Stability issues in CTF3 and their relevance for CLIC. Phase feed-forward. Piotr Skowronski (1), Tobias Persson (1), Alexey Dubrovskiy (1), Guido Sterbini.

Slides:



Advertisements
Similar presentations
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
Advertisements

ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
RF Synchronisation Issues
Spontaneous Radiation at LCLS Sven Reiche UCLA - 09/22/04 Sven Reiche UCLA - 09/22/04.
Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURING AND EXPERIMENTAL PROGRAM C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT),
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Direct Wakefield measurement of CLIC accelerating structure in FACET Hao Zha, Andrea Latina, Alexej Grudiev (CERN) 28-Jan
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
Drive Beam Linac Stability Issues Avni AKSOY Ankara University.
CLIC Drive Beam Beam Position Monitors International Workshop on Linear Colliders 2010 Geneva Steve Smith SLAC / CERN
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
R&D Programme for RT Phase Feedback Giulio Morpurgo.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
B EAM STEERING EXPERIENCE AT CTF3 Davide Gamba 14 June 2014 Americas Workshop on Linear Colliders Fermilab.
PROPOSAL G.I.A.F. (HYBRID GUN AT HIGH FREQUENCY) INFN-LNF – UNIVERSITY OF ROME “LA SAPIENZA”- UCLA D. Alesini (T), M. Ferrario (R), A. Gallo (T),
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Femtosecond phase measurement Alexandra Andersson CLIC Beam Instrumentation workshop.
Microwave Devices.
1 EuroTeV High Bandwidth Wall Current Monitor Alessandro D’Elia AB-BI-PI.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Oleksiy Kononenko CERN and JINR
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Tools in CTF3 Simona Bettoni for the CTF3 operation team.
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
Direct Wakefield measurement of CLIC accelerating structure in FACET Hao Zha, Andrea Latina, Alexej Grudiev (CERN) 18/06/2015 High Gradient work shop 2015.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
WFM electronics Alexandra Andersson. F. Peauger – CTF3 committee – 11/02/10  Wakefield Monitors implemented in two accelerating structures TD24 (tank.
C. Biscari, D. Alesini, A. Ghigo, F. Marcellini, LNF-INFN, Frascati, Italy B. Jeanneret, CERN, Geneva, Switzerland CLIC DRIVE BEAM FREQUENCY MULTIPLICATION.
CLIC 09 Workshop - C. Biscari C. Biscari, D. Alesini, A. Ghigo, F. Marcellini, LNF-INFN, Frascati, Italy B. Jeanneret, F. Stulle, CERN, Geneva, Switzerland.
Phase Feed-Forward Piotr Skowroński (CERN)
Abstract EuSPARC and EuPRAXIA projects
Steering algorithm experience at CTF3
CLIC Workshop 2016: Main Beam Cavity BPM
CLIC Damping ring beam transfer systems
CTF3 kicker activities at CIEMAT
F.Marcellini, D.Alesini, A.Ghigo
CLIC Drive Beam Stabilisation
Phase Feedforward in 2015 & Plans for 2016
I Alexander Nass for the JEDI collaboration
PEPX-type BAPS Lattice Design and Beam Dynamics Optimization
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

Stability issues in CTF3 and their relevance for CLIC. Phase feed-forward. Piotr Skowronski (1), Tobias Persson (1), Alexey Dubrovskiy (1), Guido Sterbini (1), Fabio Marcellini (2), David Alesini (2), Andrea Ghigo (2), Igor Syratchev (1), Alexandra Andersson (1) _________ (1) CERN (2) INFN/LNF, Frascati, Italy (2) INFN/LNF, Frascati, Italy

CTF3 stability CTF3 was build from LIL/EPA hardware  It is not well adjusted to the CTF3 needs, especially in terms of stability Klystrons are running at the limits of their capabilities RF pulse compression system is used So, the stability of CTF3 is the issue However, we attempt to place countermeasures to achieve as stable beam as we can During the last run we have introduced a system to monitor the CTF3 stability  Helps to keep the machine in the reference state  Allows to find the devices that introduce drifts or jitter 2 6 th CLIC-ACE 3 Feb 2011

