Modeling and Optimization of Aggregate Production Planning – A Genetic Algorithm Approach B. Fahimnia, L.H.S. Luong, and R. M. Marian.

Slides:



Advertisements
Similar presentations
Optimization problems using excel solver
Advertisements

Strategic Decisions (Part II)
1 An Adaptive GA for Multi Objective Flexible Manufacturing Systems A. Younes, H. Ghenniwa, S. Areibi uoguelph.ca.
Linear Programming Problem
Scheduling.
Topics to be Covered 1. Capacity Planning
CAPACITY LOAD OUTPUT.
Aggregate / Production Planning
IES 371 Engineering Management Chapter 14: Aggregate Planning
PRODUCTION AND OPERATIONS MANAGEMENT
Operations Management Dr. Ron Lembke
19–1. 19–2 Chapter Nineteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
1 Inventory Control for Systems with Multiple Echelons.
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
1 By: Prof. Y. Peter Chiu By: Prof. Y. Peter Chiu 9 / 1 / / 1 / 2010 Advanced P.O.M. Chap. 3 Aggregate Planning.
Strategic Capacity Planning & Aggregate Planning
Multi-scale Planning and Scheduling Under Uncertain and Varying Demand Conditions in the Pharmaceutical Industry Hierarchically Structured Integrated Multi-scale.
Operations Management
Dynamic lot sizing and tool management in automated manufacturing systems M. Selim Aktürk, Siraceddin Önen presented by Zümbül Bulut.
Linear and Integer Programming Models
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Operations Planning Horizons
Reliability-Redundancy Allocation for Multi-State Series-Parallel Systems Zhigang Tian, Ming J. Zuo, and Hongzhong Huang IEEE Transactions on Reliability,
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Aggregate Production Planning (APP) Slide Set #8.
Product Mix Problem Monet company makes four types of frames.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Ardavan Asef-Vaziri Systems and Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Aggregate Planning.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
MGTSC 352 Lecture 14: Aggregate Planning WestPlast Case H ow to deal with multiple objectives How to use binary variables AltaMetal Case Aggregating into.
Chapter 1 Introduction n Introduction: Problem Solving and Decision Making n Quantitative Analysis and Decision Making n Quantitative Analysis n Model.
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
1 Inventory Control with Time-Varying Demand. 2  Week 1Introduction to Production Planning and Inventory Control  Week 2Inventory Control – Deterministic.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Production Scheduling for the McGuiness & Co. Microbrewery.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Chapter 12 With Woodruff Modification Sales and Operations Planning – Aggregate Planning Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights.
Production Planning.  What to produce  When to produce  How to produce.
Chapter 14 Aggregate Planning.
Balancing of Parallel Two-Sided Assembly Lines via a GA based Approach
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Bin Packing Optimization
13 Aggregate Planning.
Linear Programming Objectives: Set up a Linear Programming Problem
Fundamentals of Production Planning and Control
Capacity Planning.
Dr Sh Salleh bin Sh Ahmad
Planning and Scheduling in Manufacturing and Services
Aggregate Production Planning (APP)
Presentation transcript:

Modeling and Optimization of Aggregate Production Planning – A Genetic Algorithm Approach B. Fahimnia, L.H.S. Luong, and R. M. Marian

Nama Kelompok 4 Aderia Bagus P Cahyan Hendy P Dhanis Ulan N. S Oni Agustina Puput Windasari

REVIEW JURNAL In the journal discusses the aggregate production planning model and describes the development of GA to the problem of APP with the conditions found in an industrial context

Abstract The Aggregate Production Plan (APP) is a schedule of the organization’s overall operations over a planning horizon to satisfy demand while minimizing costs. It is the baseline for any further planning and formulating the master production scheduling, resources, capacity and raw material planning.

Introduction AGGREGATE Production Plans (APP) concern about the allocation of resources of the company to meet the demand forecast. Optimizing the APP problem implies minimizing the cost over a finite planning horizon.

Literatur Review In 1998, the APP problem was solved using Mixed Integer Programming and considering different optimization criteria, including revenue maximization as well as inventory, backorder and set-up cost minimization. GA, fuzzy logic and stochastic programming have been among the most popular ones.

The combination of factors simultaneously affecting the quality of the APP is a characteristic of real-life problems and their consideration can make the difference between a purely academic treatment of the subject and a result that can be applied or transferred immediately in practice.

RESEARCH METHODOLOGY In developing the methodology for modeling and optimizing the APP a number of strategies can be and were considered: Strategy 1: fill the requirements using overtime – workers Strategy 2: fill the un-met requirements using external contractors – is a lean, outsourcing strategy in regards to keeping inventory, reducing, at the same time the workforce available to a minimum;

Strategy 3: fill requirements using up to the equivalent of a given number of weeks output in inventory, by minimizing at the same time the variation of workforce. This strategy can also minimize the use of contractors, taking advantage properties of keeping inventory to increase or keep a service level

MODELING OF THE APP PROBLEM As a realistic model is sought for the APP problem, a complex combination of conditions is applied. The list of variables is by no means exhaustive, but it incorporates many decisions variables, economies of scale, hard constraints and costs A. Variables: Planning data, Labor costs, Personnel policy, Plant running costs, Inventory policy

B. Constraints The assumptions listed below are implemented as a list of feasibility constraints. Violating any of these constraints would produce an infeasible solution: 1. The company works at least Nw hours each week 2. The company has to deliver all products corresponding to the demand each week (service level 100%); 3. All excess products will be stored in inventory

CHROMOSOME ENCODING The chromosome encoding is presented with relation to the case study below. The chromosomes encode the solutions of the problem, in this case assembling the independent variables of the problem – namely the number of workers employed and the number of hours worked each period.

THE GENETIC ALGORITHM The structure of the GA is classic,with genetic operators adapted to the particularities of the problem. Instead of working with strings, they are tailored to work with arrays. They are illustrated in the following sections. 1. Handling Constraints 2. Crossover 3. Mutation 4. Evaluation 5. Selection

CONCLUSION A complex and realistic model for the optimization of the APP has been developed. It incorporates the most important constraints and costs currently encountered in a manufacturing company. The GA for the optimization of the APP is in an advanced implementation state. All operators have been developed and tested and will be integrated in the full algorithm shortly.