"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.

Slides:



Advertisements
Similar presentations
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Advertisements

Conducted for Project Execution
 Examples of bid-splitting Acceptable – When a project involves different trades and is not interdependent on the other. - If you are upgrading a room.
December 9, 2014 San Diego County Office of Education ESFG Meeting Tyree Dorward:Attorney, Best, Best, & Krieger Guiselle Carreon: Commercial Warrants.
Uniform Public Construction Cost Accounting (UPCCA) presented by: Kevin Cobb AIA/ARA, the Addington Partnership William Duncan IV, Taft College December.
SB 854 – Public Works Contractor Registration Program
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
October 9, 2013 Labor Compliance Department Boot Camp Presentation 1 Presented by:Andres Posada Angela Kwong.
WELCOME! SBE Boot Camp LEARN HOW TO BID JOB ORDER CONTRACTS (JOC)
Welcome to the 2015 Prevailing Wage Survey Tutorial This tutorial will assist you in the process of completing Survey Forms. If you still have questions.
CALIFORNIA UNIFORM PUBLIC CONSTRUCTION COST ACCOUNT ACT April 4, 2013 These materials have been prepared by the CASBO San Diego- Imperial Section Purchasing.
Los Angeles Unified School District Owner Controlled Insurance Program (OCIP) Aristeo Aguilera, CRIS OCIP Risk Manager Boot Camp September 2014.
2009 CDBG/CHIP Recipients’ Workshop CDBG LABOR STANDARDS.
CDBG Labor Standards Tonya Mole, Pam Truitt  September 4, 2014.
Davis-Bacon, Related Acts, and Your Project Where you can locate the information needed to comply with Davis-Bacon and Related Acts 1.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
October 2014 Labor Compliance Department Boot Camp Presentation 1 Presented by: Huin Chhay & Aaron Leung.
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
Los Angeles Unified School District Facilities Services Division Small Business Enterprise (SBE) Policy & Program.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
KIMBERLY FRELOW SMALL BUSINESS PROGRAM MANAGER Facilities Contracts Small Business Program Small Business Enterprise/We Build.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
October 2015 Labor Compliance Department Boot Camp Presentation 1 Presented by: Jessica Tam.
LOS ANGELES UNIFIED SCHOOL DISTRICT FACILITIES SERVICES DIVISION FACILITIES CONSTRUCTION CONTRACTS THE DISTRICT’S PREQUALIFICATION PROGRAM PRESENTED BY:
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
2013 CDBG Recipients' Workshop CDBG Labor Standards.
Meet DES Curtis Pate Roland Orr Engineering & Architectural Services Delegated Contracting Authority.
Office of Procurement Services.  Vendor Application Website: 
WELCOME! SBE Boot Camp JOB ORDER CONTRACTING (JOC) CHRISTY GUZMAN JOC Program GAYANE STEPANYAN JOC Program September 30,
May 4, 2011 Jenefer Youngfield Utah State Office of Education Utah K-12 Public School Construction Education and Training.
Simile Billing Process. On the 20 th of the month the Project Administrators monthly billing reminders to all subcontractors that need to be paid.
Nyc Build it back RFB Furnishing All Labor and Material Necessary and Required for residential construction services July 24, 2017.
Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 18, 2016.
Joint Parking Task Force Update Procurement & Strategic Sourcing
Joint Parking Task Force Update Procurement & Strategic Sourcing
Construction Oversight
Joint Parking Task Force Update Procurement & Strategic Sourcing
Managing Construction Projects
Procurement & Strategic Sourcing FPM Parking Structure Lighting
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing FPM Campus Signage Refresh
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing FPM Elliman Fume Hood Relocation 2018
Procurement & Strategic Sourcing Elliman Air Handling Units
Procurement & Strategic Sourcing FPM PRB Freezer Farms HVAC
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing USB Roof & Structure Repairs
Procurement & Strategic Sourcing Social Work Roof Replacement
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing Matthaei Weight Room Flooring
Procurement & Strategic Sourcing Heat Pump Replacements 5057 Woodward
Procurement & Strategic Sourcing MHRFC South Elevation Glazing Sealant
Procurement & Strategic Sourcing Elliman Air Handling Units REBID
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
ARCH 435 PROJECT MANAGEMENT
Request for Proposal and Specifications for
Procurement & Strategic Sourcing
Doing Business with Sno-Isle Libraries
Procurement & Strategic Sourcing FPM-Pharmacy-Additional-Boiler
Procurement & Strategic Sourcing FPM-Pharmacy-Additional-Boiler
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing School of Social Work Phase II
FPM School of Social Work Phase II Renovation Project No
Presentation transcript:

"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting work. “A” LETTER – NOT TO EXCEED FIXED PRICE "B" LETTERS WITH PREDETERMINED SCOPES OF WORK Establishes a total price for work to be performed. “B” LETTER – SUBCONTRACTORS PROHIBITED (if applicable)

PUBLIC PROJECT CONSTRUCTION SERVICES Under $15,000 maximum Painting and repainting, alteration, improvement, demolition, renovation, erection, construction, reconstruction and repair MAINTENANCE AND EQUIPMENT REPAIR $83,400 maximum – adjusted annually by the State Superintendent of Public Instruction Routine, recurring and usual work

Environmental (Asbestos and/or Lead) Advertising Bid & Award Verification of Lowest Responsive Biddder’s Documentation Subcontractor Verification (if applicable) Contract/Award Documents for Director’s Approval Construction Documents Contract Closeout

