Overview of the IEEE Process IEEE P1620 Working Group Meeting 18 September 2002.

Slides:



Advertisements
Similar presentations
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
Advertisements

Doc.: IEEE /2079r0 Submission July 2007 Terry Cole, AMDSlide 1 WG Technical Editors Opening Report (July) Date: Authors:
ASTM OFFICERS CONFERENCE SUBCOMMITTEE CHAIRMENS DUTIES AND RESPONSIBILITIES.
MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES.
ASTM Officers Training Workshop Subcommittee Chairmens Duties And Responsibilities September 11-12, 2006 Joe KouryChristi Sierk.
IEEE P1850 Imperative Principles P1850 Working Group 30 June 2008 Noelle Humenick IEEE-SA.
IEEE P1850 IEEE-SA Support P1850 Working Group 30 June 2008 Noelle Humenick IEEE-SA.
IEEE P1850 IEEE-SA Sponsor Ballot Primer 5 April 2005 Presented by Andy Ickowicz & Noelle Humenick IEEE Standards Activities.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
IEEE Standards Editorial Services Yvette Ho Sang IEEE Software Engineering Standards Committee Washington, DC 28 Februaruy 2005.
Doc.: IEEE /024 Submission January 2001 Jim Carlo, Texas InstrumentsSlide 1 Patents and IEEE 802 Stds IEEE 802 Chair’s Viewpoint Jim Carlo General.
Overview of the IEEE-SA Process
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
Angela Ortiz Program Manager Power Engineering Society Stationary Battery Committee 26 June 2006 Charlotte, NC Overview of IEEE Standardization Process.
The Standards Development Process IEEE Gary Hoffman April 13, 2015.
Submitting Your IEEE Standards Project for Approval Consideration RevCom Presentation PE/IC Meeting 9 November 2009 Prepared by Moira Patterson.
IEEE-SA myBallot TM myBallot ™ IEEE Standards Association New Electronic Balloting System Sponsor Tools.
Networking the World TM TRANSFORMERSCOMMITTEE Standards Development And Maintenance Presented by: Tom Prevost Standards Coordinator October 15, 2001.
Networking the World TM IEEE: Networking the World.
Doc.: IEEE /197R0 Submission March 2003 Terry Cole, AMDSlide WG Technical Editor’s Report Terry Cole, AMD (WG technical editor status.
Slide 1 IEEE Standardization Issues for SPIRIT Options, Costs, Impacts Victor Berman, 28 July 2005.
Division for Policy Administration 321 North Clark Street 21st Floor Chicago, IL (312) Fax: (312)
Geant4 Publication Procedures Geant4 Collaboration Meeting 23 September 2013 Dennis Wright (SLAC)
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
Page 1 Agenda and General Information IEEE > >, >
Doc.: IEEE /xxxxr0 Submission July 2007 Terry Cole, AMDSlide Common Editorial Comment Resolution Process Date: Authors:
Doc.: IEEE /0045r1 Report January 2012 Jon Rosdahl, (CSR)Slide 1 1 st Vice Chair Report Date: Authors:
The IEEE-SA Standards Process Dr. Bilel Jamoussi IEEE Standards Education Committee.
Doc.: IEEE /1218r0 SubmissionBruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company Address Phone.
Page © ASME 2016 Standards and Certification Training Module A – Administrative A5. Publication of Standards.
Doc.: IEEE /1454r0 Submission Jan 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 15 January 2013 Haasz et al, IEEESlide.
Proposed P802.16s Amendment Extension Request to RevCom
IEEE Working Group on Broadband Wireless Access (BWA)
Relevant Rules on Recirculation
Sponsor Ballot Process
Standards Activities Board
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Standards Activities Board
WG Technical Editor’s Report
Proposed P802.16s Amendment Extension Request to RevCom
IEEE CS SAB, Mar 2009 IEEE Computer Society Category A Liaison to ISO/IEC JTC 1/SC 40: Status Report Annette Reilly IEEE Computer Society
IEEE 1914 NGFI IEEE RoE TF Opening Report
IEEE-SA: MyProject Training
The Standards Development Process
IEEE-SA: Policy Changes
IEEE-SA Policy Changes Effective 2012
John D’Ambrosia Recording Secretary, IEEE 802 LMSC
1st Vice Chair Report Date: Authors: January 2012
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
John D’Ambrosia Recording Secretary, IEEE 802 LMSC
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Procedural review of initial WG ballot on P802.1CF
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Introduction to Sponsor Balloting using the myBallot™ system
IEEE White Space Radio Status Report
John D’Ambrosia Recording Secretary, IEEE 802 LMSC
Sponsor Ballot Comment Resolution
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
IEEE Standards Development
IEEE P Working Group for Wireless Personal Area Networks
Reaffirmation Status Report
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
TGn Editor Report Sept 2008 Date: Authors:
P802.11aq Waiver Request Introduction
IEEE P Wireless Personal Area Network
IEEE P Motions at the July Plenary EC Meeting
Title: LE TG Agenda for Session #63
Recording Secretary, IEEE 802 LMSC
Reaffirmation Status Report
Presentation transcript:

Overview of the IEEE Process IEEE P1620 Working Group Meeting 18 September 2002

Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish Standard l Resources

Overview of Process contd

Introduction l Staff Liaison l Answers questions about procedures l Along with chair, ensures that procedures are followed l Keeps you informed l New products l New services l Policy changes l Brings your ideas and concerns to the Standards Board and its committees

Project Approval Process

Project Authorization Request (PAR) Submission Staff Contact: NesCom Secretary - Jodi Haasz +1 (732) l The PAR is a legal document l The PAR is the authorization of work by the IEEE-SA Standards Board l IEEE extends the umbrella of indemnification to people working on an authorized standards project, if they follow the rules

Tips on Completing Your PAR l Spell out all acronyms l Be clear and succinct in your scope and purpose l Copyright agreement l Be aware of coordination l Check appropriate category for document

Development of the Draft Standard

Tips for Draft Development l Develop an outline l Assign writing among working group members l Technical editor gathers inputs and ensures technical consistency l Avoid writing document in meetings l Working with an IEEE Project Editor speeds the project l Refer to IEEE Standards Style Manual for document structure

Sponsor Balloting

Sponsor Ballot Service l Staff Contact: Manager – Chris Santos, Balloting Center +1 (732) l IEEE Standards Department provides a sponsor ballot service l Sponsor balloting may be delegated to a subgroup

Sponsor Forms a Balloting Group l May issue invitation to ballot l Specifies responsibilities of balloters l Requests classifications (P, U, G) l Sponsor approves balance l No one interest category can be 50% or more l Avoid tricks (subdividing a category) l Once balloting begins, the balloting group remains static l IEEE-SA membership or payment of a fee is required l Exception: invited experts (with the approval of Standards Board)

Response and Results of Balloting l Response l Need 75% return l Ballot fails with less than 75% return l Results l Need 75% approval l Attempt to resolve negative ballots l No mandate to resolve all ballots l After consensus (75% approval) is reached, establish 60- or 90-day deadline for resolution of comments l Recirculate revised draft and comments l Prepare report for RevCom l Show evidence of attempts to resolve each negative ballot l Show evidence and results of recirculation

Approval of the Draft Standard

How to Complete a Successful RevCom Submission CONTACT: RevCom Secretary – Dave Ringle, +1 (732) l Review Committee (RevCom) recommends action to the Standards Board l Submittal must match information on PAR l When is a revised PAR necessary? l Any substantive change, i.e., scope, title, patented material, or change of working group chair l Proof of mandatory coordination l SCC10, SCC14 and Editorial

Post-Approval and Publication

l IEEE Project Editor l Does final copy edit of text l Ensures that technical integrity of document is maintained l Formats electronic text into proofs l Committee review l Correction l Publication l Complimentary copies and awards

Resources l IEEE-SA Standards Board Bylaws l IEEE-SA Standards Board Operations Manual l IEEE Standards Companion l IEEE Standards Style Manual l Working Guide for Submittal of PAR and PAR Form l Working Guide for Submittal of Proposed Standards and Submittal Form l IEEE Standards Bearer l IEEE Standards Catalog l IEEE Process at a Glance

For more information on Overview of Process Contact Noelle Humenick +1 (732)