Lead from the front Texas Nodal Version 1.0 1 EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.

Slides:



Advertisements
Similar presentations
1 Market Trials Outage Scheduling Qualifications Weekly Update March 4, 2010.
Advertisements

1 Market Trials Outage Scheduling Qualifications Weekly Update February 18, 2010.
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Aug 08, 2008.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 16, 2010.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
1 Nodal Stabilization Market Call December 28, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Phase 1 Testing Monday / Friday Market Updates August 27, 2007.
1 Cutover Daily Call 4:30 PM November 23, :30.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates March 07, 2008.
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Dec 19, 2008.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Oct 03, 2008.
1 Market Trials Open Market Participant Call Weekly Kick Off Sept 27, 2010.
1 Nodal Stabilization Market Call December 14, 2010.
1 Nodal Stabilization Market Call December 21, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 R6.1 EDS 3 Release 6 LFC Workshop October 10, 2007.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates April 18, 2008.
Lead from the front Texas Nodal Version Workshop: 2-Hour Full-System Load Frequency Control (LFC) Testing (fka, EDS 3 R6.3.
1 Cutover Market Call December 01, :30 AM.
1 Nodal Stabilization Market Call December 06, :30 AM.
1 Market Trials Real-Time Market / LFC Weekly Update April 9, 2010.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
1 Market Trials QSE Qualifications Weekly Update January 22, 2010.
1 Cutover Market Call November 29, :00 AM.
Lead from the front Texas Nodal 1 Registration Market Call Oct 31, 2008.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
1 Market Trials Congestion Revenue Rights Weekly Update September 3, 2010.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 16, 2007.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates Feb 01, 2008.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 02, 2007.
14 Minute Ramp Period Testing Workshop June 30, 2009.
1 Nodal Stabilization Market Call December 03, :30 PM.
1 Cutover Market Call November 27, 2010.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1 Nodal Stabilization Market Call December 27, 2010.
1 Cutover Daily Call 10:30 AM November 23, :30.
Lead from the front Texas Nodal Version Workshop: 8-Hour Full-System Load Frequency Control (LFC) Testing (fka, EDS 3 R6.3.
Lead from the front Texas Nodal 1 EDS Market Call Weekly Update Jan 30, 2009.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 09, 2010.
1 Market Trials Open Market Participant Call Weekly Kick Off May 10, 2010.
1 Nodal Stabilization Market Call December 16, 2010.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Phase 1 Testing Monday / Friday Market Updates September 26, 2007.
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Oct 24, 2008.
01/21/2009 Telemetry Process & Progress ERCOT State Estimator & LFC Team Operations Advanced Network Applications Support.
Lead from the front Texas Nodal 1 Registration Market Call Nov 14, 2008.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Lead from the front Texas Nodal 1 EDS Market Call Weekly Update Feb 06, 2009.
1 Nodal Stabilization Market Call December 02, :30 PM.
1 Market Trials Outage Scheduling Qualifications Weekly Update March 26, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates June 06, 2008.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Lead from the front Texas Nodal Version Full-System Market and Reliability Testing (fka, EDS 3 R6.3 LFC testing)
EDS 3 Release 5 and 6 Friday Market Updates Jan 23, 2009
Market Trials Update NATF March 2,
Market Trials Open Market Participant Call
Cutover Market Call November 29, :30 PM
EDS 3 R6.3 Testing Workshop EDS 3 Release 6.3 LFC Web Ex June 11, 2008
EDS 3 Release 5 and 6 Friday Market Updates Sept 05, 2008
EDS 3 Release 5 and 6 Friday Market Updates Sept 19, 2008
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Market Trials Open Market Participant Call
Market Trials Open Market Participant Call
Presentation transcript:

Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control (LFC) October 7, 2008

