Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting 07.11.08

Slides:



Advertisements
Similar presentations
BLM System for NSRL HLS PCaPAC 2000, Oct.9 ~ 12, 2000Page 1 PC and CAN Bus in Beam Loss Monitor System for NSRL Yonggang Cui, Beibei Shao Department of.
Advertisements

H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
RAL Front End Test Stand Overview, Status and Plans RAL 12 th January 2005 Alan Letchford, ISIS Injector Group.
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
Laser based Emittance Measurement for LINAC4 Project Overview & Current Status T. Hofmann, E. Bravin, U. Raich, F. Roncarolo, F.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
NuFACT06, Irvine 27. August 2006 The Front End Test Stand (FETS) is a collaborative project, between CCLRC (ISIS & ASTeC) and UK universities (Imperial.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Multi-colour sctintillator-based ion beam profiler James Green, Oliver Ettlinger, David Neely (CLF / STFC) 2 nd Ion diagnostic workshop June 7-8 th.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Douglas P. Moehs Emittance Probe 1 (side) Distance from slit to detector: inches Detector with multiple collectors Expected collector width based.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
Matching monitors for SPS and LHC E. Bravin 31 March 2011.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Developments of the FETS Ion Source Scott Lawrie.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
RICH Simulation in LHCb LHC Detector Simulation Workshop S.Easo, RAL, On behalf of LHCb–RICH group.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
CESR as Light Source David Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
FETS Laserwire Status David Lee
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ESS Front End diagnostic
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
The RAL Front End Test Stand
A 3D design model of the apparatus for the Laser Wakefield Acceleration of electrons at ELI-NP S. Balascuta1 , R. Dinca1 1) “Horia Hulubei” National.
The TV Beam Observation system - BTV
Laser-based Beam Diagnostics for the RAL Front End Test Stand
A. Martynov on behalf of accelerator division.
F.E.T.S. Mechanical Engineering Update
at Royal Holloway Univ. London
F. Zocca, F. Roncarolo, B. Cheymol, A. Ravni,
LINAC 4 source & LEBT measurement results
Status of the Front End Test Stand April 2007.
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
ERL BPM System Mike Billing, Mark Palmer
Status of muon monitor R&D and construction
XFEL bunch compressors
(Beam) Commissioning Plan
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Simon Jolly UKNFIC Meeting 25th April 2008
Presentation transcript:

Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting

David Lee 07/11/2008 Outline Introduction Vacuum Vessel Optics Detector > Field Map > Electronics Conclusion / Outlook Status of the FETS Laserwire Scanner 1

David Lee 07/11/2008 The Front End Test Stand Magnetic LEBT RFQ MEBT and chopper H − ion source Laser profile monitor Status of the FETS Laserwire Scanner 2

David Lee 07/11/2008 The Front End Test Stand Magnetic LEBT RFQ MEBT and chopper H − ion source Laser profile monitor Status of the FETS Laserwire Scanner 2

David Lee 07/11/2008 Photo-dissociate some of the H - ions Separate species using a dipole magnet − − − − − − −− −−− − − −− − − − − − − − − −− − − − − − Laser-based Beam Diagnostics: Principle for H − Collect the detached electrons Status of the FETS Laserwire Scanner 3

David Lee 07/11/2008 Photo-dissociate some of the H - ions Separate species using a dipole magnet − − − − − − −− −−− − − −− − − − − − − − − Collect the detached electrons −− − − − − − Laser-based Beam Diagnostics: Principle for H − Status of the FETS Laserwire Scanner 3

David Lee 07/11/2008 Photo-dissociate some of the H - ions Separate species using a dipole magnet − − − − − − −− −−− − − −− − − − − − − − − Collect the detached electrons −− − − − − − Laser-based Beam Diagnostics: Principle for H − Status of the FETS Laserwire Scanner 3

David Lee 07/11/2008 Photo-dissociate some of the H - ions Separate species using a dipole magnet − − − − − − −− −−− − − −− − − − − − − − − Collect the detached electrons −− − − − − − Laser-based Beam Diagnostics: Principle for H − Status of the FETS Laserwire Scanner 3

David Lee 07/11/2008 Photo-dissociate some of the H - ions Separate species using a dipole magnet − − − − − − −− −−− − − −− − − − − − − − − Collect the detached electrons −− − − − − − Laser-based Beam Diagnostics: Principle for H − Status of the FETS Laserwire Scanner 3

