Tonga Power Reliability Indicators Review Results and Recommendations Pauline Muscat Consultant October 2013.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

The ISA for Physics What you need to revise.
KPI Familiarisation.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
RPEWG Report Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014 RS Meeting 1.
Rebecca Clayton 16 th November 2005 Building a case for investment.
Assessment of Risk Against Regulator Requirements for Duration of Long Supply Interruptions Mohd Ikhwan Muhammad Ridzuan Dr Sasa Djokic The University.
ICASAS305A Provide Advice to Clients
© Grant Thornton UK LLP. All rights reserved. Review of Sickness Absence Vale of Glamorgan Council Final Report- November 2009.
On-Time Product Delivery COPC - HPCC Best Practices March 2011 Allan Darling Deputy Director NCEP Central Operations Where America’s Climate, Weather,
Quality Function Deployment Quality Function Deployment QFD Vivian Cherie KJ.
Introduction to Systems Analysis and Design
FUTURE IN ENERGY. The biggest co-generation high efficiency power plant in Romania, built in Suceava Investment value: over EUR 90 mil Used fuels: natural.
USC Health and Safety Supervisor Training November 24 th and 25 th, 2011 Health & Safety Refresher PART 3.
Bracknell Forest Council: Evaluation of the Domestic Abuse Perpetrator Service (DAPS) Liz Phillips.
1 Integrating Google Apps for Education to Business English Student Trainees’ On-the-Job Training English Reports Asst.Prof. Phunsuk Kannarik.
System Testing There are several steps in testing the system: –Function testing –Performance testing –Acceptance testing –Installation testing.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Chapter 3: Marketing Intelligence Copyright © 2010 Pearson Education Canada1.
Leading Metric Indicators. Expected Outcomes Understand the difference between performance indicators and measures Why lagging indicators don’t tell the.
SCIENCE FAIR 2009.
Power Quality Control Ing. Jan Šefránek Energetický regulační úřad [Energy Regulatory Office / Czech Republic] Špindlerův Mlýn, 17.
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Assessing Plant Performance for Energy Savings. Today’s discussion Critical foundation for plant assessments – a strategic energy management program Background.
Chapter 3: Software Maintenance Process Omar Meqdadi SE 3860 Lecture 3 Department of Computer Science and Software Engineering University of Wisconsin-Platteville.
Utility Service Quality Regulation in Pennsylvania A Presentation For The NARUC Consumer Affairs Subcommittee September 27, 2005 By Wayne L. Williams,
J A K Douglas UK Session ALPHA2 – Block 4 Barcelona May SETTING OF TARGETS FOR CONTINUITY OF SUPPLY THROUGH BENCHMARKING DOUGLAS J.A.K. and.
26 June 2008 DG REGIO Evaluation Network Meeting Ex-post Evaluation of Cohesion Policy Programmes co-financed by the European Fund for Regional.
Successfully recording Continuing Professional Development.
Interactive Training Skills: Evaluation Study Executive Summary Presentation Service Merchandise Company Date: Wednesday, April 6, 2011 CONFIDENTIAL Consultants:
OHTO -99 SOFTWARE ENGINEERING “SOFTWARE PRODUCT QUALITY” Today: - Software quality - Quality Components - ”Good” software properties.
IAEC Reliability Webinar Presented by: Regi Goodale and Ethan Hohenadel December 11,
Introduction – Addressing Business Challenges Microsoft® Business Intelligence Solutions.
D1.HRD.CL9.06 D1.HHR.CL8.07 D2.TRD.CL8.09 Slide 1.
Publication / Fit for Purpose Kirsty Anderson Principal Information Analyst.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Using Client Satisfaction Surveys as a Quality Improvement Tool.
Outage Communication – Improving the Flow of Information Presented at the EEI Transmission, Distribution, and Metering Conference Tucson, Arizona October.
1. OPERATIONS EXPERT Provides area manager/ franchisee with practical recommendations and support to improve the efficiency of daily operations 1. Has.
Chapter 10 Verification and Validation of Simulation Models
What exactly are Key Performance Indicators? Created by Federico Viola.
SCIENCE FAIR 2010.
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
Strategic Plan Development Using KPIs to Develop the Strategic Plan.
IAD 2263: System Analysis and Design Chapter 3: Investigating System Requirements.
1 UFE Workshop Sponsored by COPS October 19, 2004.
The Research Process.  There are 8 stages to the research process.  Each stage is important, but some hold more significance than others.
Operational Excellence in Distribution – Project Contractors Meeting 28 th October 2015.
Management 2020 The Commission on the Future of Management and Leadership July 2014 Management 2020, CMI, July 2014.
Dr. W. H. Wellssow, © i d s GmbH EttlingenMai 2003 CIRED Round Table 5 Fault Statistics in Distribution Networks Dr. W.H. Wellssow IDS GmbH Ettlingen,
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
MicroLoan Foundation: Creating balanced staff incentives Daniella Hawkins, Social Performance Manager.
Plan Waste Assessment MWM01A. What is the purpose of a waste assessment?  The main aims of a waste assessment are to:  Identify each waste stream on.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
P ERFORMANCE S TANDARDS IN D ISTRIBUTION S YSTEM & E FFECTIVE DISTRIBUTION MANAGEMENT USING SMART GRIDS Group-3: Aditya -03 Ambuj -05 Deepak - 15 Kinshuk.
Distribution systems basic techniques and radial networks.
CIRED presentation Improving Quality of Service – Information and Incentives in the GB Electricity Industry Alan Friday (ERA Technology Ltd), Chris Watts.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Quality Management Checklist An essential guide to assist you, the quality expert, in enforcing the standards you expect on a daily basis across the whole.
CRICOS No J a university for the world real R Aging Equipment Replacement in Power Systems, Using Reliability and Cost Considerations By Dr. Ghavam.
Organisation Control KPI’s & an industry Review
An-Najah National University
Chapter 10 Verification and Validation of Simulation Models
MIS5101: Business Intelligence Outcomes Measurement and Data Quality
4H Short Interval Control
Performance Monitoring
KPI Familiarisation
Organisational NRW Management
ISDS Service Support Performance – May 2019
Presentation transcript:

Tonga Power Reliability Indicators Review Results and Recommendations Pauline Muscat Consultant October 2013

Objective  Review historical outage data and develop suitable reliability indicator targets

Methodology  Review last 12 months outage data  Investigate and evaluate data measurement, collection and analysis processes, to identify any issues  Wide consultation with staff at all levels  Review reporting calculations and functions  Data set refinement as required  Conduct training for Fault Operator, Fault Repair and Generation staff, in accurate data collection and purpose in company performance  Analysed data  Developed targets  Recommendations

Issues - Technical  Calculation for indicators was using LV  Number of customers in network has grown, needed update  Date/time anomaly in FileMaker resulting in escalated results  Incomplete outage records; no finish time, customers affected  Incorrect outage records; HV outage, no of customers = 0 etc, incorrect Fault type selected  Discrepancies between Generation and Distribution records  Incomplete table of number of customers on each transformer

Issues – Non-technical  Lack of team work across departments; Departments focused only on their own functions  Lack of understanding of importance of accurate data collection amongst staff  Improvement observed in Fault Operator entries over past months, not recognised or rewarded  Despondent fault entry staff due to feeling they had been kept as trainees for too long (over 18 mths)  Lack of training for Fault Response staff

Data Validation  Removed LV outages from SAIDI, SAIFI calculation  Corrected for duration anomaly  Updated number of customers in network (to 15,432)  Completed records that had been left incomplete  Reviewed suspect or invalid records, especially customers affected  Cross checked data against Generation log book  Validated average outage durations by expert review  Checked against reported results in other Pacific utilities  Resulted in overall 20% reduction in reported SAIDI.

Data Analysis  Compared old data and adjusted/corrected data and predicted SAIDI improvement 20% by addressing issues with data  Actual improvement after corrections was 20%  Reviewed Data for SAIDI,SAIFI,CAIDI; cumulative yearly and mthly  Reviewed breakdown of indicators between Gen and HV  Reviewed outages for Gen and HV

Results  SAIDI  Outages  SAIFI  CAIDI

Data Correction 1423 min/cust/yr

SAIDI

Av: 91.0 min/cust/mth

Gen Av: 50.4 min/cust

1273 min

79.2 min/mth

Targets  1 Common KPI Target for all to work together to achieve  Target: 5% Improvement on SAIDI, SAIFI, CAIDI  Company wide communication and involvement and reward  Yearly Goal, Reported and Calculated Monthly  Excludes extreme weather events  Continued improved data recording and reporting

Av 91.0 min/cust/mth Target: 86.5 min/cust/mth Target: 1082 min/cust/yr Total: 1138 min/cust/yr

Target: 1082 m/cust/yr Total: 1138 m/cust/yr Av 1.2 int/cust/mth Target: 1.1 int/cust/mth Total 15 interruptions/cust/mth Target: 14 int/cust/mth

Av 79.2 min/mth Target: 75.3 min/mth Total 918 min Target: 826 min

PPA Benchmarking SAIDI

Any Questions? PPA Benchmarking SAIDI

Any Questions? PPA Benchmarking SAIDI

PPA Benchmarking SAIFI

Recommendations  Extend work to cover outer islands. Reliability indicators will likely improve by incorporating more customers.  Analyse fault response times and LV outages and develop targets  Unify all Tonga Power workers by setting a common set of KPI targets (eg SAIDI, SAIFI, CAIDI), with bonus payments for achieving targets.  Company wide communication and involvement and reward will instill ownership and encourage co-operation and support across department.  Continued improvement in data measurement, collection and analysis  Reinforce and continue training