Lead from the front Texas Nodal Version http://nodal.ercot.com LFC – R6.3: LFC SE & SCED FIT Web Ex Agenda Agenda – Welcome & Admonition Meeting Objective Focused Input Test II Overview & Set-up EOC, Inc/Dec Offers and OS s ERCOT Assessment and QSE Self Assessments QSE Pre-Test Schedule & Prep Summary

Lead from the front Texas Nodal Version Antitrust Admonition ANTITRUST ADMONITION ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their participation in ERCOT activities as a forum for engaging in practices or communications that violate the antitrust laws. The ERCOT Board has approved guidelines for members of ERCOT Committees, Subcommittees and Working Groups to be reviewed and followed by each Market Participant attending ERCOT meetings. If you have not received a copy of these Guidelines, copies are available at the Client Relations desk. Please remember your ongoing obligation to comply with all applicable laws, including the antitrust laws.

Lead from the front Texas Nodal Version LFC – R6.3: LFC FIT II Web Ex Objective Review the Test Design & Objectives to enable all parties to have a successful test. (LFC Release 6.3)

Lead from the front Texas Nodal Version http://nodal.ercot.com LFC – R6.3: LFC SE & SCED Focused Input Testing Web Ex Pre-Test Overview & Set-up Ken McIntyre

Lead from the front Texas Nodal Version LFC – R6.3: LFC SE & SCED Focused Input Testing Web Ex Why? Provide the market an opportunity to tune and operate Nodal system updates. Create Test Data Files for use in system tuning & testing The focused input test days will provide additional system wide open loop testing to prove SE & SCED system functions. It will provide an opportunity to tune Nodal functions for future Test Events (8 & 48 Hour Tests). Provide additional integration testing of Nodal Systems.

Lead from the front Texas Nodal Version LFC – R6.3: LFC SE & SCED Focused Input Testing Web Ex How? SCED will calculate Base Points TCM will be used for activating constraints for SCED No settlement impacts will occur as all actual unit control and dispatch will take place in the existing Zonal system framework Two 3 x 8 Tests (8 hours/day for 3 days) Five 72 hour Tests (24 hours/day for 3 days)

Lead from the front Texas Nodal Version http://nodal.ercot.com LFC – R6.3: LFC SE & SCED Focused Input Testing Web Ex ICCP Data Submittals Ken McIntyre

Lead from the front Texas Nodal Version LFC – R6.3: LFC SE & SCED Focused Input Testing Data Market Participant EMS Data Submittals – –RLC/LFC Support (Nodal=Zonal) Resources Net MW (ICCP) Resources Gross MW (ICCP) HSL, LSL (ICCP) HEL, LEL (ICCP) Resource Status Code (ICCP) Regulation Ancillary Service Schedules (ICCP) Responsive Reserve Ancillary Service Schedules and Responsibilities (ICCP) Non-Spin Reserve Ancillary Service Schedules and Responsibilities (ICCP) Resource Specific DSR Schedules and QSE DSR Load (ICCP) Regulation Participation Factors (ICCP) Combined Cycle Configurations (ICCP) Ramp Rates (RARF data up to date) Raise/Lower Block Status (ICCP) As called for in the Market Notice dated February 26, Nodal Regulation Responsibility will function on a 10 Minute basis as in Zonal 24 Support for SE, SCED, Telemetry & Market Offers

Lead from the front Texas Nodal Version LFC – R6.3: LFC SE & SCED Focused Input Testing Data Market Participant EMS Wind Unit Data Note – Section Operational Data Requirements –For each wind-powered Generation Resource the QSE shall set the HSL to the output capability of the facility based upon all available units and the current measured wind speed (HSL must be equal to or greater than the latest telemetered net real power of the wind- powered Generation Resource). ( –Telemetry HSL values for wind resources need to conform to this protocol for the LFC system wide focused input testing periods

Lead from the front Texas Nodal Version http://nodal.ercot.com LFC – R6.3: LFC SE & SCED Focused Input Testing Web Ex Energy Offer Curves, Inc/Dec Offers and Output Schedules Jeff Gilbertson

