Electric Reliability and the Clean Power Plan Branden Sudduth Director, Reliability Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.

Slides:



Advertisements
Similar presentations
1 WECC/AESO Membership and Coordinating Operating Agreement WECC Board of Directors Meeting December 2007 Diana Pommen Director Interjurisdictional Affairs.
Advertisements

NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
NERC Orientation Joint Guidance Committee WECC Leadership
BAL-002-WECC-1 Contingency Reserves
WECC Reliability Management System
COMPLIANCE 101 Module One.
Reliability Challenges White Paper Victoria L. Ravenscroft Senior Policy Analyst W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
California GHG policy and implications for the power sector APEX Sydney Conference October 13, 2008 Anjali Sheffrin, PhD.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Compliance Monitoring Strategy/Schedule Kim Israelsson Manager, Compliance Program Coordination and Process Integration.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Effect of Thermal Generation Replacement on System Frequency Response Enoch Davies, PE Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Compliance Monitoring Strategy Kim Israelsson Manager, Compliance Program Coordination and Process Integration.
Colorado Renewable Requirements, Policies, and Projects James Tarpey, Esq. Commissioner Colorado Public Utilities Commission 1560 Broadway, Suite 250 Denver,
Political Factors Affecting the Renewables and Energy Efficiency Remarks of Ron Binz, Chairman Colorado Public Utilities Commission October 15, 2010 IPPAI.
Overview of WECC and Regulatory Structure
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
Wind & Transmission: The Clean Energy Superhighway Mark Lauby Manager, Reliability Assessments, NERC.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Reliability Assurance Initiative (RAI) 101 Ben Christensen Senior Compliance Risk Analyst, Cyber Security.
EPA’s Proposed Clean Power Plan House Committee on Natural Resources and Environment February 12, 2015 Tegan B. Treadaway Assistant Secretary Office of.
Western Renewable Energy Zone Project October 29, 2009 John Savage Oregon Public Utility Commission.
California Energy Commission IEPR Lead Commissioner Workshop University of California, Irvine August 17,
Updated 1/28/2011.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Indiana Energy Conference EPA Clean Power Plan—111(d) November 13, 2014 Thomas W. Easterly, P.E., BCEE, Commissioner IN Department of Environmental Management.
Standing Up The New Electric Reliability Organization Ellen P. Vancko North American Electric Reliability Council.
L. David Glatt North Dakota Department of Health Environmental Health Section.
June 26, Background of Federal GHG Regulation Supreme Court determines greenhouse gases (GHGs) are “air pollutants” under the Clean Air Act U.S.
Reliability Planning Priorities for 2015 Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ENERGY STAR® WORKSHOP Riffe Center Columbus, Ohio April 26, 2007.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
UAMPS EXISTING RESOURCES Coal  Intermountain Power Project 253 MW  Hunter II 65 MW  San Juan 35 MW Gas--Nebo NGCC 141 MW Hydro275 MW Renewable 78 MW.
Puerto Rico Electric Power
FERC Staff’s Report on Demand Response and Advanced Metering.
FINAL CLEAN POWER PLAN Before the Virginia Energy Efficiency Council Virginia Department of Environmental Quality November 12, 2015.
Smart Grid Schneider Electric Javier Orellana
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Clean Air Act Section 111 WESTAR Meeting Presented by Lisa Conner U.S. Environmental Protection Agency Office of Air and Radiation November 6, 2013.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TEPPC Meeting February 4, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board CREPC/SPSC/ WIRAB Update.
TEPPC 2015 Work Plan Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Regional System Operator Issues Analysis Ron Lehr Western Clean Energy Advocates January 7, 2016.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Clean Power Plan & Reliability – An Update TEPPC Winter 2016 Meeting February 3 rd – 4 th 2016 Vijay Satyal PhD, Sr. Policy Analyst W ESTERN E LECTRICITY.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Western State Targets and Key Issues Patrick Cummins, CNEE September 10, 2015.
Reliability Assessment Committee Proposal TSS Meeting
MAC Board Effectiveness Survey
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Wind & Transmission: The Clean Energy Superhighway
WECC Staff Risk Prioritization
Byron Woertz, Manager—System Adequacy Planning
Byron Woertz, Manager—System Adequacy Planning
Overview of WECC and Regulatory Structure
WECC Staff Risk Prioritization
MAC Board Effectiveness Survey
Presentation transcript:

Electric Reliability and the Clean Power Plan Branden Sudduth Director, Reliability Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL

WECC History and Background 2 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Energy Policy Act 2005 FERC Authority under Section 215 – Mandatory Reliability Standards – Compliance Monitoring and Enforcement – Civil Penalties and Sanctions NERC approved as Electric Reliability Organization (ERO) Eight Regional Entities including WECC delegated to implement standards and compliance Northeast Blackout August 14, 2003 ~50 million people $6 billion

WECC Roles in the Industry 3 W ESTERN E LECTRICITY C OORDINATING C OUNCIL What we do: o Compliance Monitoring and Enforcement o Standards Development o WREGIS (REC tracking) Reliability Planning and Performance Analysis What we do not do: o Site, permit, or build transmission o Operate transmission o Cost allocation o “Pick winners” WECC’s mission is to promote and foster a reliable and efficient bulk electric system

EPA Clean Power Plan Impetus: President’s Climate Action Plan instructed EPA to reduce CO₂ emissions EPA Authority: Section 111(d) of Clean Air Act – Identified existing affected electric generating units (EGUs) – 30% reduction in CO₂ by 2030 relative to 2005 levels Approach: EPA set state specific 2030 emission rate goals, allowing for flexibility in compliance 4 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Varying State Emission Rate Goals Block 1 Block 2 Block 3 Block 4

WECC Focus – EPA Clean Power Plan Our intent: Provide unbiased and objective information that can be used by state officials, public utility commissioners, utilities, and other interested stakeholders to understand the potential impacts of the proposed rule (and resulting plans) Our focus: Identifying potential reliability impacts and supporting regional collaboration – No compliance obligations – Will not recommend specific compliance plan(s) Stakeholders are a critical part of WECC’s efforts

EPA CPP- Potential Reliability Challenges Changes to interconnected system – Changing load shapes and resource mix – Adequacy of resources to offset potential retirements – System stability and resiliency to disturbances Responsiveness and flexibility of system to maintain reliability 7 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Reliability Challenges of a Changing System Old Paradigm: High load situations are the most stressful New Paradigm: New stressed conditions could be driven by the resource mix Hot Summer Day Load (MW) 24 hours Peak hour has worried us most Cool, Sunny, and Windy Spring Day Load (MW) 24 hours What about this situation? Non-VG Wind Solar Non-VG Wind Solar As a percentage of total load, there is less spinning mass on the system in the “new paradigm”

Potential Reliability Implications of 111(d) Grid-planning challenges – – Changes to resource mix – Increased penetration of renewables (utility scale & DG resources) – Transmission adequacy – Timely Replacement of aging generators Operational effects – – Viable replacements of baseload resources – Timely natural gas deliverability and security 9 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

WECC Role in 111(d) Analyses 10 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Phase 1 Western States develop options Identify compliance strategies Phase 2 Partner with states – regional solution(s) Coordinate with WIEB/CNEE, others Phase 3 Engage with WECC – Reliability Assessments

WECC Approach to Addressing Key Reliability Issues Evaluate reliability impacts only Partner with WIEB, CNEE and key entities Engage WECC membership and other stakeholders 11 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

12 Branden Sudduth Director, Reliability Planning Tel: Thank you