O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Ancillary Services From Aggregations of Small Responsive Loads Brendan Kirby Oak Ridge National.

Slides:



Advertisements
Similar presentations
In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Advertisements

Fully Engaging Demand: Lessons and Insights from the Olympic Peninsula GridWise ® Demonstration Demand Response Town Meeting June 2-3, 2008 Washington,
Demand Response Commissioner Suedeen Kelly June 3, 2008.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Can Today's Demand Response Programs Support Integration of Renewable Energy.
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
1 The Potential For Implementing Demand Response Programs In Illinois Rick Voytas Manager, Corporate Analysis Ameren Services May 12, 2006.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
Document number Finding Financial Solutions & Models for Microgrids Maryland Clean Energy Summit Panel Wednesday, October 16, 2013.
Demand Response in Connecticut Presented by: Bob Laurita ISO New England December 2, 2004.
1 July 15, 2007Alcoa Energy Regulatory Affairs NARUC / FERC Demand Response Collaborative Perspectives of a Large End Use Participant of NYISO Programs.
1 Wal-Mart’s View on Demand Response Program Design Anoush Farhangi Angela Beehler.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
November 2001 CHRISTENSENASSOCIATES RTP as a Demand Response Program – How Much Load Response Can You Expect? Peak Load Management Alliance Fall Conference.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
ON IT 1 Con Edison Energy Efficiency Programs Sustaining our Future Rebecca Craft Director of Energy Efficiency.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
WAL-MART STORES, INC. ENERGY EFFICIENCY AND DEMAND RESPONSE.
Power Utilities in the Telecom Business in the USA: Past Failures and Future Trends Mike Oldak Vice President & General Counsel Utilities Telecom Council.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
Demand Resources: Challenges and New Initiatives for ISO New England Henry Yoshimura, ISO New England NEW DEMAND RESPONSE PRODUCTS IN ELECTRICITY MARKETS.
Demand Response – A New Option for Wind Integration ?
Spinning Reserve from Load Transmission Reliability Peer Review January, 2004 John D. Kueck Brendan J. Kirby.
Applications and Benefits of Energy Storage Maui, Hawaii June 16, 2010 Garth P. Corey, Consultant Sandia National Laboratories Sandia is a multiprogram.
Load Management Strategies to Support Grid Integration of Intermittent Renewable Resources Paulina Jaramillo and Lester Lave.
Demand Response in Midwest ISO Markets February 17, 2008.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Reactive Power Federal Energy Regulatory Commission Open Meeting December 15, 2004.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Demand Response and the California Information Display Pilot 2005 AEIC Load Research Conference Myrtle Beach, South Carolina July 11, 2005 Mark S. Martinez,
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Linking the Wholesale and Retail Markets through Dynamic Retail Pricing Presented by: Henry Yoshimura Manager, Demand Response ISO New England September.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
Technology for demand side management and demand side bidding for grid companies. Stig Fretheim 15. Mai 2003.
Technical Assistance to the New England Demand Response Initiative (NEDRI) Charles Goldman E. O. Lawrence Berkeley National Laboratory
Chicago Advanced Energy Demand Response & CSP Evolution Kellen Bollettino Comverge Inc. 10/23/14.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Task XI Time of Use Pricing and Energy Use for Demand Management Delivery Task Status Report April 2006 Richard Formby.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
Managing Reliability and the Markets with PI
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
An Overview of Demand Response in California July 2011.
Demand Response
Extra electricity slides
Demand Response, Planning, and Regional Markets NASUCA Conference June 30, 2009 Joe Rosenthal, CT OCC.
Demand Response as a Distributed Energy Resource presented by: Mark S. Martinez Manager, Program Development PLMA Fall Conference September 2004.
CEC Public Workshop Order Instituting Informational and Rulemaking Proceeding (08-DR-01) March 3, 2008.
Changes in U.S. Regulatory Framework that Supports Energy Storage Deployment Jim Hart Vice President – South America.
UM 1751 Energy Storage Workshop #3 May 9, UM 1751 Workshop #3 Topics Most viable and beneficial applications (HB 2193 time frame: ) Emerging.
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
Renewable Energy Challenges: System Stability
Overview of the NYISO Demand Response Programs
New England Electricity Restructuring Roundtable
2500 R Midtown Sacramento Municipal Utility District
Presentation transcript:

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Ancillary Services From Aggregations of Small Responsive Loads Brendan Kirby Oak Ridge National Laboratory December 28, 2002 Washington, D.C. Transmission Reliability Research Review