Lead from the front Texas Nodal Version LFC – R6.3: LFC SE & SCED FIT SCED/MMS Data Submittals Market Participant Data Submittals – –All Resources must have a COP –All Online Resources must have either an Energy Offer Curve, Output Schedule, or Output Schedule with Inc and/or Dec curves Current Operating Plan (COP) –Should reflect expected Resource Status and Limits –AS Schedule in submitted COP is not required for this testing period Energy Offer Curve –Should cover telemetered LSL/HSL range –Should reflect portion of BES carried by Resource in both MW and price Output Schedule –Should fall within telemetered LSL/HSL range –Should reflect expected MW output of Resource Inc/Dec Curve –Requires Output Schedule –Should reflect portion of BES carried by Resource in both MW and price –May require deviation from Zonal bids as first Inc price point must be > first Dec price point

Lead from the front Texas Nodal Version LFC – R6.3: LFC SE & SCED FIT SCED/MMS Data Submittals Submittal Timeline –Current Operating Plan (COP) Submit COP as early as 7 days in advance but no later than 1700 one day ahead of the testing period COP may be updated anytime prior to the end of the Adjustment Period (one hour before start of Operating Hour) Output Schedule submission requires COP submission as OS MW values are validated against COP HSL and LSL in MMS Release 3 Inc/Dec curve requires COP submission with ONDSR or ONDSRREG status SCED uses telemetered Resource Limits and Status, so submitted COP is not used by SCED Submitted COP will be used to determine if appropriate Energy Offer Curve, Output Schedule, and Inc/Dec curve have been submitted

Lead from the front Texas Nodal Version LFC – R6.3: LFC SE & SCED FIT SCED/MMS Data Submittals Submittal Timeline –Energy Offer Curve EOC submission may begin seven days prior to Operating Day EOC submission blocked for next Operating Day between 1000 and 1800 EOC may be updated after 1800 (beginning of Adjustment Period) to one hour prior to Operating Hour (the end of the Adjustment Period) There are rules for updating a DAM or RUC committed Resource, but DAM and RUC will not be performed during the testing window

Lead from the front Texas Nodal Version LFC – R6.3: LFC SE & SCED FIT SCED/MMS Data Submittals Submittal Timeline –Output Schedule Output Schedule submission may begin seven days prior to Operating Day Output Schedule may be updated until the end of the Adjustment Period OR the Operating Interval for DSR Requires COP for validation –Inc/Dec Offer Curves Inc/Dec Offer Curve submission may begin seven days prior to OD and ends at the end of the Adjustment Period Inc/Dec Offer Curve requires COP Resource Status of ONDSR or ONDSRREG Inc/Dec Offer Curve requires Output Schedule submission for SCED use –Inc/Dec Offer Curves both start at 0 MW –Inc is monotonically increasing in price; Dec monotonically decreasing –Offer Curve used by SCED constructed by adding Dec curve to the left of Output Schedule MW and Inc curve to the right of Output Schedule MW

Lead from the front Texas Nodal Version LFC – R6.3: LFC SE & SCED FIT SCED/MMS Data Submittals Submittal Timeline –Example timeframes for Operating Hour 10/23 12:00 pm – 1:00 pm 10/16 12:00 am – submission window for COP, Output Schedule, EOC, Inc/Dec begins 10/22 10:00 am – DAM deadline for 10/23. EOC submission window ends. 10/22 6:00 pm – Adjustment Period begins. EOC submission window re-opens. 10/23 11:00 am – End of Adjustment Period. COP, Output Schedule, EOC, and Inc/Dec submissions window ends (except Output Schedule for DSR) 10/23 12:00 pm – Start of Operating Hour. Output Schedule for DSR submission window ends.

