1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

Doc.: IEEE 802.EC-10/0015r0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Proposal Date: Authors:
Doc.: IEEE 802.EC-10/xxxxr0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Date: Authors:
Standards Review Subcommittee Update October 27, 2009.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
NERC/GADS Reporting Requirements John Yale Hydro Plant Engineering Manager Chelan County PUD 1.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
NERC Reliability Standards - Development Process: Involvement & Needs Presentation to MOSC January 14, 2004 Khaqan Khan Independent Electricity Market.
Market Operations Standing Committee of the IMO Market Operations Standing Committee September 22, 2003.
Standards Review Subcommittee Update August 17, 2010.
Joint Electric Scheduling Subcommittee Update October 29, 2013.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
NERC Project PRC-005 FERC Order No. 803 Directive ​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 November 12, 2015.
Business Practices Subcommittee Update October 27, 2009.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
Standards Review Subcommittee Update August 19, 2014 Co-Chairs Rebecca Berdahl, BPA Marie Knox, MISO.
1 Session # n GRIDMAN TG Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE n-11/0020 Date Submitted:
Doc.: IEEE /1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: Authors:
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Market Operations Standing Committee of the IMO Market Operations Standing Committee July 23, 2003.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Rachel Coyne Manager, Reliability Standards Program
Sept 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Business Practices Subcommittee Update
doc.: IEEE <doc#>
doc.: IEEE <doc#>
TGaf Waikoloa Closing Report
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
<month year> doc.: IEEE < e> <July 2018>
TGaf Geneva Closing Report
IEEE TGaf Waikoloa Closing Report
<month year> doc.: IEEE < e> <September 2018>
NERC Reliability Standards Development Plan
doc.: IEEE <doc#>
IEEE IMT-Advanced Review Process
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
doc.: IEEE <doc#>
doc.: IEEE <doc#>
<month year> doc.: IEEE < e> <November 2018>
TGaf San Antonio Closing Report
doc.: IEEE <doc#>
RTA TIG Closing Report Date: Authors: March 2019
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
doc.: IEEE <doc#>
Comments on IMT-Advanced Review Process
NERC Reliability Standards Development Plan
TGaf Waikoloa Closing Report
IEEE IMT-Advanced Review Process
doc.: IEEE <doc#>
July 2014 doc.: IEEE /3/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
TGaf Nanjing Closing Report
IEEE IMT-Advanced Review Process
<month year> doc.: IEEE < e> <November 2018>
TGaf San Antonio Closing Report
TGg Report to the IEEE Working Group
Presentation transcript:

1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity Status Report of activities General Meeting Denver, CO, USA – 6/8/2004

2 IEEE Power Engineering Society Working Group Scope: Consider revisions to existing 1987 Standard and produce a draft for approval through the IEEE ballot process.

3 IEEE Power Engineering Society Formed by the Risk, Reliability and Probability Applications Subcommittee per a request by Mike Curley, Manager of GADS services at NERC. A Task Force was formed in 2002 and upgraded to a Working Group per Standard Association requirements. Monthly teleconference/Web Conference meetings held since July 2002.

4 IEEE Power Engineering Society Official Roster indicating all WG participants. Minutes kept by Secretary and accepted by group. Many interested parties informed via . All Teams have finished their work assignments. A preliminary draft is available among the WG participants. A draft will soon be posted for all interested parties to review and comment. The IEEE web page for this working group is at: Draft to show examples in Annex/notes portion of Standard.

5 IEEE Power Engineering Society Schedule of future activities 1.The Project Authorization Request should be final in September Based on comments received, WG will assess/make revisions and submit to SA for balloting. – October Submission to Standards Association for balloting and approval process - October WG to answer all comments in balloting process Subcommittee – November to Feb 2005

6 IEEE Power Engineering Society Topics Considered for Revisions Outside Plant Management Pooling Methodologies Commercial Availability Concept Equivalent Demand Forced Outage Rate and Demand Forced Outage Rate Energy-weighted calculations for group performance Indexes

7 IEEE Power Engineering Society Topics Considered for Revisions Synchronous Condensing/Pumping Hours in FOR & EFOR Unweighted (Time-based) calculations for group performance Indexes Update relationships between unit states Update terms and abbreviations