AWMA – Georgia Chapter Air Permitting Update April 16, 2013 Eric Cornwell Stationary Source Permitting Program.

Slides:



Advertisements
Similar presentations
Development and Application of PM2.5 Interpollutant Trading Ratios to Account for PM2.5 Secondary Formation in Georgia James Boylan and Byeong-Uk Kim Georgia.
Advertisements

Jan. EPA Final GHG Reporting Guidance (actually Dec ) Mar. 31stAnnual GHG Reporting AprilProposed HAPs or Mercury MACT July 1st Annual Toxic Release.
Dispersion Modeling Jim McGraw Program Development Supervisor.
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
Air Pollution Grab Bag. Middletown Coke Produce coke from coal which will be used by AK Steel to produce iron Facility will have 100 ovens and produce.
What options do states have? What is Georgia planning to do? What are some of the other states doing? What are the possible implications to permit fees?
Response to Comments on HAR Amendments Clean Air Branch Greenhouse Gas Rules Stakeholders Meeting 10/18/2013.
Air Permitting Overview.
DEP’s Air Regulatory Update
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
National Ambient Air Quality Standards for NO 2 and SO 2 – New Modeling Challenges August 4, 2011 Air & Waste Management Association – Southern Section.
Impact of Regulations on Wood Pellets Manufacturing Industry Atlanta, GA ♦ October 24, 2013 Anupama Krishnan.
Environmental Protection Division Air Quality Update Georgia EPD Jimmy Johnston Georgia Environmental Protection Division August 5, 2011.
Environmental Protection Division Air Quality Update Georgia EPD Jimmy Johnston Georgia Environmental Protection Division September 12, 2012.
A&WMA Georgia Regulatory Update Conference Current State of the Air in GA Jac Capp, GA EPD, Branch Chief, Air Protection Branch April 16, 2013.
Air Toxics in Region 4 A&WMA Annual Conference August 6, 2008 Lee Page Air Toxics Assessment and Implementation Section EPA, Region 4 Atlanta, Georgia.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
Transitional PSD Applicability Scenarios July 20, 2010 Jay Hofmann President trinityconsultants.com Troutman Sanders/Trinity Consultants PSD and Title.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
2005 Air Emissions Inventory Criteria and Hazardous Air Pollutants Inventory Southern Ute Indian Reservation, Colorado Presented by : Brenda Sakizzie,
GA EPD Air Protection Branch AWMA Southern Section August 2015.
GA EPD Permit & SIP Modeling Update James W. Boylan Georgia EPD – Air Protection Branch Manager, Data and Modeling Unit AWMA Regulatory Update Conference.
August 4, 2011 Heather Ceron US EPA Region 4 1. Greenhouse Gases 2.
Development of PM2.5 Interpollutant Trading Ratios James Boylan and Byeong-Uk Kim Georgia EPD – Air Protection Branch 2012 CMAS Conference October 16,
Environmental Protection Division Air Quality Update Georgia EPD Jimmy Johnston Georgia Environmental Protection Division August 5, 2010.
CANDACE CARRAWAY OFFICE OF AIR QUALITY PLANNING AND STANDARDS US EPA JUNE 2013 General Permits and Permits by Rule 1.
Lori Hanson Title V Operating Permit Supervisor (515)
Air Quality Regulations – What’s New? (for Ethanol Plants) Shelley Schneider Air Quality Division Administrator.
Air Quality Policy Division D P A Q PM 2.5 Final NSR Implementation Rule Nat’l Tribal Air Assoc. July 16, 2008.
Greenhouse Gas (GHG) Permit Training Region 4 – Atlanta, GA Dec , 2010.
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
Early Action Compacts Presented by Karen Borel EPA Region 4 March 25, 2003.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
September Lori Hanson, Lead worker Dispersion Modeling (515)
ANPR: Transition to New or Revised PM NAAQS WESTAR Business Meeting March 2006.
National Ambient Air Quality Standards and Current Status of Air Quality Laura Boothe North Carolina Division of Air Quality MCIC Workshops March 2012.
Georgia’s 112(g) Experiences Eric Cornwell Acting Manager Permitting Program.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
PSD/Nonattainment Review You can do this! Marc Sturdivant Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2015.
Proposed Revisions to the Guideline on Air Quality Models
Brad Miller Anna Kelley. National Ambient Air Quality Standard Update New Sulfur Dioxide Non-Attainment Area – Effective October 4, 2013 Ozone Secondary.
A&WMA Southern Section Annual Meeting Biloxi, MS September 12, 2012 Carla Brown, P.E. MS Dept. of Environmental Quality
Permitting and National Ambient Air Quality Standards Changes Rick Goertz, P.E. Air Permits Division Texas Commission on Environmental Quality Advanced.
Greenhouse Gas Tailoring Rule aka GHG Permitting Rule.
Update on EPA’s Greenhouse Gas Rulemakings Norman W. Fichthorn Hunton & Williams LLP 2010 American Public Power Association Energy and Air Quality Task.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
Tribal Permitting Conference 2013 Steve Dunn, P.E., Construction Permit Team Leader; Bureau of Air Management (608) ;
PM2.5 NAAQS Implementation Interactive Session NACAA Annual Meeting May 8, 2013 St. Louis, MO 1.
OAQPS Update WESTAR April 3,  On March 12, 2008, EPA significantly strengthened the National Ambient Air Quality Standards (NAAQS) for ground-level.
AWMA – Georgia Chapter Air Permitting Update May 1, 2014 Eric Cornwell Stationary Source Permitting Program.
N EW Y ORK S TATE D EPARTMENT OF E NVIRONMENTAL C ONSERVATION Short Term Ambient Air Quality Standards and The Effect on Permitting Margaret Valis NESCAUM,
Tailoring Rule - Title V Scenarios July 20, 2010 Katherine N. Blue Principal Consultant, Climate Change Services trinityconsultants.com Troutman Sanders/Trinity.
NAAQS Status in GA & PSD Inventory Update James W. Boylan Georgia EPD – Air Protection Branch Manager, Planning & Support Program AWMA Regulatory Update.
Regulatory background How these standards could impact the permitting process How is compliance with the standards assessed.
PSD/Nonattainment Applicability Arturo J. Garza Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2016.
New Ozone NAAQS Impacts: What Happens Next with a Lower O3 Standard? Nonattainment Designation and Industry’s Opportunity to Participate New Ozone NAAQS.
PSD Background Presentation
Technical Manuals 1002 & 1003 Updates
Steve Page Office Director, OAQPS NACAA Spring Meeting 2010
NACAA Permitting Workshop, Chicago June 14, 2011
GHG Permitting: Regulatory Update
AWMA Georgia Chapter Regulatory Update Conference EPD Air Protection Overview March 2016.
PM2.5 NSR and Designations
Kansas Air Quality Seminar March 5, 2008
Air Update, Georgia EPD Karen Hays Chief, Air Protection Branch
Air Permit Application Fees
SIA in US Legislative Update Shanghai, China
RHPWG – Control Measures Subcommittee Oil & Gas Source Coordination
Navajo Nation Minor Source Regulations
Presentation transcript:

AWMA – Georgia Chapter Air Permitting Update April 16, 2013 Eric Cornwell Stationary Source Permitting Program

SSPP Structure 4 Units - 28 permit engineers, 2 admin – Chem Unit – Glass, engineered wood – NOx Unit – Landfills, engines – VOC Unit – Wood pellets, lumber kilns – Min Unit – Military, rendering, asphalt

Permit Application Timeliness: Pending Application Count (April 2013): – 202 permit applications – 12 (non TV-renewal) apps older than six months – 500 permit apps processed in past 12 months Processing time – Title V significant modifications……161 days – 502(b)10…………………………….…...66 days – Synthetic Minor…………………..……62 days

Expedited Permits In response to Senate Bill 427  O.C.G.A (c)(1)(A). Implemented no later than July 1, 2013 Two stakeholder meetings (Oct and Dec) /expeditedssppmeeting.htm

Expedited Permits, Cont. No rulemaking – Director to implement procedures. Fee-based and optional for applicants Reviews done by EPD – no third party review TV-I, TV-R, MAWO not eligible

PSD Resources PSD Guidance for Industry – now available Pre-processed met data – now available Background ambient concentrations – now available Statewide NAAQS and PSD Increment inventory (aka Off-site Emissions inventory) – Not yet…EPD intends to do this if funding is available

PSD Guidance for Industry Provides up-front expectations for a complete PSD application – BACT, Modeling, Submittals – Emphasizes early resolution of issues. /psd_guidance_document.htm

8 Meteorological Data GA EPD has developed 5-years of meteorological data for each ASOS surface and upper air pairing – Pairing based on distance, climatological zone, and data completeness criteria – Last updated on April 4, 2013 All data sets are available on-line – tdata.htm

9 Surface/Upper Station Pairings

10 Surface Roughness Update Previously, EPD provided data sets with three different surface roughness values (0.05, 0.5, 1.0) and the applicant ran AERSURFACE at the project site to find the most representative value. Now, meteorological data is processed using the surface roughness at the airport – 12 different sectors Applicant will provide a justification for representativeness in modeling protocol

11 Background Concentrations GA EPD has develop background concentrations for each county based on the design values – PM10, PM2.5, SO2, NO2, CO, Pb Will update to design values by the end of April All data sets are available on-line –

12 Permit Modeling Guidance Guideline for Modeling PM10 Ambient Concentration in Areas Impacted by Quarry Operation Producing Crushed Stone - August 7, 2012 – modeling/quarryguideline_august2012.pdf

GHG Permitting July 20, 2014 – Biomass deferral set to end. – GHG-major sources with non-PSD permits must “begin actual construction” prior to this date; otherwise permit invalid. US EPA has recently proposed revised “Global Warming Potential (GWP) for Part FR 19809, Table 2

Boiler MACT and GACT Final standards published in FR Feb 2013 SSPP slowly rolling details into permits – Adding to already pending applications – Companies can request revisions – Conditions as specific as practical – No mass “open for cause”

Wood Pellet Emission Factors Process – Log chipper, dryer (usually direct- contact), hammermill, pelletizer, and pellet cooler. Downstream testing showed VOC previously unaccounted for. – Plants over ~120,000 tpy production may be PSD major without downstream controls. Manny Patel developed default wood pellet emission factors from AP-42 and testing

EPD switching systems – Novell to Outlook – Air Branch transition this week – addys to remain the same – 10 Megabyte attachment limit