APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
NERC Footnote b / 12 – Load Loss
PER
PER Update & Compliance Lessons Learned
FRCC Fall Compliance Workshop October , 2013
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
1 Reliability Coordination (IRO Standards) 2011 System Operator Conferences #3 and #4 September & 20-22, 2011 Nashville/Franklin TN Rocky Williamson.
Gcpud1 CRITICAL INFRASTRUCTURE PROTECTION NERC 1200 CIP CRITICAL INFRASTRUCTURE PROTECTION NERC 1200 CIP
Cyber Security 2005 ERCOT COMPLIANCE ROLLOUT Lane Robinson Reliability Analyst.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
NERC and Regional Efforts to Ensure Reliability Dave Nevius, NERC Sr. VP David Cook, NERC VP & General Counsel Louise McCarren, WECC CEO Don Benjamin,
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
BS Information Systems – University of Redlands BS Information Systems – University of Redlands AS Electronic Technology AS Electronic Technology Project.
Jeffery J. Gust IOWA INDUSTRIAL ENERGY GROUP FALL CONFERENCE Tuesday, October 14, 2014 MidAmerican Energy Company.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Critical Infrastructure Protection Update Christine Hasha CIP Compliance Lead Advisor, ERCOT TAC March 27, 2014.
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Federal Energy Regulatory Commission June Cyber Security and Reliability Standards Regis F. Binder Director, Division of Logistics & Security Federal.
Entity Registration Under EPAct 2005 Public Power Council April 6, 2006 Louise McCarren Chief Executive Officer WECC.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Overview of WECC and Regulatory Structure
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Status Report for Critical Infrastructure Protection Advisory Group
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
Overview of Southern Company Transmission
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Project Cyber Security Order 706 Version 5 CIP Standards Potential to Adversely Impact ERCOT Black Start Capability.
Updated 1/28/2011.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
TOP and BA Responsibilities SPP Wind Workshop May 30, 2013.
Standards Review Subcommittee Update August 17, 2010.
CIP Version 4 The Basics. CIP Version 4- Background Centers around expanded criteria for Critical Assets – FERC thought Risk Based Methodologies used.
Texas Regional Entity Report Mark Henry June 6, 2008.
How the Transmission System Works Really William F. Reinke.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Maryland Public Service Commission 2006 Summer Reliability Status Conference May 16, 2006 Baltimore, MD.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
MOPC Meeting Oct , 2016 Little Rock, AR
Transmission Planning in ERCOT- Overview
ERCOT Technical Advisory Committee June 2, 2005
Phil O’Donnell, Manager Operations and Planning Audits
NERC Cyber Security Standards Pre-Ballot Review
Pacific Power Seismic Preparedness Update
Impacts and Actions Resulting from the August 14, 2003 Blackout
Workshop Session 1: Overview
Workshop Session 1: Overview
Phil O’Donnell, Manager Operations and Planning Audits
Presentation transcript:

APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007

Overview Introduction NERC Functional Responsibilities Documentation and Review of Transmission Operator Function Conclusion

Service Area –Population 222,000 –Size (in square miles) 320 Electric System –Customers 104,853 –Hourly Peak demand 801 MWh –MWh Annual Growth 2.1% Natural Gas –Customers 81,610 –2006 System Sales10,434,889 Dth Water –Customers 78,943 –2005 System Sales 10,015,838,000 Gal Transit –2005 Riders 1,708,824 –Miles of Route 175 Telecommunications (Springnet) –High Level/Commercial Broadband Supplier –Secure Server/Remote Site Backup Service

Transmission System 345 kV Transmission miles –1 Substation –2 Points of Interconnection 161 kV Transmission –74 miles of 161 kV Transmission Circuits –13 Substations –4 Points of Interconnection 69 kV Transmission –90 miles of 69 kV Transmission Circuits –26 Substations

13.2 kV Distribution –1,934 Miles of 13.2 kV Distribution Circuits 1,437 Miles Overhead 497 Miles Underground –31 Distribution Substations Distribution System

City Utilities’ Power System Control Power Generation 5 Generating Sites 450 MW Coal-Fired 367 MW Oil & Gas-Fired 3.2 MW Landfill Gas 14 Generators Transmission & Distribution 40 Substations 208 Miles of Transmission Line 1,934 Miles of Distribution 104,853 Customers Security Coordinator SPP Market Agent TEA Balancing Authority SWPA

City Utilities’ NERC Registered Functions Distribution Provider Generation Owner Generation Operator Load-Serving Entity Purchasing-Selling Entity Resource Planner Transmission Owner Transmission Operator Transmission Planner

Operations - T & D - Maintenance - Testing - Vegetation Management Electric Supply - Dispatch - Generation - Transmission Planning Administration - Information Technology - Cyber Security Finance - Risk Management - Physical Security Board of Public Utilities John Twitty General Manager

Examples of Cross Area Responsibilities Standard EOP — Disturbance Reporting –3. Purpose: Disturbances or unusual occurrences that jeopardize the operation of the Bulk Electric System, or result in system equipment damage or customer interruptions, need to be studied and understood to minimize the likelihood of similar events in the future. –4. Applicability 4.1. Reliability Coordinators Balancing Authorities Transmission Operators Generator Operators Load Serving Entities Regional Reliability Organizations.

Examples of Cross Area Responsibilities Standard FAC — Coordination of Plans for New Facilities –3. Purpose: To avoid adverse impacts on reliability, Generator Owners and Transmission Owners and electricity end-users must meet facility connection and performance requirements. –4. Applicability 4.1. Generator Owner 4.2. Transmission Owner 4.3. Distribution Provider 4.4. Load-Serving Entity 4.5. Transmission Planner 4.6. Planning Authority

Examples of Cross Area Responsibilities Standard IRO — Reliability Coordination — Operations Planning –3. Purpose: Each Reliability Coordinator must conduct next-day reliability analyses for its Reliability Coordinator Area to ensure the Bulk Electric System can be operated reliably in anticipated normal and Contingency conditions. System studies must be conducted to highlight potential interface and other operating limits, including overloaded transmission lines and transformers, voltage and stability limits, etc. Plans must be developed to alleviate System Operating Limit (SOL) and Interconnection Reliability Operating Limit (IROL) violations. –4. Applicability 4.1. Reliability Coordinators 4.2. Balancing Authorities 4.3. Transmission Operators 4.4. Transmission Service Providers 4.5. Transmission Owners 4.6. Generator Owners 4.7. Generator Operators 4.8. Load-Serving Entities

Preparation Late Start –Company organization structure led to fractured approach Attended SPP Compliance Workshop Preparation for SPP and NERC Transmission Operation Audit in 2006 –Developed cross-area team to prepare all documentation Corporate-Wide Standards Review –Critical Assets –Division of Standards

Ongoing Identifying Overlap/Gaps in Standards Management NERC Standards Education Training Program Enhancement

Future Develop job description and hire/transfer new Standards Administrator Select Sr. Manager to oversee and manage CIP Standards Incorporate Corporate-wide Standards, update meetings to ensure compliance without overlap Determining level of compliance

Lessons Learned Start now System Operator certification, training and documentation are essential Internal and external training should be used Identify responsible area(s) for each applicable standard Document, document, document…… Establish formal document management program including management review and approval