Helene Felice HQ02 Assembly status 02/28/2012. HQ02 layout COIL 16COIL 15 COIL 17COIL 20 VIEW LOOKING AT LEAD END A C BD Sector A Sector B Sector C Sector.

Slides:



Advertisements
Similar presentations
HQ Structure – Mechanical Model J. Schmalzle 4/8/13.
Advertisements

Mechanical Analysis of Dipole with Partial Keystone Cable for the SIS300 A finite element analysis has been performed to optimize the stresses in the dipole.
Mechanical Design & Analysis Igor Novitski. Outlines Electromagnetic Forces in the Magnet Goals of Finite Element Analysis Mechanical Concept Description.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
Cable inventory, relative measurements and 1 st mechanical computations STUDY OF THE QUADRUPOLE COLLAR STRUCTURE P. Fessia, F. Regis Magnets, Cryostats.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
HQ Coil 23 and 25 Status LARP Video Meeting September 19, 2013 Dan Cheng.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
Start Counter Construction Update Eric Pooser 08/21/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
1 Collar Pack #2 Disassembly Incident Summary and Plan Helene Felice Heng Pan, Dan Cheng, Xiaorong Wang, Soren Prestemon, Maxim Martchevsky, Ahmet Pekedis,
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
The construction of the model of the curved fast ramped superconducting dipole for FAIR SIS300 synchrotron P.Fabbricatore INFN-Genova The construction.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O. Pincot, X. Sarasola
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
Dan Cheng 6/11/2015 QXF coil measurements plan at LBNL.
HFM High Field Magnet, Engineering Design, 20/01/2011, Pierre Manil, 1/24 EuCARD-WP7-HFM ESAC Review of the dipole design Engineering Design Pierre MANIL.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
New options for the new D1 magnet Qingjin Xu
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
L/R Coil Asymmetry Coil Fabrication Working Group Trey Holik Wednesday, June 3 rd 2015.
Fabrication of test coil for D1 2m model Michinaka SUGANO KEK WP3 meeting 08/10/2014.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
Helene Felice Team: Dan Cheng, Daryl Horler, Paul Bish, Hugh Highley and Nate Liggins Thank you to Paolo Ferracin, Gianluca Sabbi and Franck Borgnolutti.
LARP Internal Review of the MQXFA Mechanical Structure Design and Functional Requirements 7/16/2015 Dan Cheng, Helene Felice Development of the Shell-Based.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.
Hervé Allain, R. van Weelderen (CERN)
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
Mechanical tolerance analysis for the MQXF prototype structures
Hervé Allain, R. van Weelderen (CERN)
SQXF Mirror QXFSM1 Strain Gauges
Hervé Allain, R. van Weelderen (CERN)
11 T dipole coil features and dimensions
FRESCA2 Update on the dipole design and new calculations
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Fred Nobrega September 4, 2019
MQXFS6 assembly and loading
Magnetic measurements on the MQXFS6b at ambient temperature
Presentation transcript:

Helene Felice HQ02 Assembly status 02/28/2012

HQ02 layout COIL 16COIL 15 COIL 17COIL 20 VIEW LOOKING AT LEAD END A C BD Sector A Sector B Sector C Sector D 02/22/2013H. Felice2 From Maxim and Guram

Collar pack # 1 Choice of the radial shim The purpose of this first collar pack was to assess the radial shim size HQ and 20 coils are made with a revised (smaller) cable and are expected to have overall dimensions close to nominal. For the record, HQ 15 was tested in HQM04 Comparison between CMM measurements, nominal collar dimensions led to the adjustment of the radial shim from.036” to 0.032” The alignment key was not shimmed during this assembly. 02/22/2013H. Felice3

Collar pack # 1 build 0.032” radial shim stack made of Two 0.010” G10 shim => in reality closer to ” One 0.005”G10 shim 0.007” Low pressure Fuji film Effective stack ” 02/22/2013H. Felice4

Overall collar pack dimensions LE*SSRE* Nominal Pin 0.370” Feeler gauge 0.000”/0.000” 20 Pin 0.353”0.359”0.352” Feeler gauge 15 Pin 0.351”0.368”0.359” Feeler gauge 16 Pin 0.359”0.366”0.353 Feeler gauge 17 Pin Feeler gauge AveragePin Delta total Pin ”-0.020”-0.050” Feeler gauge Pack dimensions Vertical 9.060” (HQ01d 9.018)9.072” (HQ01d 9.032)9.067” (HQ01d 9.017) Horizontal 9.056” (HQ01d 9.023)9.069” (HQ01d 9.042)9.058 (HQ01d 9.026) 02/22/2013H. Felice5

Effective gaps between collars 0.032” radial shim stack made of Two 0.010” G10 shim => in reality closer to ” One 0.005”G10 shim 0.007” Low pressure Fuji film The effective stack was measured to be 0.029“  gap between collar become 0.370” Effective gap measured between collars: 0.365” in straight section Would translate in coil oversized in average by only 0.001” per midplane in straight section 0.354” in the end region Would translate in coil undersized by about 0.003”/0.004” per midplane in the ends Consistent with CMM measurements: C17 LE C mm from LE +250  m ~ 0.010” 02/22/2013H. Felice6

SG data C20 C15 C16 C17 02/22/2013H. Felice7

Fuji paper results C20 C15 C16 C17 A B C D 02/22/2013H. Felice8 A B D C Fuji paper show good pressure distribution

Status on HQ02 collar pack assembly Collar pack # 1 Consistency between CMM measurements radial shim choice, Fuji paper results, SG data and initial radial shim Uniform pressure distribution, could be slightly improved toward the midplane Collar pack # 2 we will keep the same radial shim or less: 2 layers of 0.005” Kapton wrapped around the collars 2 x 0.010” G10 shim => in reality closer to ” Stack expected ~ 0.027” The effective stack is 0.028” alignment keys shim: 0.021” per side in the straight section based on initial assumption 0.027” radial shim Collar pack assembled SG in compression, Collar dimensions and gaps measurements ongoing 02/22/2013H. Felice9

HQ02 collar pack # 2 2 x 0.005” Kapton wrap 2 x 0.010” G10 shims Stack 0.030” Probably measured slightly smaller 0.021” stack per side 2 x 0.005” Kapton wrapped around collar ” G10 (more likely to be ) 0.002” Kapton

Shimming of the straight section 0.319” 0.021” stack 2 x 0.005” Kapton wrapped around collar ” G10 (more likely to be ) 0.002” Kapton 2x 0.010” G10 shim 2 x 0.005” Kapton wrap 0.362” based on collar-pack #1 02/22/2013H. Felice ” stack 2 x 0.005” Kapton wrapped around collar ” G10 (more likely to be ) 0.002” Kapton No shim in the ends