NFPA 70E Update for ASTM F18 ASTM F18 Representatives for the NFPA 70E TC Allen Bingham, Primary Member Tom Rege, Alternate Member Tom Neal, 2nd Alternate/Proxie.

Slides:



Advertisements
Similar presentations
Standards Development: An Overview
Advertisements

Subcontractor Electrical Safety & NFPA 70E
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Pre-University Education Coordinating Committee Arthur Winston, Chair PECC 15 November 2008 New Brunswick, NJ.
Doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, November Date: Author:
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES September.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission EC Update on LMSC Governance Date: November 16 th, 2009 Author: Matthew Sherman 1 st Vice Chair,
1 Standards Development: An Overview Discovery to Delivery Topic Committee Meeting October 30, 2007 Karen A. Wetzel NISO Standards Program Manager
Business Practices Subcommittee Update August 17, 2010.
1 OAS Financial Management Challenges and Program- Budget Implications 1 SECRETARIAT FOR ADMINISTRATION AND FINANCE October 2008.
Starting Planning for the 2010 Policy Key Issues Notes for the TAC Executive Committee April 8, 2009 Phil Hattis, AIAA VP for Public Policy.
Process for Developing and Approving WECC Regional Criteria Preschedule Process Regional Criteria Drafting Team Meeting Conference Call - Webinar October.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee July 29, 2009 Loveland, Colorado.
Tutorial for leadership teams of ITU-T study groups, TSAG, tariff groups and focus groups Alternative approval process (AAP) for ITU-T Recommendations.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
August 28, 2009 Federal Emergency Management Agency Public Assistance Arbitration Process.
3/2/ STANLEY LIGAS, et al. v. JULIE HAMOS, et al. First Annual Report of the Monitor September 27, 2012 Tony Records, Monitor
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Richmond House, Liverpool (1) 26 th January 2004.
1 AIC – Conference Montreal – May Standards Update CUSPAP, IVS & IFRS Ray Bower, AACI Louis Poirier, AACI.
Presentation of the proposed Annex 19 – Safety Management
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
© WRI & WBCSD, 2010 Metropolitan Washington Council of Governments (COG) Recycling Committee Meeting March 18, 2010 Greenhouse Gas Protocol Product/Supply.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
W. Shannon Black Manager, Standards Processes Results Based Drafting 2013.
IEEE f Active RFID System Sponsor Ballot Ballot Resolution Committee Teleconference Meeting August 31, 2011 Mike McInnis Chair IEEE f.
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
Doc.: IEEE /0564r0 Submission May 2014 Marc Emmelmann, SelfSlide 1 Results of LB 201 on TGai D2.0 Date: Authors:
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Weekly Attendance by Class w/e 6 th September 2013.
Revision of WIPO Standard ST.14 Committee on WIPO Standards, third session Geneva 15 – 19 April 2013 Anna Graschenkova Standards Section.
1 Revision of ISSAI 30 – Code of Ethics Project proposal to the Steering Committee of the INTOSAI Professional Standards Committee Bahrain, May 2014.
African Aviation Training Organization
IMSA Dedicated to providing quality certification programs for the safe installation, operation and maintenance of public safety systems; delivering value.
4/25/20151 The Code-Making Process National Electrical Contractors Association.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
FCIA CODE EFFORTS FCIA Spring Conference 2003 By William E. Koffel, P.E. Koffel Associates, Inc.
Code Comparison Changes 2012 IBC to 2012 NPFA 101 Developed for the Florida Department of Business And Professional Regulation Building Codes and Standards.
Mark W. Earley, P.E. Chief Electrical Engineer.  Also known as the NEC ® or ANSI/NFPA 70  There are two electrical codes that govern electrical installation.
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
E C C National Electrical Code process How did we get from there to here….
Letter of intent By to predefined format (Word file, see guidelines) Chair Scientific Committee Coordination EO To all members of.
 Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image.
11/24/20151 Guidelines for NECA CMP Representatives National Electrical Contractors Association.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
ICC Industry Advisory Committee Purpose and Scope The purpose of the Industry Advisory Committee (IAC) is to promote, in cooperation with the International.
API 19 CI Chemical Injection Devices for Downhole Applications
Task Group API 19SS Sand Screens
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
Understanding and Getting More From The NFPA Process
IEEE MEDIA INDEPENDENT HANDOVER
The Code-Making Process
Presentation transcript:

NFPA 70E Update for ASTM F18 ASTM F18 Representatives for the NFPA 70E TC Allen Bingham, Primary Member Tom Rege, Alternate Member Tom Neal, 2nd Alternate/Proxie Marcia Eblen, 3rd Alternate/Proxie Global leader in developing, distributing and ensuring compliance to standards for over 82 years. Recognized certifier of products to Canadian, U.S. and International standards. Issuer of product approval marks – which appear on over 1 billion products globally. Registrar to international management system standards, including ISO 9001 (quality) and ISO 14001 (environment). 3 Operating Divisions: Canadian Standards Association – standards development arm QMI – provides management system registration (ISO 9000) CSA International – offers certification & testing services

