Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo,

Slides:



Advertisements
Similar presentations
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Advertisements

1 ATST Imager and Slit Viewer Optics Ming Liang. 2 Optical layout of the telescope, relay optics, beam reducer and imager. Optical Layouts.
Área de Instrumentación NAHUAL Mechanical Concept Current Status F. Javier Fuentes Instituto de Astrofísica de Canarias September
NGAO Calibration/Simulation Source T. Stalcup, M. Pollard.
IRSIS : Preliminary Fiber bundle design Original datas : Fiber focal plane of F/5,5 telescope primary focal plane - TBC Telescope FOV : 15’x15’
VLBI: Visible Light Broadband Imager Instrument Conceptual Design Presentation Tom Berger Lockheed Martin Solar and Astrophysics Lab.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
Wide-field, triple spectrograph with R=5000 for a fast 22 m telescope Roger Angel, Steward Observatory 1 st draft, December 4, 2002 Summary This wide-field,
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
KMOS Instrument Science Team Review Instrument overview.
Optical Design for an Infrared Multi-Object Spectrometer R. Winsor, J.W. MacKenty, M. Stiavelli Space Telescope Science Institute M. Greenhouse, E. Mentzell,
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
D EDICATED S PECTROPHOTOMETER F OR L OCALIZED T RANSMITTANCE A ND R EFLECTANCE M EASUREMENTS Laetitia ABEL-TIBERINI, Frédéric LEMARQUIS, Michel LEQUIME.
August 2 and 3, 2010 KOSMOS Design Considerations Jay Elias.
SPECTROSCOPIC DIAGNOSTIC COMPLEX FOR STUDYING PULSED TOKAMAK PLASMA Yu. Golubovskii, Yu. Ionikh, A. Mestchanov, V. Milenin, I. Porokhova, N. Timofeev Saint-Petersburg.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
B.Delabre November 2003ANGRA DOS REIS - BRAZIL ESO 2 nd GENERATION INSTRUMENTATION – OPTICAL DESIGNS ESO VLT SECOND GENERATION INSTRUMENTATION Optical.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
High Resolution Echelle Spectrograph for Chinese Weihai 1m Telescope. Leiwang, Yongtian Zhu, Zhongwen Hu Nanjing institute of Astronomical Optics Technology.
Near Infrared Spectro-polarimeter (NIRSP) Conceptual Design Don Mickey Jeff Kuhn Haosheng Lin.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
18 October Observational Astronomy SPECTROSCOPY and spectrometers Kitchin, pp
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
Astronomical Spectroscopy Notes from Richard Gray, Appalachian State, and D. J. Schroeder 1974 in “Methods of Experimental Physics, Vol. 12-Part A Optical.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
An IFU for IFOSC on IUCAA 2m Telescope
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
ZTF Optics Design P. Jelinsky ZTF Technical Meeting 1.
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
DECam Daily Flatfield Calibration DECam calibration workshop, TAMU April 20 th, 2009 Jean-Philippe Rheault, Texas A&M University.
KMOS Instrument Overview & Data Processing Richard Davies Max Planck Institute for Extraterrestrial Physics  What does KMOS do?  When will it do it?
The Prime Focus Imaging Spectrograph Design and Capabilities
20 OCT 2003SOLAR ORBITER MEETING1 Optical Design Activities at RAL Kevin Middleton Optical Systems Group Space Science & Technology Dep’t. Rutherford Appleton.
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
A global approach to ELT instrument developments J.-G. Cuby for the French ELT WG.
Engineering Division 1 M321/M331 Mirror Switchyard Design Review Tom Miller
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Solar orbiter_______________________________________________.
Mechanical design meeting, IAG, Calibration Unit mechanical design Svend M. Bauer Andreas Kelz, Emil Popow, Martin M. Roth.
ZTF Optics Design ZTF Technical Meeting 1.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
Astronomical Observational Techniques and Instrumentation
Visible Spectro-polarimeter (ViSP) Conceptual Design David Elmore HAO/NCAR
Introduction NICMOS (Near-Infrared Camera and Multi-Object Spectroscopy) was installed on the Hubble Space Telescope during SM2 in 1997 and has been the.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Observations with AMBER  General overview  P2VM  OB preparation with P2PP P2PP / OB / templates Available templates for observation procedure Typical.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
STC "VOSKHOD", PROJECT "SPECTR-UV", JUNE 2006 Next slide Next slide Previous slide Possible layouts of Field Cameras.
“Phase C” Design of the JWST/FGS Tunable Filter Imager TIPS/JIM June 15, 2006 Alex Fullerton STScI / UVic.
06 Oct 05Space Science & Technology Dept1 Solar Orbiter Consortium Meeting 03 Mar 06 Optical Design Of Solar Orbiter Normal Incidence Spectrometer KF Middleton.
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
1 BROOKHAVEN SCIENCE ASSOCIATES Vibrations effect on 1nm focussing K. Evans-Lutterodt NSLS-II VTG Januaury
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
3 rd March 2006EUS Consortium meeting EUS Instrument Overview Eric Sawyer RAL.
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
Digital Light Sources First introduced in 2001.
KOSMOS Design Considerations
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
An IFU slicer spectrometer for SNAP
Intra-pixel Sensitivity Testing Preliminary Design Review
Chapter 35-Diffraction Chapter 35 opener. Parallel coherent light from a laser, which acts as nearly a point source, illuminates these shears. Instead.
Detective Quantum Efficiency Preliminary Design Review
FourStar 4K x 4K JHK imager
Astronomical Observational Techniques and Instrumentation
Optics Alan Title, HMI-LMSAL Lead,
Presentation transcript:

Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo, Dublin Institute for Advanced Studies Niall Murphy, Dublin Institute of Technology

NAHUAL Consortium Meeting, Fuerteventura, Sept Overview What is the focal plane layout to be? –Advantages and disadvantages of two concepts. –Packaging, cost, baffles, risk, …. The Acquisition camera Focal plane slit deployment Time scale for funding and effort Funding and effort available in Ireland Delivery schedule

NAHUAL Consortium Meeting, Fuerteventura, Sept Focal plane layout 1 Ideally need as small an entrance window as possible –Must admit 10 arc second field. –Optimal heat rejection: reflecting prolate spheroidal baffle. Stable alignment of feed from telescope to the slit in all modes. Stable alignment of acquisition camera to the science instrument. Manufacturing and maintenance cost and complexity.

NAHUAL Consortium Meeting, Fuerteventura, Sept Focal plane layout 2 Current design has two paths to the slit. The four fold mirrors must pass the 10 second field in both directions. We lose 50mm of space between the telescope and the focal plane. Cannot fit the acquisition camera into the main cryostat: two cryostats. ADC in double pass to acquisition camera. Illustration of the focal plane layout with both modes.

NAHUAL Consortium Meeting, Fuerteventura, Sept Focal plane layout 3 Small acquisition camera within the main cryostat. Aligned to the science instrument once only. Can be used for alignment of the instrument to the telescope. Window clear aperture ø17mm admits full field of view. ADC used in single pass only. Alternative: no fold mirrors between the window and the slit. (Optical path length between window and slit same as in previous diagram.) Here the optics are folded out of plane of the optical bench (TBC).

NAHUAL Consortium Meeting, Fuerteventura, Sept Focal plane layout 4 Having the acquisition camera within the main cryostat has the following additional advantages: –The gas cell is kept to a minimum diameter. –Higher throughput: 4 mirrors > ~5-7% loss. –Secondary mode stability is greater: both versions have the same slit interchange requirements, –but no moving mirrors: this is critical; the mirrors have pitch, roll and yaw as well as the problem of parking position. This risks degraded secondary mode. –50mm extra space between telescope and instrument and grating 100mm further forward => smaller cryostat.

NAHUAL Consortium Meeting, Fuerteventura, Sept Focal plane layout 5 –No secondary cryostat: cost and maintenance saving. –Alignment of camera to main optics is done once – at assembly, and remains fixed. –ADC used in single pass: smaller prisms. Also the acquisition camera sees the same aberration as slit. Potential risk to main mode needs to be considered – see later slide. –If secondary mode is unstable, both methods have the same fall-back to main mode only operation.

NAHUAL Consortium Meeting, Fuerteventura, Sept Acquisition camera 1 Provisional design based around NICMOS InGaTe detector –Operating temperature 70K –Detector size 256 x 256 pixels –Pixel size 40 microns –Plate scale mm per arc second, pixel scale arc seconds per pixel –Image space F# –Field of view 10” X 10” –Wavelength range 1.0 to 2.5 microns –Total mass of glass ~12 g (fold mirror not included)‏

NAHUAL Consortium Meeting, Fuerteventura, Sept Acquisition camera 2

NAHUAL Consortium Meeting, Fuerteventura, Sept Acquisition camera 3

NAHUAL Consortium Meeting, Fuerteventura, Sept Acquisition camera 4

NAHUAL Consortium Meeting, Fuerteventura, Sept Acquisition camera 5 Bounding square is one pixel.

