LHC – week 48 finishing up the ioning Coordination: Gianluigi Arduini & Mike Lamont.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Friday 23 rd November - morning Coming out of loss maps over night Thu – Fri  in shadow of MKD problem in SPS (and CMS cryo recovery) 07:35 Start pre-cycle.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
05:31 Beam dump due to QPS trigger in sector 78.  Quench heaters discharged in MB10.L8. 07:28 Quench heaters charged ok again in cell B10L8.  Was a EN/EL.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Pevatron status Sunday 29 th November 2015 Coordination: John Jowett, Mike Lamont, Jan Uythoven Access Loss maps Physics.
From yesterday LHC status Wednesday 26 th Welcome Verena back on shift 07:08 Access in PM85 for piquet EPC (O.Fournier).  Fuse on RD2.R8 circuit.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
MD Planning Fri – Sat (26. – 27.8.)
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Machine Coordinators: G. Arduini, J. Wenninger
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Summary Friday h38: Ramp down and pre-cycle.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
Monday 11/07: Recovery Plenty of accesses.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Summary of Week 16 G. Arduini, J. Wenninger
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Week 35 – Technical Stop and Restart
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
LHC Morning Meeting - G. Arduini
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Saturday :42 stable beams fill 3541
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC Morning Meeting - G. Arduini
Friday 28 October 2011.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Wednesday 26 October 2011.
Saturday 26 November 2011.
Presentation transcript:

LHC – week 48 finishing up the ioning Coordination: Gianluigi Arduini & Mike Lamont

Week 48 - Overview LHC status MondayPolarity reversal PM: Lost cooling/cryo/link TuesdayRecovery WednesdayRecovery ELQA Powering tests Thursday03:00 Beam back Van der Meer scans - Alice FridayVan der Meer scans - Atlas and CMS SaturdaySteady operation SundaySteady operation

Luminosity & beam intensity LHC status e26 cm -2 s -1 4e12

Typical bunch intensity distribution LHC status

W38 - fills LHC status DateFillCMS peak e24 SB [hr]CMS Int [ub -1 ] Dump Mon 28 Nov :121.7PLC problem on M1B1 Thu 1 Dec :455.1OP Thu 1 Dec :464.2OP Fri 2 Dec :144.8OP Fri 2 Dec :153.2QPS board problem on B10L2. Sat 3 Dec :395.3OP Sat 3 Dec :555.1OP Sat 3 Dec :016.2OP Sun 4 Dec :083.3BD self trigger Sun 4 Dec :345.1OP Mon 5 Dec2343

07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze Crossing angle polarity switch when going in collision 12:00 TCT alignment check in point 2 after crossing angle polarity switch when going in collision 13:30-14:30: loss maps and asynch dump test Loss maps OK (S. Redaelli) although deterioration in the vertical plane B1 Asynch dump ok (Jan Uythoven). Polarity inversion - Monday

+/- 6 sigma plus length scale scans… Thursday afternoon – Alice Van der Meer LHC status 7

Satellite & ghosts: fill 2334 Plots from Adam Jeff Overall the situation is rather good. ~3% although we got cases down The satellites at 10 and 15 ns disappeared but we have now some more satellites at 5 ns LHC status

MAJOR TIMEOUTS & ISSUES LHC status

At 20:26 Monday short circuit in water level sensor of the cooling tower SF4, which resulted in an drop of the 24 V network  Cut the water to the cryo and at 20:29 lost the cryo Deterioration of insulation vacuum on DSLC Cooling problem point 4 – knock-on permanent turbo pump permanent turbo pump DSLC 500 meters Q7R Q11R DFBLCArc 3-4 vac gauges UJ33 Sector 3-4 vac gauges Simplified insulation vacuum layout annex volume - current lead? - heater? LHC status

Ice observed on DFBLC annex volume Oct 2011 Annex volume connected to DFBLC volume 11/10/11 Cryo stop P4 28/11/2011 pm Pressure in DSLC rises to 10 mbar in few hours VSC piquet intervention to install mobile pump Nominal vacuum conditions re-established Annex volume still in communication!! Cause of leak?? Summary of events to Tuesday LHC status Paul Cruikshank TE/VSC 29/11/2011