SC2 Report on NFPA 70E ROP Meeting NFPA 70E Technical Committee completed their ROP meeting (Report on Proposals) January 16-20, 2007 in Hilton Head, SC NFPA 70E TC needed to address 579 proposals for revisions to the 70E standard Approx. 260 proposals were addressed by five Task Groups—the TG proposed actions for these were accepted w/o TC review The remaining ~320 proposals were addressed by the full 70E TC Global leader in developing, distributing and ensuring compliance to standards for over 82 years. Recognized certifier of products to Canadian, U.S. and International standards. Issuer of product approval marks – which appear on over 1 billion products globally. Registrar to international management system standards, including ISO 9001 (quality) and ISO 14001 (environment). 3 Operating Divisions: Canadian Standards Association – standards development arm QMI – provides management system registration (ISO 9000) CSA International – offers certification & testing services

NFPA 70E committee actions on 579 proposals 177 Accepted NFPA 70E ROP Meeting, cont. NFPA 70E committee actions on 579 proposals 177 Accepted 146 Accepted in Principal 15 Accepted in Part 35 Accepted in Principal and Part 206 Rejected Global leader in developing, distributing and ensuring compliance to standards for over 82 years. Recognized certifier of products to Canadian, U.S. and International standards. Issuer of product approval marks – which appear on over 1 billion products globally. Registrar to international management system standards, including ISO 9001 (quality) and ISO 14001 (environment). 3 Operating Divisions: Canadian Standards Association – standards development arm QMI – provides management system registration (ISO 9000) CSA International – offers certification & testing services

NFPA 70E Technical Committee Voting Process NFPA 70E ROP Meeting, cont. NFPA 70E Technical Committee Voting Process At the ROP meeting, a simple majority was needed to approve a proposed Committee Action. On the paper ballot, a two thirds majority is needed to approve a proposed Committee Action The initial paper ballot and the re-circulation ballot were completed in March The Technical Coordinating Committee has or will do a review of the ballot results Global leader in developing, distributing and ensuring compliance to standards for over 82 years. Recognized certifier of products to Canadian, U.S. and International standards. Issuer of product approval marks – which appear on over 1 billion products globally. Registrar to international management system standards, including ISO 9001 (quality) and ISO 14001 (environment). 3 Operating Divisions: Canadian Standards Association – standards development arm QMI – provides management system registration (ISO 9000) CSA International – offers certification & testing services

NFPA 70E ROP Meeting, cont. Most contentious proposals related to Scope section 90.1(B) regarding the exclusion of installations for ships/watercraft, mining, railways, communications and utilities. Voting at the meeting on proposals 7, 9, 10, 12, 13 and 14 was fairly close, i.e. 11 to 7 and 10 to 7 for eliminating all these exclusions. They were approved with a simple majority at the ROP meeting, sustained in initial ballot but the utility exclusion was retained in the re-circulation ballot.

NFPA 70E ROP Meeting, cont. The NFPA 70E Chair formed the “Word and Phrase” Task Group to address the need for consistency in the use of the terms “live parts” and “exposed live parts” and “working on or near”

NFPA 70E ROP Meeting, cont. The Task Group is charged with the following instructions: Consider all affirmative and negative ballot comments in this ROP stage associated with proposal sequence number 70E-244 (log 457g) and others as they relate to the work of this task group. The task group is charged to review how the above mentioned terms are used in defining requirements in all proposals and in the entirety of NFPA 70E Chapters 1, 2, 3, and the proposed Chapter 5. Since Chapter 4 is extracted from the NEC, the words and phrases can be assumed to be used a intended by the NEC. The task group shall consider using the above mentioned terms as used in previous editions of NFPA 70E. The task group shall consider modifications to the above mentioned terms to resolve this issue. The task group shall consider generating one or more new terms to provide clarity to these concepts. Note that this method will require the term be defined. In order to prevent new material from being introduced proposed definitions must be included in an affirmative or negative ballot in the ROP. The task group is charged to resolve this issue. Attempt to use existing terms or “think outside of the box” and develop a solution. The task group shall submit comments with recommendations to solve the problem prior to the comment closing date. If necessary, committee proposals may be developed by the task group.

NFPA 70E ROP Meeting, cont. Occurrences of “on or near” in Chapter 1 and their probable meaning per the context: Limited Approach Boundary Flash Protection Boundary Limited Approach & Flash Protection Boundaries Electrical Hazards Ambiguous 100 – Electrically Safe Work Condition 130.7(C)(10) 110.8 110.1 120.2(D)(2) 110.8(A)(1)   110.8(A) 110.6(C) 130.1(A)(3) 130.1 110.7(B) 130.4 130.1 FPN No. 2 110.7(E) 130.5 110.7(F) 110.8(B) 120.2 130

NFPA 70E ROP Meeting, cont. Next Steps for NFPA 70E Revision Cycle Results of the TC paper ballot—April, 2007 ROP document posted for public comment by June 22, 2007 Public comments close August 31, 2007 ROC “Report on Comments” TC meeting October 1-4, 2007 NFPA 70E ROC posted by February 22, 2008 2009 Edition of NFPA 70E published by October 1, 2008.

Next Steps for ASTM F18.93 NFPA 70E Task Group Review ROP document posted for public comment by June 22, 2007 Develop F18 Public comments for submission by August 31, 2007