Angela Y. Worshim-McCloud Best Flooring Around Company (310) (310) None

Informal contracts over $15,000 require a performance bond; those under $15,000 do not require bonding. Prevailing Wage applies to ALL CONTRACTS $15,000 and over, applied to the contract price, which means that subcontractors also pay prevailing wage, regardless of their portion of the contract amount. Usually a specialty license is required depending on the type of project. The District's Informal projects require $1,000,000 in comprehensive General Liability insurance and auto insurance through a California-admitted Insurance Company with an A-VII or higher rating, according to the A.M. Best Company standards. OCIP is NOT provided on Informal Contracts. The minimum State Worker's Compensation Insurance. All specialty contracts that exceed $20,000, and are funded in whole or in part by monies from local bonds, are subject to the Project Stabilization Agreement. All contractors are required to be safety pre-qualified prior to bid award and they must comply with the safety standards. For additional information and/or a Safety Pre-Qualification Questionnaire, contact LAUSD Safety Pre-Qualification section at (562) /(562) or at

A/B COVER LETTER SCOPE OF WORK, PLOT PLAN AND SPECIFICATIONS (if applicable) BID ENVELOPE  BID FORM  Telephone  /Fax  Bid Form (bids under $15,000) Sealed Bid Form (bids $15,000 and over) NOTICE TO BIDDERS RE: INSURANCE & BOND REQUIREMENTS NOTICE TO BIDDERS RE: SAFETY PREQUALIFICATIONS CERTIFICATION OF INSURANCE FORM PREVAILING WAGE CERTIFICATE (bids $15,000 and over) CODE OF ETHICS POLICY LEAD RESULTS (if applicable) ASBESTOS RESULTS (if applicable) PERFORMANCE BOND FORM (bids $15,000 and over) PROJECT STABILIZATION AGREEMENT/LETTER OF ASSENT (if applicable) SUBCONTRACTORS LIST (if applicable) SAMPLE A/B LETTER SAMPLE NOTICE OF COMPLETION

a. Introduction and Background Attendees Sign Meeting Attendance Sheet. b. Introductions (OAR, DR, CPM, Labor Compliance, Contractor) c. Define Roles And Responsibilities of OAR, DISTRICT REPRESENTATIVE and CONTRACTOR Safety and Health a. Review Roles and Responsibilities for Site Safety. b. Review Workplace Conduct c. Alcoholic Beverages Are Not Permitted on the Project Site. d. Contractor to Ensure Employees Are Dressed Properly and Not Use Profane Language. e. No Tobacco Use is Allowed on OWNER Property. f. Restrict Operations Areas and Traffic Control g. Contractor Shall Provide Proper Flagmen when Impacting Street Traffic and Crossing Sidewalks, and Whenever Driving on Site. h. Construction Debris Shall Not Accumulate and Shall be Removed Offsite Daily by Contractor. i. Barricades to be Installed as Required to Insure the Safety of Pedestrian. j. Contractor to Control and Mitigate Dust Caused by Construction Activity as Required by Contract Documents. Environmental a. Review CONTRACTOR’S Proposed Usage Of Hazardous Materials. b. General Hazardous Material Handling. c. Asbestos and Lead Reports; Coordination with Environmental Consultant (If applicable)

Construction a. Review Contract Scope of Work. b. Temporary Facilities i.Lay Down Area and Storage Areas ii.Trash Removal (offsite) iii.Site Access (including deliveries) iv.Parking Availability (On & Off-site, Restrictions, Etc.) v.Housekeeping vi.Security vii.Contractor’s Normal Working Days c. Coordinating Work Areas with Others i.Coordination of Project Work with School Administrator ii.Coordination of Project Work with Other School Site Projects/Contractors d. Telephones – DO NOT USE SCHOOL DISTRICT PHONES!!!! e. Permits – Offsite Improvement Permit (BC Permit) & Inspection/Approval Requirements (if applicable) f. Quality Control and Inspection PSA Agreement (Contract > $20,000 and Bond Funded) a. DISTRICT REPRESENTATIVE shall review PSA Agreement regarding: Construction Schedule and Progress Reporting a. Critical Work Sequencing b. DISTRICT REPRESENTATIVE proposed date for Construction start is.

Testing and Inspection a. Calling for Inspection by DISTRICT REPRESENTATIVE. Contractor Payments (If progress payments apply) a. Review of Applications for Payment Process b. Progress Payment Schedule and Progress Measurement Contract Management a. Correspondence i.Contractor Shall Send All Correspondence to the DISTRICT REPRESENTATIVE b. Contract Compliance i. Contractor/Subcontractors (if applicable) to Review Contract Documents Prior to Starting Work. c. Claims Process i. Contractor Must Submit Claims To: Los Angeles Unified School District Executive Officer of the Board 333 S. Beaudry Avenue, 24 th Floor Los Angeles, CA 90017

VERIFICATION OF LOWEST RESPONSIVE BIDDER’S RESPONSIVE BIDDER’SDOCUMENTATION

California State License Board Click on “check status” Safety Pre-Qualification Click on “Safety Prequalification Log” Contractor’s Insurance Register, sign-on

Is Contract $15,000 or More? Yes Prevailing Wage Certificate Notice to Public Entity Weekly Certified Payroll Performance Bond

Is Contract Bond- Funded & $20,000 or More ? Is Contract Bond- Funded & $20,000 or More ? Yes

Is Contract $30,000 or More ? Is Contract $30,000 or More ? Yes OAR electronically files the PWC100 with the Division of Apprenticeship Standards, which is a Division of Labor Standards Enforcement

 B LETTER CHECKLIST  BID TAB  A/B LETTER DRAFT