Volker SchlottIWBS’04, Grindelwald, 06.-10.12.2004 Report on internal „mini-workshop on beam stability at SLS” SLS PAUL SCHERRER INSTITUT The workshop.

Slides:



Advertisements
Similar presentations
22-23/06/20093 rd Libera Users Meeting, ESRF1 3 years of experience of Libera BPMs at SOLEIL Nicolas HUBERT Synchrotron SOLEIL On behalf of Diagnostics.
Advertisements

New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines Paul Scherrer Institut SwissFEL Timing System.
MONALISA: Interferometric Position Monitor at the Nanometre Scale David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
5 th CARE workshop on Novel Methods for Accelerator Beam Instrumentation, Chamonix, Dec Requirements for Tune, Coupling and Chromaticity Feedbacks.
September 24, The ‘history’ program Yi Chih Liu Operation Group Taiwan Light Source.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
1 Slow Global Orbit Feedback at Pohang Light Source (PLS) Heung-Sik Kang Pohang Accelerator Laboratory Pohang, Korea.
University of Dortmund Marc Grewe, IWBS 2004, Grindelwald, CH 1/21 Orbit Correction Within Constrained Solution Spaces.
Transaction Processing IS698 Min Song. 2 What is a Transaction?  When an event in the real world changes the state of the enterprise, a transaction is.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
1 Linac/400 MeV BPM System Status Nathan Eddy PIP Meeting 8/8/12.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
WAO 2007 Andrej Košiček Dealing with the Obsolescence in state-of- the-art Electronic Components 27 September 2007.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
Alignment and Beam Stability
Beam Instrumentation for Orbit Stability I. Pinayev.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone Orbit Stability: Recent Activities.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI EPICS Meeting, Saclay Paul Scherrer Institut SwissFEL Timing System Babak Kalantari.
12/6/2004ALS, C. Steier, IWBS IWBS 2004: ALS Facility Report Christoph Steier, A. Biocca, M. Chin, E. Domning, G. Portmann, D. Robin, T. Scarvie,
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
Photon Beam Position Monitors and Beam Stability at the Swiss Light Source E. van Garderen, J. Krempaský, M. Böge, J. Chrin, T. Schmidt Paul Scherrer Institute,
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Problems setting-up the ALBA FOFB Problems setting-up the ALBA FOFB DEELS May - ESRF Angel Olmos.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
DESY: From High Energy Physics to Synchrotron Radiation Accelerator Operation in a changing Environment Michael Bieler DESY: From High Energy Physics to.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Issues on Closed Orbit Feedback for NSLSII NSLS-II Stability Workshop April 18-20, 2007 Li-Hua Yu.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II PAC Meeting May 24, 2007 S. Krinsky.
Machine Protection at the 1MW CEBAF Electron Accelerator and Free Electron Laser Facility Kelly Mahoney Presented at the Workshop for.
Proposal to use electromagnetic correction coils for RT trajectory correction.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
GG3 Operations & Reliability (Availability) Eckhard Elsen Tom Himel
Real time performance estimates of the LHC BPM and BLM system SL/BI.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
Advanced Optics Control, CERN, Masamitsu Aiba, PSI Recent optics measurements at SLS M. Aiba, M. Böge, Á. Saá Hernández, D. Mayilyan and.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Photon Beam Position Monitors and Beam Stability at the Swiss Light Source Elsa van Garderen March 12 th, 2008.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
May 31, 2005Mike Hildreth – ATF 2005 Energy Spectrometry and ATF Components of the nano-BPM Test Program and Plans for Future Tests Mike Hildreth University.
Electron beams in order to sense nm-size mechanical vibrations? CERN: Marek Gasior: BBQ electronics (Andrea Boccardi: VME electronics) Juergen Pfingstner:
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
LCWS, UTA, Reaching ultra-low emittance at SLS through (systematic and) random optimization LCWS 2012 Joint CLIC/ILC Working Group – Damping.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
Summary WG 9 Instrumentation and Control 1 session: 2 presentations 1 contribution discussion Oct 12, 2014 M. Minty, H. Schmickler.
Low-Emittance Tuning at CesrTA Jim Shanks Cornell Laboratory for Accelerator-Based Sciences and Education.
Wir schaffen Wissen – heute für morgen PSI, March 2013 Paul Scherrer Institut PSI / DESY / KIT Mini-Workshop on Longitudinal Diagnostics for FELs.
Anticipated Limits on Machine Stability and some Consequences on Machine and Beamline Designs Jean-Claude Denard Workshop on Accelerator R&D for USRs Hairou,
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Transition to user operation Didier Voulot :: Paul Scherrer Institut SwissFEL Commissioning Workshop, 22 March2016.
Fast Global Orbit Feedback for the Australian Synchrotron Eugene Tan Accelerator and Operations 13/12/20101 ACAS Workshop on Accelerator Feedback Systems.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Overview Preparatory work at the MML BBA to define the reference orbit
Digital Light Sources First introduced in 2001.
A monitoring system for the beam-based feedbacks in the LHC
Auxiliary Positron Source
Revised Commissioning Strategy
Fast Orbit Feedback at the SLS
Presentation transcript:

Volker SchlottIWBS’04, Grindelwald, Report on internal „mini-workshop on beam stability at SLS” SLS PAUL SCHERRER INSTITUT The workshop was held at SLS on September, 9th 2004 It was intended to… review the original specifications for beam stability at SLS review the performance of the FOFB including all subsystems collect experience from users and operators define fields for improvements to discuss options for improvements to re-specify the future requirements for beam stability The workshop was attended by beam dynamics and instrumentation users operations management

Volker SchlottIWBS’04, Grindelwald, Report on internal „mini-workshop on beam stability at SLS” SLS PAUL SCHERRER INSTITUT Original requirements on SLS beam stability (as specified to BPM system in 1998) - position stability of source point:  /10 of source size (vertical) e.g.: 1  m at low-  IDs for 1% coupling - angular stability of source point:  <  rad - long term stability (12 h):±  m (of electron beam) - reliability:high (but not explicitly specified) Achievements of SLS beam stability (since beginning of 2004) - position stability of source point:~  /30 (vertical, Hz) < 0.3  m at low-  IDs (vertical, 1 – 150 Hz) ~  /250 5 Hz) vertical ~ 0.02  m global vertical orbit 5 Hz - angular stability of source point:  <  rad (1 – 150 Hz, vertical) - long term stability (24 h):  m (of electron beam) - reliability:~ 1 BPM failure per month (1 failure since September) < 3 FOFB subsystem failures per months (2 failures since September – user, network) - signal integrity:data verified by photon BPM readings discrimination of electrical (DBPM systematics) and mechanical effects (drifts) through POMS system

Volker SchlottIWBS’04, Grindelwald, Report on internal „mini-workshop on beam stability at SLS” SLS PAUL SCHERRER INSTITUT The operations / operators point of view… - excellent short and medium term performance of orbit feedback (FOFB) - good DBPM long term stability and reproducibility of “golden orbit” – even after shut-downs - operators would appreciate easier handling of FOFB – but highly complex systems and the many options and possibilities, which are supported, demand conscious and elaborated use!!! - maintainability and reliability could be improved in terms of… failure rate of DBPMstarget rate: < 1 failure per month (achieved since September) faster HW exchangetarget: < 1 hour for electronics exchange improved SW support for quick failure detection and analyses - allow local bumps (“bump-scans”) during user run within FOFB application - calibration of DBPM system for low current operation and different SR filling modes