DFBLC/DSLC – looking back LHC status Icing of annex volume Oct 2011, Pressure perturbation seen on DSLC when put into communication with annex Self recovery of pressure indicates air leak

DFBLC/DSLC – actions this week LHC status Type of vacua: Beam vac, Cryo insulation vac, anti-condensation vac => They should never be mixed !!! Vac volumes separated, each pumped separately Heater electrical part protected in case of power failure and re-icing Serge Claudet 13

DFBLC/DSLC - consequences Max. Temperature on DSLC reaching 250 K at 14:00 and in a short period  needed ELQA before powering (A. Siemko) LHC status

Following ELQA, revalidation of circuits via HWC powering tests:  PIC2-Circuit quench via QPS and PNO.A3 were done on the following: RQS.A34B2, RQTL7.R3B1, RQTL7.R3B2, RQTL8.R3B1, RQTL8.R3B2, RQTL10.R3B1, RQTL10.R3B2, RQTL11.R3B1, RQTL11.R3B2, RQT12.R3B1, RQT12.R3B2, RQT13.R3B1, RQT13.R3B2, RQTL9.R3B1, RQTL9.R3B2, RSS.A34B1, RSS.A34B2, ROD.A34B1, ROD.A34B2, ROF.A34B1, ROF.A34B2 22:57 MP3 confirmed all circuits tested are fine. PIC 2 circuit quench via QPS and PNO.a3 have been carried out. Resistances have been measured and no relevant changes have been found! Wednesday evening LHC status Mirko, Matteo, Sandrine Back in business shortly afterwards 15

The door at P3 (PZ33) is broken and needs repair. The access team is preparing, and should start the repair at 8:30. First estimate is that this work will take 8 hrs After the door is fixed. a patrol of pt 3 will be needed, as the PZ33 is forced. Until the repair of PZ33 door starts, a CSA Guardian is stationed at PZ33 to control access Surface PAD point 3 - Wednesday Apologies from OP to Serge di Luca and team who’d been turned away a few days before in order to prepare for beam LHC status

Efficiency LHC status

INTERESTING OPERATIONAL STUFF LHC status

Checked Tune-FB response for various bandwidth: for a reduction factor of five (0.2) the tune (step) perturbation is taken out after about 30 seconds (90% to 10%). Programmed bandwidth changes are linear (as by design). Bandwidth reduction should reduce the maximum oscillation amplitude presently causing spurious QPS trips during the squeeze. Following squeeze done with tune feedback (BW reduced by factor 5) ON in both planes  no QPS trip and tune under control Tune feedback (R. Steinhagen) BW:

Alternate blow-up method LHC status dry test on the machine without beam performed Would like to test without beam at injection energy. 30 min should be enough. Will provide a rough scaling of the new method vs. the old one (in term of bunch lengthening vs. rms phase noise) Monday, Tuesday or Wednesday. Test in the ramp with a least 2 batches evenly spaced around the ring. We could also go for a full physics filling. Philippe Baudrenghien Start Stable Beams After 3 hours 20

BGI optimization ongoing LHC status Mariusz 21

Beam lifetime LHC status

Atlas ions - luminosity LHC status

Atlas – ions - per day LHC status

Integrated… LHC status

ADT: physics fill with gated damping (24 bunches not damped) to assess possible coexistence damper/BBQ measurement (EOF – now) Ion Quench test MD (> 8 hours)  Plus scraping test in CMS (30 minutes or so)  Proposed for today Alternative blow-up method (Philippe)  Monday? Test with beam at injection energy. 30 min should be enough. That will provide a rough scaling of the new method vs. the old one (in term of bunch lengthening vs. rms phase noise)  Monday, Tuesday or Wednesday. Test in the ramp with a least 2 batches evenly spaced around the ring. We could also go for a full physics filling. (100 ns checks in SPS) Incoming LHC status