The beam current stability Beam current in Linac  Mean over 1  s 3 6 th CLIC-ACE 3 Feb 2011

The beam current stability Beam current in Linac – zoom  Mean over 1  s 4 6 th CLIC-ACE 3 Feb 2011

The beam current stability CT Line  Mean over 1  s 5 6 th CLIC-ACE 3 Feb 2011

The beam current stability Delay Loop  Mean over 1  s 6 6 th CLIC-ACE 3 Feb 2011

The beam current stability Combiner Ring  Mean over 1  s 7 6 th CLIC-ACE 3 Feb 2011

The beam current stability TL2  Mean over 0.1  s 8 6 th CLIC-ACE 3 Feb 2011

Short Term Current Stability It is calculated over 20 minutes were no major drift was observed Quoted values are Gaussian fits to the normalized residuals Factor 4 recombination is more stable  Sub-harmonic bunchers are not used  Delay Loop (and its RF deflector) is not used in this case This data represent CTF3 stability as it was towards the end of the last run  The stability monitoring system was put in place only in autumn  With more careful setup better results are achieved 9 6 th CLIC-ACE 3 Feb 2011

Linac The measured beam current stability in the linac is 2.5×10 -4  A single BPM measurement is on average around 5×10 -4  We are reaching limits of our BPMs precision The quoted value is obtained taking the sum of all linac BPMs 10 6 th CLIC-ACE 3 Feb 2011

Recombined Beam Factor 4 recombined beam reaches current stability of 2.5x10 -3 Improved linac stability thanks to  Better gun electronics  Feed-back on cathode voltage  Use of all BPMs to calculate the value, and over full length of the pulse There is still plenty of room for improvements, and we believe it will be possible to reach the CLIC goal in CTF3  The beam energy spread will be decreased For example, by more clever adjustments of the phase lags in the injector  This way we will be able to use the collimator in the compressor chicane in a more efficient way  It will remove energy and energy spread variation along the pulse  Closure in the transverse planes can be still improved in the rings  Chromaticity and non-linear dispersion will be corrected with sextuples reducing the emittance growth  Last year we have put in place tools for stability monitoring The gathered data shall reveal all the important sources of jitter and drifts Appropriate corrections or feed-backs will be put in place 11 6 th CLIC-ACE 3 Feb 2011 PositionMean [A]Std. Dev. [A]Variation [%] Compressor (new: 0.025) CR (x4) DL CR (x8)

Introduced Feedbacks Feed-backs are already put in place for the main sources of the beam drift  RF phase stabilization for all klystrons and TWTs  Ambient temperature feed-back for RF compression  Feed-back on the voltage of the gun cathode 12 6 th CLIC-ACE 3 Feb 2011 Compensated phase variation = 10 deg over 10 hours Residual phase variation = 2 deg, σ~ 0.4 deg Cathode voltage stabilization Compressed power variation Klystron phase stabilization

Finding sources of the beam jitter and drift The data gathered by the CTF3 Monitor allows to find correlations between the beam and readouts of particular devices  It has confirmed that the beam energy stability is the most important issue and it is driven by the RF fluctuations  We attempt to Stabilize the responsible devices where it is possible Otherwise, implement or improve the feed-backs 13 6 th CLIC-ACE 3 Feb 2011 Beam current in CLEX pos in the first dispersive pickup Beam current in CLEX phase of klystron 3

Phase feed-forward The stability of the produced 12 GHz RF is at the moment at the level of 5°  Adjustments of the optics should improve it at least factor 4 At CLIC, the phase stability of the drive beam with respect to the main beam should be better than 0.1° at 12GHz  To reach it, a feed-forward mechanism is necessary, made of phase monitors and kickers that change TOF in a chicane  It development its ongoing and it will be tested in CTF th CLIC-ACE 3 Feb 2011 F.Marcellini, D.Alesini, A.Ghigo (INFN/LNF Frascati)

