and Permitting California Department.
Innovative Contracting Construction Management Association of America Seminar May 17, 2013 California Department of Transportation.
BROADBAND DEPLOYMENT OPPORTUNITIES The Project Delivery Process Malcolm Dougherty District 6 Director.
The America’s Cup in San Francisco. Event Partners City & County of San Francisco – CEQA/NEPA, Permits, Implementation Plans America’s Cup Event Authority.
Selection Processes and Administrative Qualification
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
California Department of Transportation District 11 - Internship Angela Inciong- SDSU Civil Engineer Tamina Akram- SDSU Civil Engineer.
Overview of the Federal Aid Process for Transportation Projects.
Drought and the Central Valley Project August 2014.
CALTRANS WIRELESS LICENSING PROGRAM Bimla G. Rhinehart Division of Right of Way and Land Surveys.
Value Engineering. Definition Value Engineering (VE) is defined as a systematic process of review and analysis of a project, during the concept and design.
Wisconsin DOT EDC Initiatives Rory Rhinesmith, P.E. Deputy Administrator – DTSD Bureaus.
Water Resources Development Act WRDA 214 Joy Keniston-Longrie City of Seattle Pacific Northwest Waterways Association, (PNWA) October 2008 US Army Corps.
MANAGING ENGINEERING & TECHNOLOGY By Doug Wesselschmidt, PE.
FHWA Update WASHTO Construction and Materials Conference Portland, Oregon April 8, 2008.
Project Delivery Selection Approach Keith R. Molenaar, PhD CDOT CM/GC Workshop Denver, CO February 7, 2012.
Slide 1 Caltrans Bridge Construction Forum 2007 Bidding Process and Construction Environment Brian Mapel FCI Constructors Inc. Jeff Abercrombie California.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Ensuring a desirable workplace which creates a diverse team of all kinds of people and professions. To be a progressive state transportation agency recognized.
FHWA Perspective on Risk and Other Highlights. GROW AMERICA Proposal Administration’s Proposal 6 Years in length $317 billion for highways and bridges.
Conflict of Interest requirements in RFQ. What are some of the common Conflict of Interest Scenarios. How to find out about the conflict of Interest before.
Special Evening Session: The Business of NASA Research August 22, 2006 Evening Session.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
SAFETEA-LU Changes  Exemption of the Interstate System from Section 4(f) [Section 6007]  de minimis impacts to historic sites [Section 6009(a)]  de.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO TCC & CAC Presentation – August 21, 2012.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
FHWA Update Butch Wlaschin, P.E. Director, Office of Asset Management AASHTO Highway Subcommittee on Construction 2010 Annual Meeting Burlington, Vermont.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Planning and Permitting Part II: Permitting Overview S.P. Cramer & Associates, Inc. 636 Hedburg Way, Suite 22 Oakdale, CA
1 Accommodating Utilities in Highway Rights-of-Way Federal Agency Update IRWA/AI Conference Las Vegas, NV January 13, 2009.
Project Planning and Progress August 2, 2011 Michelle Page | Design Build Engineer.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE XYZ STATE 1.
BDCP, Interfacing with Conservation Plans Habitat Conservation Planning from Tahoe to the Bay 7 th Annual Workshop November 18, 2009 Carl Wilcox California.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
Santa Clara Valley Habitat Plan David Zippin, Ph.D. ICF International David Zippin, Ph.D. ICF International Overview and Lessons Learned Overview and Lessons.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
State Safety Inspections and Sponsor Expectations.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
STANDING COMMITTEE ON HIGHWAYS BUSINESS MEETING FHWA Updates Walter C. Waidelich, Jr. Associate Administrator for Infrastructure May 29, 2014.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
DESIGN-BUILD DEMONSTRATION PROGRAM California Department of Transportation District 4 Calmentor Meeting January 27, 2011 Presented by:Joseph Dongo Presented.
25 th Annual Transit Conference April 23, 2012 We Need Each Other.
Metric to English Conversion California Bridge Construction Forum March 8, 2006 Mark Leja, Chief, Division of Design California Department of Transportation.
5 Minute Drought Update Mike Orbon Environmental Health Public Water Supply Section
Construction Manager/General Contractor Pilot Program Construction Management Association of America February 18, 2016 California Department of Transportation.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
American job center branding for the next generation workforce system
Lions, Tigers, Coast Guard Permits – Oh My!
Operations Management
2013 Nevada Transportation Conference
FWC Updates for 2018 (so far…)
ACEC Bobby Lewis August 2017.
Brackish Water Desalination Project
Definitions EPC EPCM Design/Build Contract Lump Sum
Right of Way Certification
FHWA Update AASHTO Committee on Construction August 12, 2019
Presentation transcript:

Accelerating Project Delivery California Transportation Commission August 22, 2012 California Department of Transportation  Tab 64

State Contract Act Requirements  Emergency  Allows for waiving or postponing certain requirements  Paramount Bridge replacement is an example  Non-emergency  Working within the requirements, acceleration is still possible.

Project Delivery Acceleration Toolbox  Developed by Caltrans  Describes options to accelerate project delivery  Initiated in 2002 and updated regularly  To date, 169 improvements identified  Includes:  Training for Project Managers and Engineers  Standardized processes or forms  Project Development and Contracting

Project Development Phase  NEPA Delegation  Permit Engineering Evaluation Report (PEER)  Project Agreement Construction Tool (PACT)  Programmatic Agreements  106 Agreement with SHPO  Biological Opinions with US Fish & Wildlife Service (Giant Garter Snake, Red-legged Frog, San Joaquin Kit Fox, Desert Tortoise, etc.)

Innovative Construction Contract Tools  Construction Partnering  Cost + Time (A+B) Contracting  Incentives/Disincentives  Smart (Flexible) Start  Accelerated Bridge Construction

Merging Design and Construction  Pilots In Progress  Design-Sequencing  Design-Build

Upcoming Opportunities  Construction Manager/General Contractor  Job Order Contracting  Terrestrial Laser Scanning (Surveys)  3D Constructability reviews  Conflict Detection  Machine Guidance  Map - 21