Volker SchlottIWBS’04, Grindelwald, Report on internal „mini-workshop on beam stability at SLS” SLS PAUL SCHERRER INSTITUT The users point of view… - beamlines / experiments can obviously be divided into 2 categories: a) “large focus” … ~ 100  m b) “  -focus” … < 10  m (presently) ~ 20 nm (planned POLLUX beamline) - category a) beamlines are in general happy with SLS beam stability (performance of FOFB) - category b) beamlines short term stability (hours to 100 Hz) is excellent – except from some occasional spikes (only reported from 06S protein crystallography) top-up injection is visible (due to not perfectly closed injection bump) – gating…? (directly) after shut-down (usually 1-2 weeks) photon beam is “only” back to ~ 10  m no beamline operation possible without FOFB running !!! - present energy resolution of SIM-beamline (  E/E ~ to ) corresponds to ~ 1  rad beam motion (short term). Future beamlines (ADRESS) will have  E/E ~ to and will thus need beam motion of < 0.1  rad.

Volker SchlottIWBS’04, Grindelwald, Report on internal „mini-workshop on beam stability at SLS” SLS PAUL SCHERRER INSTITUT (F)OFB and sub-systems performance and limitations - for FOFB performance and orbit correction concept… see talks from Th. Schilcher and M. Böge - (SLS) DBPM-system most of the concept is still valid… but keep in mind, the system is “already” 7 years old! ProsCons high flexibility of systemHUGE effort in SW development HW and SW (almost) debuggedmost of the components are outdated systematics are known and/or eliminated→ difficult repair and upgrade(s) → bandwidth and resolution limitations - Photon BPMs – white beam diagnostics only used for…fixed (smallest) in-vacuum ID-gaps wigglers and bending magnets authenticity of data is questionable for…(low energy) undulator beamlines monitors need calibration, which is non-trivial and time consuming data need to be integrated in (F)OFB (synchronization!) - Mechanical Movements (POMS) POMS-data is available for discrimination of electronical drifts and mechanical movements only used for monitoring since NO MECHANICAL DRIFTS IN TOP-UP OPERATION

Volker SchlottIWBS’04, Grindelwald, Report on internal „mini-workshop on beam stability at SLS” SLS PAUL SCHERRER INSTITUT Preliminary conclusions and outlook… - original performance goals have been reached and even exceeded → TOP-UP OPERATION REPRESENTS A MAJOR KEY TO BEAM STABILITY !!! - reliability is pretty high / failure rate is fairly low… but could always be better - trouble shooting could be improved… but keep in mind complex systems are never easy (to use) - electronical signal chain has been decoupled from mechanical and thermal effects → most of the systematic effects in the electronics (DBPMs) could be eliminated → cascaded feedback scheme (including photon BPMs and filling pattern FB) could be applied -  -focus beamlines remain a real challenge… and there will be many more in the (near) future - photon BPMs need more attention… new, better, more reliable monitors ?! and should be integrated in (F)OFBs… from the very beginning !!! - SLS DBPM system is a matured child of it’s time… but starting to get old → limited possibilities to extend (FEMTO, photon BPMs, etc…) → critical HW components are outdated… new concept based on VPC-board (B. Keil) - beamline data needs to be made available for machine and possibly integrated in (F)OFBs

Volker SchlottIWBS’04, Grindelwald, Report on internal „mini-workshop on beam stability at SLS” SLS PAUL SCHERRER INSTITUT R. UrsicLibera Electron Beam Position Processor G. RehmEBPMs and Orbit Feedback Electronics at DIAMOND B. KeilThe “Generic VME PMC Carrier Board” – Status and Perspectives of a Common Digital Platform for Beam Diagnostics and Feedbacks at PSI T. StraumannFast Orbit Feedback Electronics for SPEAR3 R. SteinhagenLarge Scale Orbit Correction for LHC J. BergozLatest Developments and What’s to Come in Beam Position Measurement Expectation…what can be expected from industry (present and future systems) as well as upcoming machines (DIAMOND, LHC, SPEAR3) as goal for beam stability to see, where are the achievements and where might be the short-comings Wish…to have a lively discussion about the most appropriate way to proceed for future machines and for upgrades of present machines Upcoming Session on Orbit Measurement and Correction…