AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design,

Slides:



Advertisements
Similar presentations
Project Prioritization Framework Principles
Advertisements

1 Bid Evaluation - Goods Objective Secure goods/services at most economical cost Price only one factor Other optional factors Time of delivery/completion.
The Economics Of Road Investment
1 Luis Rodriguez, P.E. Federal Highway Administration Life Cycle Cost Analysis Virginia Concrete Conference March 6-7, 2014.
Net Present Value and Other Investment Rules Chapter 5 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies,
Chapter McGraw-Hill Ryerson © 2013 McGraw-Hill Ryerson Limited 9 Prepared by Anne Inglis Net Present Value and Other Investment Criteria.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
What is it? What use is it? How do you do it? What is it? What use is it? How do you do it? Richard Harrison-Murray Research consultant
© Copyright DTU-CTT 2006 Technical University of Denmark Centre for Traffic and Transport - CTT COSIMA-ROAD - Modelling Decision Support and Uncertainty.
EE535: Renewable Energy: Systems, Technology & Economics
Unit 3 (cont.): Economic Analysis— Cost-Benefit Analysis 2.
Chapter 15 Application of Computer Simulation and Modeling.
Transportation Planning Section, Transportation Development Division Oregon Transportation Plan 2005 Modeling Alternative Policy Choices Becky Knudson,
Evaluation Tools to Support ITS Planning Process FDOT Research #BD presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE.
Capital Budgeting Decide how to invest money so that its value is maximized.
PPA 502 – Program Evaluation
Life Cycle Costing and Reliability H. Scott Matthews February 5, 2003.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Lec 20, Ch.11: Transportation Planning Process (objectives)
Lecture No. 54 Chapter 16 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Thermally Insulated Concrete Pavements: Life-Cycle Cost Analysis Methods and Preliminary Results January 10, 2011 John Harvey Nick Santero Lev Khazanovich.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Benefit Cost Analysis Nathaniel D. Coley Jr
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
8 th Road Pavements Forum 17 Nov 2004 SABITA PROJECT: Warrants for upgrading SuperSurf J Lea and P Paige-Green.
Network Benefit Cost Analysis: An Overview of the Application of NET_BC Software for Caltrans District 5’s System Analysis Study TRB Planning Applications.
An Intelligent Transportation System Evaluation Tool in the FSUTMS Regional Demand Modeling Environment By Mohammed Hadi, Florida International University.
ITS Sketch Planning Tool Webinar 2:00 – 4:00 PM January 8, 2009.
State Smart Transportation Initiative October 9, 2014 Matthew Garrett Oregon DOT Director Erik Havig Oregon DOT Planning Section Manager.
Benefit Cost Analysis for WRTM Mike Lawrence Jack Faucett Associates ITS PCB T3 Webinar July 8, 2014.
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Introduction to Systems Development Life Cycle
0 eCPIC Admin Training: Custom Calculated Fields These training materials are owned by the Federal Government. They can be used or modified only by FESCOM.
Acquiring Information Systems and Applications
Bangkok September, Economic Integration 2 Bangkok September, 2012.
June 12, 2012 Outline of the User’s Guide Presentation to STIP Stakeholder Committee.
Maintenance & Rehabilitation Strategies Lecture 5.
Systems Analysis and Design
Guide to Financial Analysis. 2 Contents  Purpose of this Guide  Financial Analysis defined  Defining Costs  Capital Costs  Operating Costs  Benefits.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
It is to decide what are the major expenditures or investments a company should make, it’s a method to judge the best investments options to create future.
Transportation leadership you can trust. presented to Safety Data Analysis Tools Workshop presented by Krista Jeannotte Cambridge Systematics, Inc. March.
Capital Budgeting Decide how to invest money so that its value is maximized.
HDM-4 Institutionalization. 2 HDM is for decision-support tool; not decision- making Institutionalization process should ensure that outcome is:  sustainable,
Kirk McElwain Technical Director
IPART’s review of CityRail’s regulatory framework – stakeholder roundtable 31 July 2008.
Life-Cycle Cost Analysis (LCCA) of Buildings
Risk Analysis for Major Rehabilitation. Major Rehabilitation Background  Prior to FY 1992  Funded under Operation and Maintenance, General, Appropriation.
Road Network Evaluation Tools (RONET) Version 2.00 January, 2009 Rodrigo Archondo-Callao.
Confidential & Proprietary Internal Kaplan Use Only. CAPITAL PROJECT ANALYSIS Unit 7.
FFC Framework for assessing Conditional Grants 16 March 2010 Financial and Fiscal Commission 1.
Level 2 Business Studies AS90844 Demonstrate understanding of the internal operations of a large business.
Accounting systems design & evaluation 9434SB 18 March 2002.
Road Investment Decision Framework
Capital Budgeting and Cost Analysis
5th Shire River Basin Conference 22 February 2017 Shire River Basin Management Project Shire Basin Planning Tool Sub-Component A1 Development of a.
Capital Budgeting and Cost Analysis
Capital Budgeting and Cost Analysis
Analysis Manager Training Module
EPC CONCEPTS and BUSINESS CASES
Multi-Year Programming and Predictive Modelling
Life Cycle Cost Analysis
Introduction and Applications
Chapter 2 par Overview.
Systems Analysis and Design
Stumpf and Teague Object-Oriented Systems Analysis and Design with UML
Stumpf and Teague Object-Oriented Systems Analysis and Design with UML
Capital Budgeting Techniques
Presentation transcript:

AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design, Project Management and Training, Technical Standards Branch.

Background BCA is an analytical tool to provide information to decision makers on the economic merits of a proposed investment or alternate investment options. BCA Model is intended to assist in the economic evaluation of various projects to determine: - Which project options are economically viable. - Which projection option is preferable from an economic point of view.

Process for updating Review existing models currently available and in use to evaluate road and bridge infrastructure projects. Evaluate these models against a set of criteria to determine a preferred approach to either use or modify one of these models, or modify the Ministry’s current model. Findings: it is optimal to update and modify the Ministry’s current benefit cost model on a regular basis.

Model Development Reviewed the types of projects that economic analysis would be applied to. Identified the major components of analysis that should be included in the updated model. Add model analytical functionality. Develop an approach for how the user will interact with the model. Prepare documentation on how the model can be used and how to interpret analysis results.

Model Development (Con’t) Excel (Microsoft) based Evaluate up to 3 alternatives Long term (80 years) Flexibility to define project and scenarios User interface Various result outputs (e.g. NPV, benefit/cost ratio, internal rate of return, payback period)

Model Development (Con’t) – Analysis Components Capital Investment Rehabilitation Costs Operating & Maintenance Costs (2 options) Road User Costs Vehicle Operating Costs (2 options) Travel Time Costs Collision Costs Environmental Costs

Project and alternative investment costs can be entered for user defined categories over the expected period of construction for the project.

Rehabilitation costs can be assigned to each project by type of project. These costs are specified by the user and will be added to project costs based on their expected timing.

Maintenance Costs used in the Ministry’s RODA program can be selected for each project or alternative – Case 1

Maintenance Costs can alternatively be defined for each project or alternative using customized categories – Case 2

Vehicle Operating Costs based on the Ministry’s original benefit/cost model taking into account road features such as surface type, gradient and curvature. – Case 1

Alternatively, vehicle operating costs can be defined as fuel and non-fuel vehicle operating costs. – Case 2 based on CalTrans

Travel Time Costs include consideration of the vehicle mix, vehicle occupancy and work/business and other (non work) trips.

Collision costs are based on Road Type and whether the road is in either an Urban or Rural area – 2010 Severities are for illustration only (not real)

The vehicle emission costs are user defined

Emission costs per liter of gasoline Sources: 1. CalTrans, 2. Environment Canada, 3. Environment Australia.

Emission costs per liter of diesel

BCA Results Results for each Alternative (up to 3) Three Scenarios for each Alternative Vary major analysis components (e.g. investment costs, discount rate, traffic growth, etc.) Benefit Cost Analysis Results Net Present Value Benefit Cost Ratio Internal Rate of Return Payback Period Net Present Value / Capital Cost (Primary Indicator)

Model Parameter and Value Updates All model parameters and values are being updated. Decisions about how model parameters are specified Identifying reliable sources of data Converting all values to current year $ On-going: these parameters will need to be revisited and values updated – ideally on an annual basis.

Model and Analysis Documentation The value and reliability of any analysis depends on transparency of analysis inputs and calculations. All model calculations are traceable in the model. Standardized input and output results will allow for a review of any analysis completed. The model will be accompanied by: User Guide Technical Report

Implementation The Model provides an analytical framework to consistently evaluate road and bridge projects. Model does not run automatically. Quality of the analysis depends on quality of the definition of the project alternatives and the model inputs. Veracity of the analysis results will be the responsibility of analyst. Interpretation of results will be the responsibility of the analyst.

QUESTIONS?