Lead from the front Texas Nodal Version LFC – R6.3: LFC SE & SCED FIT SCED/MMS Data Submittals Market Participant Data Submittals – –Good Resource dispatch example Telemetry: HSL = 450; LSL=150; MW = 440 RLC: HDL = 450; LDL = 430 TPO covers 150 – 500 SCED BP = 450 MW; EOC price at 430MW = $20; LMP = $50 MW $20 $0 $

Lead from the front Texas Nodal Version LFC – R6.3: LFC SE & SCED FIT SCED/MMS Data Submittals Market Participant Data Submittals – –Bad Resource dispatch example Telemetry: HSL = 300; LSL = 100; MW = 150 RLC: HDL = 160; LDL=140 TPO covers 0 – 100 SCED BP = 140; TPO price at 140MW = $1000; LMP = $50 MW $-250 $1000 $0 $999 $

Lead from the front Texas Nodal Version http://nodal.ercot.com LFC – R6.3: LFC SE & SCED Focused Input Testing Web Ex ERCOT Assessment & QSE Self Assessments Burton Kunz

Lead from the front Texas Nodal Version http://nodal.ercot.com LFC – R6.3: LFC SE & SCED Focused Input Testing Assessments Assessment – ERCOT will analyze the Test results and report on: Market Participation Network Events System Performance –SE for Convergence (EMO 9) –SCED for consistent solutions, Shift Factors, LMP Note: ERCOT will provide analysis assistance in the form of answers to questions. It is the responsibility of each market participant to analyze their own test results from the R6.3 FIT II Tests.

Lead from the front Texas Nodal Version http://nodal.ercot.com LFC – R6.3: LFC SE & SCED Focused Input Testing Web Ex QSE Test Schedule & Prep Summary Burton Kunz

Lead from the front Texas Nodal Version http://nodal.ercot.com LFC – R6.3: LFC SE & SCED Focused Input Open Loop Testing FIT II Test Time & Dates – 3x8 Tests October 21, 22 & 23, 2008 November 4, 5 & 6, 2008 The Test will start at 8:00 AM The Test will end at 5:00 PM 72 Hour Tests (3x24) November 18, 19 & 20, 2008 December 2, 3 & 4, 2008 December 16, 17 & 18, 2008 January 6, 7 & 8, 2009 January 20, 21 & 22, 2009 The Test will start at 12:01 AM the first day The Test will end at 12:00 Midnight the third day Please make sure that all ICCP Data Submittals are working in real time. ERCOT will be making contacts as needed to improve the quality of data submittals.

Lead from the front Texas Nodal Version http://nodal.ercot.com LFC – R6.3: LFC SE & SCED Focused Input Testing Schedule Test Contacts Form – Each MP is required to provide a test form for FIT II by October 10 th. The form can be found on the Nodal Readiness Web Site. People – Each MP needs to have their experts on hand each test period to support: ICCP Energy Offer Curves, Inc/Dec Offers and Output Schedules

Lead from the front Texas Nodal Version LFC – R6.3: LFC SE & SCED FIT II Test Form

Lead from the front Texas Nodal Version LFC – R6.3: LFC SE & SCED FIT Data Submittals Market Participant EMS Data Submittals – –RLC/LFC Support (Nodal=Zonal) Resources Net MW (ICCP) HSL, LSL (ICCP) HEL, LEL (ICCP) Resource Status Code (ICCP) Ancillary Service Schedules and Responsibilities (ICCP) Resource Specific DSR Schedules and QSE DSR Load (ICCP) Regulation Participation Factors (ICCP) Combined Cycle Configurations (ICCP) Ramp Rates (using RARF data) Raise/Lower Block Status (ICCP) As called for in the Market Notice dated February 26, Nodal Regulation Responsibility will function on a 10 Minute basis as in Zonal 24 Support for SE, SCED, Telemetry & Market Offers

Lead from the front Texas Nodal Version http://nodal.ercot.com LFC – R6.3: FIT II Web Ex Thank you.