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Objective  Develop the capabilities of aggregations of small loads to provide reliability services (ancillary services) to the bulk power system  Demonstrate the technical capability of residential and small commercial air conditioning loads to provide spinning reserve All customers benefit if the power system is more reliable, costs are reduced, and capacity is increased

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Responsive Loads: Better Matched To Spinning Reserves Than Peak Reduction  Better for the load: shorter, less frequent disruption  Better for the power system: faster response, more reliable, better use of generation  Better for other loads: reduced energy and ancillary service prices  Better for society: reduced need for generation and transmission Power System Reliability Events Are Fast, Infrequent and Relatively Short

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY A Series of Reserves Respond To Contingency Events

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Spinning Reserve: - Twice as Expensive as Supplemental - Highest Priced When Load is Available

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Spinning Reserve Is Typically Deployed for 10 Minutes or Less

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY It Is Now Possible and Desirable for Loads to Provide Spinning Reserves  Historically, loads have not been allowed to provide spinning reserves, the fastest, highest price contingency reserves  Advances in communications and control now make it technically possible  Power system reliability needs now make it desirable  Many loads are better matched to providing spinning reserve than demand reduction  Spinning reserve is capacity

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Loads Can Be Ideal Suppliers of Ancillary Services – Especially Spinning Reserve  Fast response  Fast deployment  Redundancy  Distributed throughout the power system  Fewer and shorter interruptions than demand reduction or energy market response –less storage required –less disruption to normal load operations  Complements energy management and price response  Only looking for a small percentage of load to respond

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Spinning Reserve From Residential and Small Commercial Thermostats  Existing Carrier ComfortChoice technology for peak reduction  Faster than generation for spinning reserve  Spinning reserve capability ~3x peak reduction  Significant monitoring in place

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Communications and Control  Designed for multi-hour peak reduction  Deployment signal <90 seconds  Verification delayed to protect paging system  Grouping by location, type, or any other criteria  Customer override allowed for peak shaving, not for spinning reserve  Control can be duty cycle, set point, or turn off  Monitors temperature, run time, communications  Customer remote monitoring and control web interface

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Can Provide Spinning Reserve While Providing Peak Reduction

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Substantial Installed Capacity That Could Be Tested Today UnitsDemand Reduction Spinning Reserve LIPA23,40025 MW75 MW Con Ed25,00025 MW75 MW SCE50,00050 MW150 MW SDG&E5,0005 MW15 MW

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Spinning Reserves From Commercial Loads Supervisory controllers in hospitality industry can: –Save energy and can reduce electric demand –Reduce space heating/cooling in rooms that are unoccupied –Shift electric loads during peak periods for short time intervals –Provide the capability for utilities to satisfy spinning reserve(?) Easy retrofit – Fast deployment – Developed by Digi-Log Technologies; tested for energy savings by ORNL Spinning reserve is an easy add-on –Modified to operate by pager signal from utility – Demo with LIPA and possibly others Will work with many technologies

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY DigiLog Motel Energy Management System Provides Spinning Reserve 80 room Howard Johnson motel 1 minute revenue metering Pager deployed spinning reserve 34kW, 36% load drop in 1 minute

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Common Concerns: Overrides – A Benefit and a Problem, But Less of a Problem for Spinning Reserve

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Statistical Response is Better Than Monitored Response Aggregation of many (smaller) individually lower reliability resources still provides higher guaranteed response than fewer (larger) individually higher reliability resources

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Metering and Communications Requirements  Givens: –Payment must be tied to actual response –Deployment signals have to be fast  One SCADA monitoring system currently performs three functions –Continuous readiness monitoring –Real-time event monitoring –Performance monitoring  How much monitoring is required? –Statistical resources may not need the individual real-time monitoring that deterministic resources need Redundancy may be better than observability. A 5% error in total load forecast can be a problem. A 5% error in reserve response may not be. –Performance monitoring can be slower –What information does the system operator really require in real-time?

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Communications Requirements Are Asymmetric (This is a Big Benefit)  System-to-load communications are typically broadcast –Resource need – MW of response desired –Price –Deployment – respond Now!  Load-to-system communications are typically individual –Capabilities and price offer –Performance monitoring – conceptually can be slower –Aggregator may help

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Service Definitions Are Critical  Most generators do not care if they run for 30 minutes or 8 hours –May have minimum run times –May have emissions limits  A load may be able to respond for minutes but not 2 hours –Can re-arm immediately if not used frequently  Response capability matches spinning contingency reserve much better than demand relief

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Technical Conclusions  Communications and control technology now makes spinning reserve from load possible  There are advantages to the responding loads, the power system, other customers, and society  Spinning reserve is a better match for some loads than peak reduction Rules are absolutely critical