The beam phase monitor Mechanical design of the pick-up has been completed and a prototype will be soon realized to check the simulation results and test fabrication techniques.  The 12 GHz resonant response of the system at the operating TM01 mode is established placing the notch filters both sides of the pick-ups  It is detuned by 200MHz to reduce the signal strength The electronics is already implemented for 30GHz detection and it has to be only transferred to 12GHz. Design of the kickers has not yet started, but most probably they will follow the concepts developed for the DAFNE injection kickers with tapered strip-lines. Their realization has been already funded th CLIC-ACE 3 Feb 2011 F.Marcellini, D.Alesini, A.Ghigo (INFN/LNF Frascati)

Conclusions The beam current at the end of the linac is very stable and it meets the CLIC requirement This should be also achieved for the recombined beam soon The drive beam phase feed-forward is under development and the system will be tested in CTF3  The phase monitor prototype is being fabricated  The appropriate kicker will follow soon It will be extremely hard to reach all CLIC stability specs in CTF3  Its hardware was not designed for that  However, we have had already positive surprises, might be there will be more 16 6 th CLIC-ACE 3 Feb 2011

Backup Slides 17 6 th CLIC-ACE 3 Feb 2011

CLIC Drive Beam Phase Monitor Fabio Marcellini, David Alesini, Andrea Ghigo (INFN/LNF, Frascati, Italy) Igor Syratchev, Alexandra Andersson (CERN, Geneva, Switzerland)

GENERAL CONSIDERATIONS Overall CLIC layout and the placement of the detectors (green cylinders) in the turnarounds. In two beam accelerator scheme the RF power produced in the deceleration of an high current electron drive beam (DB), is sent to 12 GHz RF sections to accelerate the Main Beam (MB). Synchronization of DB respect to MB is mandatory to keep constant the main linac effective gradient and then MB energy. Single bunch RMS energy spread is s E /E≈3.5x For relative energy variation s jitt /E<4x10 -3, the corresponding effective gradient error is DG/G≈4x10 -3 and the coherent error of the RF phase all along the main linac has to not exceed about 0.1 o. F.Marcellini (INFN/LNF Frascati)

MONITOR ELECTROMAGNETIC DESIGN The beam induced signal is coupled out of the beam pipe through 4 slots equally distributed along the pipe circumference. The slot cut-off frequency is >12GHz then the field intensity at the slot end can be adjusted properly tuning the slot thickness (d) and aperture. A waveguide is then connected to each slot aperture, followed by a transition to a 50Ω coaxial line (SMA standard). A commercial vacuum feedthrough (MSSI part #853872) is placed in the coaxial section. Pick-up design d Cut view of the waveguide pick- ups Waveguide to coaxial transition: reflection frequency response. F.Marcellini (INFN/LNF Frascati)

Rejection of RF noise and beam generated wake fields, at least in the detection frequency range, is done by notch filters. The notch filter is realized as a bump in the beam pipe. The dimensions of this bump are chosen to reject the 12GHz frequency component of the noise. Transmission response of stop-band filter for the TM 01 mode S 21 [dB] The most suitable place for installing and testing the monitor prototype is the CTF3 drive beam chicane region. The pipe radius has been reduced down to 11.5 mm, to limit to only 2 modes (TE 11 and TM 01 ) propagation at 12 GHz. V1+V2+V3+V4 ≠ 0, TM01 = 0, TE11 This property can be used as a primary mean to reject TE 11 Rejection of RF noise and wakefield TE11TM01 MONITOR ELECTROMAGNETIC DESIGN F.Marcellini (INFN/LNF Frascati)