David Lee 07/11/2008 Photo-dissociate some of the H - ions Separate species using a dipole magnet − − − − − − −− −−− − − −− − − − − − − − − Collect the detached electrons −− − − − − − Laser-based Beam Diagnostics: Principle for H − Status of the FETS Laserwire Scanner 3

David Lee 07/11/2008 Steering the Laser Beam Status of the FETS Laserwire Scanner 4

David Lee 07/11/2008 Steering the Laser Beam Status of the FETS Laserwire Scanner 4

David Lee 07/11/2008 Vacuum Vessel Internals Installation Status of the FETS Laserwire Scanner 5

David Lee 07/11/2008 Optics Optical table constructed in R8 Simple optics design compete Gives reasonable performance in terms of laser diameter in the interaction region Reconstruction of overlapping measurements could overcome problems with laser performance Status of the FETS Laserwire Scanner 6

David Lee 07/11/2008 Vessel / Optics: To Do One of the plates from the tank internals needs modifying In the workshop today Re-installed next Wednesday Vacuum window to couple in the laser to be constructed Have some drawings showing how this could be done Complete laser safety requirements for RAL Interlocks / Screening Documentation Install laser and optics at RAL Alignment… Status of the FETS Laserwire Scanner 7

David Lee 07/11/2008 The Electron Detector (I) H −, H 0 Electrons Electron collector Magnet Copper accelerating sheath Status of the FETS Laserwire Scanner 8

David Lee 07/11/2008 The Electron Detector (II) Status of the FETS Laserwire Scanner 9

David Lee 07/11/2008 Detector Magnet Field Map (I) Status of the FETS Laserwire Scanner 10

David Lee 07/11/2008 Detector Magnet Field Map (II) Status of the FETS Laserwire Scanner 11 Magnet measured in opposite polarity to how it’s will be used & how it’s previously been tested  Discrepancy due to hysteresis

David Lee 07/11/2008 Detector Readout “Prototype”“Production” Status of the FETS Laserwire Scanner 12

David Lee 07/11/2008 Detector: To Do Test ‘production’ electronics Finish installation of detector Magnet Readout Power / data feed-thoughs Status of the FETS Laserwire Scanner 13

David Lee 07/11/2008 Reconstruction Software Test figure No overlap50 % (?) overlap Test figure Status of the FETS Laserwire Scanner 14

David Lee 07/11/2008 Conclusions and Outlook The FETS laserwire scanner is progressing (reasonably) well Installation should be complete by the end of the month Then *all* we need is a beam And then the fun really begins… Status of the FETS Laserwire Scanner 15

Backup Slides

David Lee 07/11/2008 H − Injection H − from Linac Circulating protons Stripping foil Status of the FETS Laserwire Scanner 16

David Lee 07/11/2008 The Need for Multiple (>2) Projections Status of the FETS Laserwire Scanner 17

David Lee 07/11/2008 The Need for Multiple (>2) Projections Status of the FETS Laserwire Scanner 17

David Lee 07/11/2008 The Need for Multiple (>2) Projections Status of the FETS Laserwire Scanner 17

David Lee 07/11/2008 The Need for Multiple (>2) Projections Status of the FETS Laserwire Scanner 17

David Lee 07/11/2008 Laser-based beam diagnostics principle for H − Photo-dissociate some of the H - ions Separate species using a dipole magnet − − − − − − −− −−− − − −− − − − − − − − − Collect the detached electrons −− − − − − − Rev. Sci. Instrum. 73, 998 (2002) Status of the FETS Laserwire Scanner 18

David Lee 07/11/2008 ADC Two channel, integrate and hold, 20-bit ADC Minimum sensitivity: −0.2–50 pC Expected signal size ~1 pC so in effect we have a ~ 14-bit ADC Status of the FETS Laserwire Scanner 19

David Lee 07/11/2008 ADC Protoboard DDC112 Clock In Atmel μprocessor RS232 to PC Input 1 Power in Range select jumpers Status of the FETS Laserwire Scanner 20

David Lee 07/11/2008 ADC Test Charge Resolution Status of the FETS Laserwire Scanner 21

David Lee 07/11/2008 The Need for Non-Destructive, Non-Interceptive Diagnostics Allows for online monitoring of the beam Status of the FETS Laserwire Scanner 22

David Lee 07/11/2008 The Need for Non-Destructive, Non-Interceptive Diagnostics Allows for online monitoring of the beam Prevents the beam damaging the instrument PlasticRuby P46 Status of the FETS Laserwire Scanner 22