Piloting the Use of Country Systems in World Bank-supported operations Working for a world free of poverty.

Slides:



Advertisements
Similar presentations
1 The PEFA Program – and the PFM Performance Measurement Framework Washington DC, May 1, 2008 Bill Dorotinsky IMF.
Advertisements

Options appraisal, the business case & procurement
+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
Building Statistical Capacity To Monitor Development Progress World Bank Development Data Group.
Use of Country Systems Consultations on the Draft Methodology for Use of Country Procurement Systems.
World Bank Financial Management Sector September 2010.
1 Professionalising Programme & Project Management Developing programme & project management capacities for UNDP and national counterparts External Briefing.
TECHNICAL VOCATIONAL EDUCATIONAL AND TRAINING COLLEGES AN INTRODUCTION TO THE IMPEMENTATION OF A COMPLIANT RISK MANAGEMENT PROCESS July 2014.
World Bank’s new methodology In Country procurement assessment World Bank’s Methodology for Procurement laws: back to country systems?
Eurasian Corporate Governance Roundtable
ITIC PERSPECTIVE ON THE EFFECTIVE IMPLEMENTATION OF THE FCTC PROTOCOL ELIZABETH ALLEN ITIC – JULY 2014.
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
Assessing Statistical Systems Graham Eele – World Bank, Development Data Group.
The Sixth Annual African Consumer Protection Dialogue Conference
Adviser, Ministry for State Reform, Lebanon
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
1 Fostering Aid Effectiveness: Program-Based Approaches and What it means for Procurement? Presented by Jocelyn Comtois May International Conference.
PRESENTED BY: RAHIMA NJAIDI MJUMITA 3 RD APRIL 2012.
1 Inter-American Development Bank Environment and Safeguards Policy - A Strategic Overview.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU 2 nd SIGMA NETWORKING SEMINAR OECD Conference Centre Paris.
3 rd meeting of the DAC Joint Venture on Procurement, Tanzania, 6 May 2008 Draft OECD Recommendation on Enhancing Integrity in Public Procurement Elodie.
Assessing the Capacity of Statistical Systems Development Data Group.
European Commission Joint Evaluation Unit common to EuropeAid, Relex and Development Methodology for Evaluation of Budget support operations at Country.
PUBLIC PROCUREMENT SYSTEM IN TAJIKISTAN RAVSHAN KARIMOV AGENCY FOR PUBLIC PROCUREMENT UNDER THE GOVERNMENT OF THE REPUBLIC OF TAJIKISTAN.
WSSB Capacity Enhancement Workshops 1 Session 2: Legal & Institutional Background for Management of Small-Town Water Systems.
The Strengthened Approach to Supporting PFM reforms Applying the PFM Performance Measurement Framework Washington, D.C., January 17-18, 2007 Bill Dorotinsky.
A short introduction to the Strengthened Approach to supporting PFM reforms.
TRAINING PROGRAM PROCUREMENT GUIDELINES IMPORTANT ASPECTS 1.
Page 1 Budget Execution and Financial Accountability Course January 10-12, 2005 Country PFM Performance Measurement and Monitoring Nicola Smithers PEFA.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
Information Overview SF: Planning & Programming Workshops for EC Delegation Patrick Colgan & Ján Krištín PROGRAMMING PROCEDURES in Support of Regional.
1 Use of Country Procurement System (UCS) HIGH LEVEL PROCUREMENT FORUM V. S. (Krish) Krishnakumar Regional Procurement Manager Africa Region - The World.
Cross-Border Supervisory Cooperation under Basel II and the Revised Basel Core Principles 6th Annual International Seminar on Policy Challenges for the.
More Timely, Credible and Cost Effective Performance Information on Multilateral Partners Presented by: Goberdhan Singh Director of the Evaluation Division.
AFR Observatory on monitoring and evaluating procurement reform programs Working for a world free of poverty.
December Why Program-for-Results (PforR)? Development Effectiveness and Client Demand – PforR responds to client demand that could not be fully.
Procurement in SWAps Seminar on Procurement of Goods, Works and Consultancy Contracts financed from World Bank Loans and IDA Credits, February 27 - March.
Strategic approach to national implementation programmes for SEEA by UNSD Sixth Meeting United Nations Committee of Experts on Environmental Economic Accounting.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
Baseline Indicators and Performance Measurement Framework for Procurement Regional Workshop on Procurement Capacity Development Lima, Peru April.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
The PEFA Framework – a tool for monitoring government performance ICGFM – New Developments in Governmental Financial Management Miami, May 19-22, 2008.
Overview of Environmental Management Systems Using ISO John Rupe Forest Service Rocky Mountain Region.
Project: EaP countries cooperation for promoting quality assurance in higher education Maria Stratan European Institute for Political Studies of Moldova.
2nd Global Procurement Conference | 4-5 July 2017
Inter-American Development Bank
Cambodia National Work Plan
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Our Understanding of Institution/Capacity Building
PROCUREMENT FIDUCIARY ARRANGEMENTS IN SECTOR-WIDE APPROACHES (SWAps)
Workshop on the Strengthened Approach to Supporting PFM Reform
Use of Country Systems: Consultations on the Draft Methodology for Use of Country Procurement Systems Elective Session 2nd Africa Region Education Capacity.
Asha Ayoung Lead Procurement Specialist, OPCPR
Setting Actuarial Standards
The role of the Passport Indicators in Monitoring PFM Strategy
SWAPs: Based on Lessons Mainly from Morocco and Zambia
Business in Partnership Against Corruption
Sustainable Transition / Handover of malaria TB and HIV Global Fund Grants Generic 2018.
Institutional Framework, Resources and Management
Statistics Governance and Quality Assurance: the Experience of FAO
PROCUREMENT POLICIES AND GUIDELINES
OECD - MAPS Methodology for Assessment of Procurement Systems - Assessment Tool Arun Kumar Kolsur Senior Procurement Specialist January 13, 2019.
Taking the STANDARDS Seriously
The Strengthened Approach to Supporting PFM reforms
National Disaster Risk Management Fund
Good practices for risk assessment and control activities
Africa Centers of Excellence (ACE II) Project Financial & Disbursement Management NAIROBI, May 13 14,2019.
Presentation transcript:

Piloting the Use of Country Systems in World Bank-supported operations Working for a world free of poverty

Presentation Overview  Background  Methodology  Process  Outcomes Working for a world free of poverty

Background  Building strong national institutions >>> effective systems and sound capacity >>> fundamental aspect of the development process >>> Bank and Countries’ development efforts;  Strengthening country procurement systems is core to improving the development effectiveness of public expenditure, whether it be financed with taxes, with World Bank funds, or with resources from other partners;  The challenge is >>> bring together the Bank’s diagnostic tools, its capacity-building support and advice, and its project design and implementation skills to support such efforts; Working for a world free of poverty

Background  The Executive Directors discussed the question of the use of country systems (UCS) for procurement under Bank-supported operations on June 19, 2007;  A wide and substantive process of external consultations began in mid-September 2007 and ended in early January 2008 with stakeholders in 78 member countries;  A proposed piloting program was adopted by the Board of Directors on April 24, Working for a world free of poverty

Process for the piloting program  Three (3) stages: –Stage I: Select a pool of candidate countries & assess quality of procurement systems (country level); –Stage II: Assess consistency & equivalence with principles of Bank procurement policies (country level); –Stage III: Measure compliance, performance, capacity and fiduciary risks (sector/executing agency level). Working for a world free of poverty

Process Working for a world free of poverty

Stage I 4 pillars 12 baseline indicators 54 sub- indicators

Stage I: Selection of a Pool of Candidate Countries  To pass stage I, an assessment based on the OECD/DAC 54 sub-indicators would follow a detailed procedure (INSERT SLIDES here) and would rely on: –(a) 17 core sub-indicators which should be assessed to meet the criteria of the corresponding benchmarks indicated for a “ 3 ” rating; –(b) 10 sub-indicators which could be assessed to only meet the criteria of the corresponding benchmarks indicated for a “ 2 ” rating, provided the country agrees to put in place an action plan of corrective measures to bring those sub-indicators to a “ 3 ” benchmark rating during implementation; –(c) 25 sub-indicators which should be assessed to meet the criteria of the corresponding benchmarks indicated for a 2 ” rating; and –(d) 2 sub-indicators (4-d and 10-e, regarding respectively the regulatory body and the complaints review body) for which only a “ 3 ” or “ 0 ” rating can be obtained. If the country does not fully meet these criteria but would otherwise qualify, corrective measures could be included in the action plan. Details

Stage II  Working for a world free of poverty

Stage II: Consistency and Equivalence with Bank Procurement Policies  Stage II in would determine whether the procurement policies and procedures of potential pilot countries are consistent with and equivalent to the principles of the Bank ’ s procurement policies.  The methodology >>> If procurement under the country ’ s policies achieves substantially the same results as procurement under the Bank ’ s policies.  Assessment of equivalence is conducted at the country level>>> the selection of executing agencies of pilot projects will also rely on compliance and performance indicators, some of which are based on Bank guidelines and SBDs;  The Bank would carry out a step-by-step comparison of the country ’ s bidding procedures and documents with the Bank ’ s ICB requirements that apply when international competition is sought for goods, works, and non-consulting services;  To pass stage II, the Bank will: –review equivalence of the country procurement institutional and legal framework vis-a-vis the relevant provisions of Section I (eligibility, in particular with regard to government-owned enterprises, and prevention of mandatory joint ventures) and all provisions of Section II of the Bank procurement guidelines; –assess the bidding documents to be used under pilot projects when international competition is anticipated against the Bank Standard Bidding Documents (SBDs) and harmonized Master Procurement Documents (MPDs) on the basis of a checklist of applicable clauses derived from the table of cross- harmonized clauses of the MPDs for Works, Goods, and Supply and Install. Details

Stage III Working for a world free of poverty

Stage III: Assessment at the Sector/Project Level Working for a world free of poverty  The Bank would then move to an assessment of compliance, performance, capacity, and fiduciary risks of the executing agencies of the proposed pilot projects;  The assessment should be centered on those areas, sectoral or regional, in which the Bank ’ s lending program is expected to focus;  Steps: –Initial Identification of Pilot Projects and agency Assessment; –Compliance and Performance Assessment: Agency Compliance with Legal Obligations; Performance Monitoring –Capacity and Fiduciary Risks Assessment: Capacity Fiduciary Risks. –Additional Considerations Details