The filter “closed” volumeThe filter “closed” volume The 12 GHz resonant response of the system at the operating TM 01 mode is established placing the notch filters both sides of the pick-ups, thus providing a kind of closed volume, where the beam generated electromagnetic fields can build up resonantly in the frequency range of the filter rejecting band. MONITOR ELECTROMAGNETIC DESIGN Within this frequency range the resonating mode can be excited, if the distance between the two notches is equivalent to the integer number (n) of the given mode half wavelengths. The amplitude of the signal coupled out can vary from zero (even n), to its maximum (odd n). This condition has been used to set up the amplitudes of the spurious (TE 11 ) mode as close as possible to its minimum. F.Marcellini (INFN/LNF Frascati)

On the other side, keeping the resonant conditions of the detecting TM 01 close enough to its maximum (odd n) the typical values obtained from the simulations are Q=7000 and R=60kΩ for a structure build of aluminium. The needs for the drive beam time sampling resolution and the overall restriction for RF power extraction from the drive beam require reducing both the Q-factor and the impedance values. Monitor shunt impedance (vertical scale in Ohm): no coupling, solid lines, waveguide coupling (  =5.6 at 12 GHz), dashed lines. Notch frequency response (solid, red) Q-factor and impedance MONITOR ELECTROMAGNETIC DESIGN To reduce Q-factor and impedance: Building of the stainless steel, both the Q- factor and the impedance can be reduced by about a factor of 6; Coupling the resonating fields to the special external loads, or increasing the coupling to the pick-up waveguide network. Appropriate changing of the distance between the notches. In the last case, the resonant frequency of the operating TM 01n mode can be shifted to a different frequency, where the filter has lower rejection, thus the fields are less sharply contained in the notch delimited volume. The amount of extracted beam power is rather reduced, but still could be enough to detect the proper signal. F.Marcellini (INFN/LNF Frascati)

MONITOR ELECTROMAGNETIC DESIGN Q=290 Detuning the resonance frequency of about 200MHz, Q L =290 has been obtained. F.Marcellini (INFN/LNF Frascati) 3 Feb th CLIC-ACE

MONITOR MECHANICAL DESIGN The mechanical design of the monitor has been also completed. The manufacture of a stainless steel prototype is in progress. F.Marcellini (INFN/LNF Frascati) 3 Feb th CLIC-ACE

Oscillator timing jitter and beam path filtering. Very high resolution and very stable phase reference are required to the detection electronics. The performance is limited chiefly by device non- linearity and noise. With higher input power, both linearity and noise increase. A parallelization strategy will be used. The input signals from both the local oscillator and phase monitor will be split N ways, and detected on N mixers. The baseband signals will then be added together for an increase in signal to noise ratio. The second order term is the dominant non- linear term. An operating point where its contribution is small enough will be chosen. In the context of XFEL construction femto-second stabilized reference lines are now available over about 1 km. The possibility of extension over 24 km from the central distribution point cannot yet be inferred. However, in CLIC an alternate phase reference, using low phase noise local oscillators (5 fs integrated timing jitter), synchronized to the outgoing main beam rather than a central timing reference, is possible. The time between the passage of the outgoing main beam and the arrival of the drive beam (and the main beam again) is at most 160 µs. DETECTION ELECTRONICS Mixer linearity measurements, second order term. F.Marcellini (INFN/LNF Frascati)

CONCLUSIONS The monitor to be used in the feed-forward chain to control the synchronization between Main Beam and Drive Beam in CLIC has been conceived and designed to get, at the same time, the desired resolution, low coupling impedance and noise rejection. The pick-up mechanical design has been completed and a prototype will be soon realized to check the simulation results and test fabrication techniques. The electronics, already realized in case of 30GHz detection, has to be transferred at 12GHz. Design of the kickers has not yet started, but they will probably follow the concepts developed for the DAFNE injection kickers with tapered striplines. Their realization has been already funded. The whole system will be tested in CTF3. F.Marcellini (INFN/LNF Frascati) 3 Feb th CLIC-ACE

Horizontal 28 6 th CLIC-ACE 3 Feb 2011

Vertical 29 6 th CLIC-ACE 3 Feb 2011