NAHUAL Consortium Meeting, Fuerteventura, Sept Acquisition camera 6 The design is only provisional –If the location of the camera is to be outside the main cryostat it will have to change completely. –If inside the main cryostat the packaging constraints may force changes – work with the mechanical engineers and cryostat designers. –A change in the choice of the detector will force a change in the design, but only in detail. Need to know if a filter wheel is required. –Filters would need to be of ø 10mm. –How many would be needed?

NAHUAL Consortium Meeting, Fuerteventura, Sept Acquisition camera 7 Basic concept for the mounting is –Mount off the main optical bench, but on G10 truss. –Cold strap directly to the cold bath: no thermal contact with the optical bench. Must have a fixed optical design before any mechanical design work is started –The exact configuration (folding, mounting etc) can change, but not the optics or the detector. –Could design in a filter wheel that is never fitted, just build in a compensation plate.

NAHUAL Consortium Meeting, Fuerteventura, Sept Focal plane slit deployment 1 We are proposing to design, build and test a slit deployment wheel. Provisional specification: –Six slits and pinholes. –Repeatability ± 0.1µm spectral direction, 3 µm spatial. –Stability: spectral ~± 0.1 (1.0) µm, and for pinholes needs to be ~± 0.1µm (?) spatial. (Compare this with 1/(plate scale) = 824 µm per arc second.)‏ –These are of the of the order 1 milliradian at the axle. 1/1000 (1/100) pixels in the spectral direction on the science detector.

NAHUAL Consortium Meeting, Fuerteventura, Sept Focal plane slit deployment 2 How do you test a wheel for 0.1 µm tolerances? Method 1 –Use capacitive sensors: commercially available with resolutions down to 2 nm. We need ~50 nm. –Preliminary testing warm, then proof of conformance to specification in a test cryostat. –Monitor long period stability (hours). Method 2 –Direct observation for repeatability tests. Lambertian illumination of pinhole and microscope type setup, CCD and image processing. Both methods are non-contact.

NAHUAL Consortium Meeting, Fuerteventura, Sept Focal plane slit deployment 3 Drive mechanism to be decided by test: –either a stepper motor with no holding current, ideally no gearing. Requires a datum, –or modified Geneva mechanism. No datum required. Use the acquisition camera and calibration source to ensure that the correct slit is deployed –but would not have resolution required for check on accuracy etc. Can use science detector for that. No holding current and minimal heat generation when deploying a slit is important. Must not require encoding.

NAHUAL Consortium Meeting, Fuerteventura, Sept Funding and available effort 1 We have received €38K funding for a full-time postgraduate student to work on the mechanical engineering of the acquisition camera and focal plane mechanisms – subject to need. –Supervised by Tully Peacocke (optics/opto- mechanics) Niall Murphy (mechanical engineering and testing) Carlos del Burgo (advisory supervisor). –Supported by the design, manufacture and test facilities and staff of DIT. –Starts October 2008 for two years. Optical design effort available – T. Peacocke.

NAHUAL Consortium Meeting, Fuerteventura, Sept Funding and available effort 2 Need to decide what work is to be undertaken, and when. –Is the current layout fixed? –If so, we need to be told what is to be done because none of our proposals are valid. New design for the acquisition camera: must be done quickly. No design work on the focal plane layout and mechanisms. Guidance, specification and interface control documentation must be provided by the system engineer before we can do anything.

NAHUAL Consortium Meeting, Fuerteventura, Sept Time scale for funding and effort We have two years to design, build and deliver the acquisition camera opto-mechanics, and the slit deployment mechanism, if that is required: –Start date October –After Sept we cannot be certain that there will be funding to continue mechanical engineering work. We can start on generic lens mount design and cryogenic testing, and slit wheel design and testing, but by Jan we will need to have started on the real system. Otherwise effort will be lost permanently.

NAHUAL Consortium Meeting, Fuerteventura, Sept Delivery schedule proposal We have proposed that there is a two phase approach to the delivery of the project: –Phase 1: main mode only The aim is to ensure that the time-line to main mode operation is as short as possible with minimum risk – no moving parts => no single point mechanical failure risk. –Phase 2: Integration of secondary modes during a scheduled instrument service/warm-up. Install a thoroughly tested slit exchange mechanism, any prisms, etc, etc. Having obtained science grade data in Phase 1 we can observe any effects due to mechanisms introduced in Phase 2.