Systems Analysis – ITEC 3155 Feasibility Analysis

Slides:



Advertisements
Similar presentations
Modern Systems Analyst and as a Project Manager
Advertisements

Chapter 3 Program Management and Project Evaluation Professor Hossein Saiedian McGraw-Hill Education ISBN
Systems Analysis & Design 7 th Edition Systems Analysis & Design 7 th Edition Toolkit 3.
Financial Analysis. Basic Elements Estimate Whole Life Costs Forecast Business Benefits and/or Revenues Estimate financial return on project investment.
Chapter 2 The Analyst as a Project Manager
Project Concept Formation Feasibility Studies & Reports Week 2
Project Concept Formation Feasibility Studies & Reports
Moving from Analysis to Design
Systems Analysis and Design in a Changing World, Fourth Edition
Initiating and Planning Systems Development Projects
Overview Unified Process (UP) development methodology
Lecture 7: the Feasibility Study
ISMT221 Information Systems Analysis and Design
Project Estimation Describe project scope, alternatives, feasibility.
Systems Analysis & Design Sixth Edition Systems Analysis & Design Sixth Edition Toolkit Part 3.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
The Analyst as a Project Manager
Feasibility Analysis Chapter 3
Chapter 5 Initiating and Planning Systems Development Projects
Chapter 3 The Analyst as a Project Manager
Systems Analysis and Design with UML Version 2
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
Systems Analysis and Design in a Changing World, Fifth Edition
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
ZEIT2301 Design of Information Systems Project Initiation School of Engineering and Information Technology Dr Kathryn Merrick.
CIS 321—IS Analysis & Design Chapter 3: The Analyst as a Project Manager.
Commerce 3KA3 System Analysis & Design
The Systems Analysis Toolkit
Project Management Development project artifacts (products)
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Project Feasibility Feasibility is the measure of how beneficial or practical the development of an information system will be to an organisation.
ABOUT SCORE SCORE - Service Corps of Retired Executives SCORE - Service Corps of Retired Executives Volunteer group works with SBA as counselors to America’s.
Conceptualizing & Initializing the IT Project
LECTURE 3: The Analyst as a Project Manager
Chapter 5 : Initiating and Planning Systems Development Projects.
Systems Analysis and Design Fourth Edition Introduction  A project is economically feasible if the future benefits outweigh the costs  The Systems Analyst’s.
PowerPoint Presentation for Dennis, Wixom, & Roth Systems Analysis and Design, 3rd Edition Copyright 2006 © John Wiley & Sons, Inc. All rights reserved.
© 2005 by Prentice Hall Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer.
2  Mission Statement.  Company’s overall purpose and direction, products, services and values.  Goals.  That accomplish the mission. E.g. 5 year plan.
Systems Analysis and Design in a Changing World, 5 rd Edition Chapter 3: The Analyst as a Project Manager.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 8 Moving from Analysis to Design.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Project Planning Activities Project Schedule Risks Management and Project Feasibility Financial Calculations Tangible.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph.
1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.
ITEC 4010: Systems Analysis and Design II.
Systems Analysis and Design in a Changing World, Fifth Edition
Cis339 Modern Systems Analysis and Design Fifth Edition Chapter 5 Initiating and Planning Systems Development Projects 5.1.
Feasibility Analysis for a Software Project Dr. Pedro Mejia Alvarez Seccion de Computacion, CINVESTAV-IPN.
Lecture 51 Project Costing Lecture 52 Objectives Define economic feasibility Identify the cost considerations that analysts consider throughout the SDLC.
Definition  Cost-benefit analysis is a systematic approach to estimating the strength and weakness of alternatives that satisfy transactions, activities.
Slide 1 Software Construction Software Construction Lecture 3.
1 We have seen how a systems development project can be divided into the phases of the Systems/Software Development Life Cycle (SDLC):  Problem Definition.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Accounting systems design & evaluation 9434SB 18 March 2002.
Slide 1 Systems Analysis and Design with UML Version 2.0 An Object-Oriented Approach, Second Edition Chapter 3: Project Initiation.
Project Estimation Describe project scope, alternatives, feasibility.
Project Evaluation and Programme Management
Chapter 5 Initiating and Planning Systems Development Projects
Factors to consider System component costs Methods
Systems Analysis and Design in a Changing World, 4th Edition
Chapter 6 Initiating and Planning Systems Development Projects
Project Initiation Chapter 2.
THE FEASIBILTY STUDY LECTURE-5.
Business System Development
Lecture 5: Feasibility Study
Chapter 5 Initiating and Planning Systems Development Projects
Chapter 5 Initiating and Planning Systems Development Projects
Chapter 6 Initiating and Planning Systems Development Projects
Presentation transcript:

Systems Analysis – ITEC 3155 Feasibility Analysis

What is Feasibility Analysis? A measure of how beneficial or practical the development of an information systems will be to an organization. Feasibility Analysis The process by which feasibility is measured. The goal of feasibility analysis: To enable the organization to determine whether or no to proceed with a project To identify any important risks associated with the project Systems Analysis and Design in a Changing World, 4th Edition

Confirming Project Feasibility Risk management Economic feasibility Cost/benefit analysis Sources of funds (cash flow, long-term capital) Organizational and cultural feasibility Technological feasibility Schedule feasibility Resource feasibility Systems Analysis and Design in a Changing World, 4th Edition

Risk Management Systems Analysis and Design in a Changing World, 4th Edition

Economic Feasibility An economic feasibility analysis (or cost-benefit analysis) should be performed to identify the financial risk associated with the project Estimate project development costs Estimate operational costs after project Estimate financial benefits based on annual savings and increased revenues Calculate using table of costs and benefits Uses net present value (NPV), payback period, return on investment (ROI) techniques Systems Analysis and Design in a Changing World, 4th Edition

Supporting Detail for Salaries and Wages for RMO (Figure 3-16) Systems Analysis and Design in a Changing World, 4th Edition

Summary of Development Costs for RMO (Figure 3-17) Systems Analysis and Design in a Changing World, 4th Edition

Summary of Annual Operating Costs for RMO (Figure 3-18) Systems Analysis and Design in a Changing World, 4th Edition

Sample Benefits for RMO (Figure 3-19) Systems Analysis and Design in a Changing World, 4th Edition

RMO Cost Benefit Analysis (Figure 3-20) Systems Analysis and Design in a Changing World, 4th Edition

Intangibles in Economic Feasibility Intangible benefits cannot be measured in dollars Increased levels of service Customer satisfaction Survival Need to develop in-house expertise Intangible costs cannot be measured in dollars Reduced employee morale Lost productivity Lost customers or sales Systems Analysis and Design in a Changing World, 4th Edition

Organizational and Cultural Feasibility Each company has own culture New system must fit into culture Evaluate related issues for potential risks Low level of computer competency Computer phobia Perceived loss of control Shift in power Fear of job change or employment loss Reversal of established work procedures Systems Analysis and Design in a Changing World, 4th Edition

Technological Feasibility The goal to assess the extent to which the system can be successfully designed, developed and installed Does system stretch state-of-the-art technology? Does in-house expertise presently exist for development? Does an outside vendor need to be involved? Solutions include Training or hiring more experienced employees Hiring consultants Changing scope and project approach Systems Analysis and Design in a Changing World, 4th Edition

Schedule Feasibility Estimates needed without complete information Management deadlines may not be realistic Project managers Drive realistic assumptions and estimates Recommend completion date flexibility Assign interim milestones to periodically reassess completion dates Involve experienced personnel Manage proper allocation of resources Systems Analysis and Design in a Changing World, 4th Edition

Resource Feasibility Team member availability Team skill levels Computers, equipment, and supplies Support staff time and availability Physical facilities Systems Analysis and Design in a Changing World, 4th Edition

Summary Feasibility analysis Feasibility has many facets aims to determine whether an organization should proceed with a project; identify important risks. Feasibility has many facets technical, economic, organizational/cultural, schedule, resource. Systems Analysis and Design in a Changing World, 4th Edition