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Basic Economics Work Market & Regulatory Rules Do Not  Capital cost less than CT  Spinning reserve is capacity (total needed generation)  Responsive load spinning reserve naturally rises and falls with system need –Forecast error –Daily load shape

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Problem: New Reliability Enhancing Technologies Are Not Deployed Some new technologies appear to be well matched to providing ancillary services, but:  Reliability services (ancillary services) are procured through markets  System operators do not aggressively seek new reliability enhancing technologies –System operators must remain market neutral  Existing ancillary service markets are designed around the large generating resources that have historically provided the services  Changing market rules to accommodate new technologies is very risky and slow –Rule changes apply to all new and old market participants –Rule changes can have unintended consequences –Reliability can be threatened –Cost/market impacts can be large

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Penalties Are Rigid - Rewards Are Not  New technology must meet all existing requirements –Monitoring –2 hour response duration –24/7 response…  New benefits are not valued –Regulation response accuracy –Spinning reserve response speed –Increased statistical reliability from smaller resources –Response matched to system load… Current rules are often tied to existing generation technology, not system physical requirements

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY New Technology Hurdles (Just to Be Allowed to Try to Compete)  Technology must actually work  Technology must be perceived as working  Aggregate resource must be perceived as large enough to be of value –Physically (there has to be enough physical response capability) –Economically (technology must be perceived as economically viable enough to capture a large market)  Must meet all existing requirements –Even if they are irrelevant to the new technology –Any required rule changes can not adversely impact existing technology reliability The economic push available to new central generation technologies is not available to small distributed technologies

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY System Operator Fears Are Well Founded In A Restructured Industry  System operator controls the market, not the resource  Limited ability to “try” something new  Relationships are competitive and contentious by design  The problem is universal –CAISO, WECC, ISO NE, PJM, AEP, NY, …

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY There May Be An Alternative: Regulated Resources to Manage Risk  The regulator could evaluate a technology and determine if it offers advantages for rate payers –It might reduce the need for an ancillary service and save rate payers money while increasing reliability  The regulator could approve a limited deployment (at rate payer expense) to test the technology  The ancillary service could be offered at no cost to the system operator, reducing the amount of ancillary service that must be procured in the unchanged ancillary service market  Rules for service delivery can be legitimately different because the system operator is in control of how and when the resource is used –Physical rules remain important but market rules can differ –Physical rules can be technology specific  If the test goes well the regulator can decide to expand the program –There is no danger of unexpected market resource shifts or reliability degradation  The new technology may move into the competitive arena with market rules adjusted based upon knowledge rather than perception, OR the new technology may remain as a regulated T&D asset

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Reactive Power Analogy  Markets for dynamic reactive support from generators are starting to develop  Should Static Var Compensators become competitive resources instead of regulated transmission resources?  Should capacitors? No. The regulated T&D resources reduce the system requirements for dynamic reactive power support from competitive generation markets. Regulated resources can coexist with competitive resources for the supply of ancillary services.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Treating Appropriate Ancillary Service Technologies as Regulated Resources Will:  Minimize power system reliability risk  Minimize developer and system operator financial risk  Maximize customer reliability and economic benefit  Separate technical from market design challenges  Develop confidence in new technologies by controlling deployment

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Publications: all report on work developed in this program  Water Heaters to the Rescue: Demand Bidding in Electric Reserve Markets, Public Utilities Fortnightly  Allocating Costs of Ancillary Services: Contingency Reserves and Regulation, ORNL/TM 2003/152  The Distribution System of the Future, The Electricity Journal  Technical Issues Related To Retail-Load Provision of Ancillary Services, New England Demand Response Initiative  Opportunities for Demand Participation in New England Contingency- Reserve Markets, New England Demand Response Initiative  Microgrids and Demand Response: How Software Controls Can Bridge The Gap Between Wholesale Market Prices and Consumer Behavior, Public Utility Fortnightly  Spinning Reserve From Responsive Loads, ORNL/TM 2002/19  Microgrid Energy Management System, ORNL/TM 2002/242  Spinning Reserves from Controllable Packaged Through the Wall Air Conditioner (PTAC) Units, ORNL/TM 2002/286  Technical Potential For Peak Load Management Programs in New Jersey

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Presentations all report on and extend work developed in this program  2 Ancillary service conferences including AS 101 workshops  2 New England Demand Response (NEDRI) meetings  Energy Storage Conference  NPCC  Canadian Energy Research Institute (CERI) 2003 Electricity Conference  WECC MORC (Minimum Operating Reserve Council)