Georgia Flood M.A.P. Program

Slides:



Advertisements
Similar presentations
In coordination with FEMA Kickoff Meeting Riverside County, CA May 27, 2010.
Advertisements

Flood Map Modernization in North Dakota North Dakota State Water Commission FLOOD MAP MODERNIZATION.
FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
Risk MAP Discovery Matanuska-Susitna Borough Information Exchange Sessions March 2013.
FEMA’s Flood Risk Review Meeting: Building Confidence in Risk MAP Products 2012 ASFPM National Conference San Antonio, Texas May 24, :00 pm.
Jennifer KlineOctober 10, DNR/CRD/GCMP Georgia Department of Natural Resources Coastal Resources Division Objectives of Coastal Hazards Program:
Preliminary DFIRM Community Coordination Meeting November 10, 2005 ESCAMBIA COUNTY, FLORIDA Preliminary DFIRM and FIS Text.
Scoping the North Carolina Cooperating Technical State Project Ed Curtis, P.E., CFM, North Carolina Division of Emergency Management Jerry Sparks, P.E.,
Federal Emergency Management Agency Map Modernization Project City of Bryan City of College Station & Brazos County, Texas.
William Solecki City University of New York – Hunter College
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Discovery Meetings [DATE]
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Flood Risk Mapping Project Identifying the Risk Editorial Board Meeting [COMMUNITY NAME] Flood Risk Mapping Project.
Understanding Advisory Base Flood Elevations (ABFEs) Understanding Advisory Information and the Implications for Your Home December 2012.
1 Changes to Alabama Flood Maps Impacts to Flood Insurance Presented By: Leslie A. Durham, P.E. ADECA Office of Water Resources January 23, 2014.
NC Floodplain Mapping Program North Carolina Floodplain Mapping Program Becoming a Cooperating Technical State.
NC LiDAR ( ) Success in other States – (Zsolt Nagy – AECOM) 1.What was the business driver for NC LiDAR? 2.What was the coordination approach?
Flood Risk Mapping Project Editorial Board Meeting [COMMUNITY NAME]
North Carolina Neuse River Basin Plan Final Scoping Meetings April 23, 24, and 25, 2001.
Osceola County Floodplain Program
Preliminary Flood Insurance Rate Maps. What is a Flood Insurance Rate Map (FIRM) and how do I use it?* A FIRM is a map created by the NFIP for floodplain.
Changes to FEMA Mapping John Grace, CFM Coastal Engineer - FEMA Region 1 - Boston March 14, 2014 – The Soil and Water Conservation Society – Winter Conference.
‘Community Resilience Toolbox’ Training Series: Leveraging Public and Community Data to Assess Local Flood Risk Thursday, September 26, :00–1:00.
FLOOD STUDY Rockland County, NY
FLOOD STUDY Oswego County, NY FEMA REGION II February 7, 2011.
Geospatial capabilities for a BEST MANAGED Georgia 1 Georgia Geospatial Advisory Council (GGAC) Business Case for Accurate Digital Elevation Data Acquisition.
1 US Army Engineer Research and Development Center FEMA REGION III COASTAL MAPPING PROJECT May 19, 2011 Coastal Analyses and Outreach Robin Danforth, FEMA.
FEMA UPDATED FLOODPLAIN MAPS Public Works Department Stormwater Management Division August 5, 2008 FEMA UPDATED FLOODPLAIN MAPS Public Works Department.
FEMA’s Coastal Mapping and Management Process. 2 2 Welcome  Background and Coastal study methodologies  Technical Opportunities  Management Opportunities.
Back Creek Floodplain SEPTEMBER 2, Why are we here Introductions Almost 300 parcels affected by revised flood study of Back Creek Outline ◦History.
FLOOD STUDY Cumberland County, NJ FEMA REGION II February 22, 2011.
North Carolina White Oak River Basin Plan December 19, 2000.
DFIRM Subcommittee Update 1. Challenges Remain Climate Change and Sea Level Rise: Identify sea level rise timeframe and associated critical issues Data.
Georgia Flood Risk Management - Beyond the Why and Getting to How 1 August 28, 2014 Flood Planning and Policy: Education / Outreach Workshop The Armstrong.
FEMA Region II Essex County, NJ Digital Flood Insurance Rate Map (DFIRM) FEMA Region 2 Mitigation Division July 14th, :00-11:00.
US Army Engineer Research and Development Center COASTAL OUTREACH ADVISORY TEAM Kick-off Meeting November 19, 2010 FEMA Region III Coastal Mapping Project.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Wave Height Estimate for Multi- Frequency Flooding Events Elena Drei-Horgan, PhD, CFM Darryl Hatheway, CFM Paul Carroll, PE May 24, 2012.
Communicating About Flood Hazards in Coastal Communities A Challenging and Risk-y Business Henrietta Williams, Lynne Keating, and Dick Wild Presentation.
Flood Map Modernization Flood Map Modernization Mapping the Risk Editorial Board Meeting October 2005 HILLSBOROUGH COUNTY FLOOD MAP MODERNIZATION V
Flood Map Modernization Flood Map Modernization Mapping the Risk Editorial Board Meeting [date] V [COMMUNITY NAME] FLOOD MAP MODERNIZATION.
ASFPM May 19, 2011 by Darryl Hatheway, CFM, AECOM San Diego and Vince Geronimo, CFM, PE, AECOM Oakland.
FEMA Region II Somerset County, NJ Digital Flood Insurance Rate Map (DFIRM) FEMA Region 2 Mitigation Division June 24th, :00-11:00.
North Carolina Tar-Pamlico River Basin Plan Final Scoping Meetings January 30 and 31, 2001.
Risk MAP and Resilience Mari Radford, CFM, Mitigation Planner Alison Kearns, CFM, Community Planner FEMA Region III.
FEMA’s Risk MAP Coastal Updates – An Overview Jonathan E. Westcott, P.E. ASFPM 2012 National Conference San Antonio, TX Session D.8.
North Carolina Pasquotank River Basin Plan Final Scoping Meetings May 17 and 18, 2001.
Passaic County, NJ Initial Coordination Meeting FEMA Region II Mitigation Division October 6th, :00-11:00.
In coordination with FEMA Kickoff Meeting Ventura County, CA April 29, 2010.
HAZARD MITIGATION PLAN UPDATE LOCAL EMERGENCY PLANNING COMMITTEE.
A Great L-EAP Forward: Successes and Challenges in Implementing FEMA’s Expanded Appeals Process Todd Steiner FEMA Maggie Mathis, CFM RAMPP.
Coastal Hazard Analyses and DFIRM Update For Maryland Robin Danforth – FEMA Region III Jeff Gangai – RAMPP Heather Zhao– RAMPP Jeff Hanson – USACE/ERDC.
Regional Planning for Sea-Level Rise in Hampton Roads Benjamin McFarlane, AICP Regional Planner NOAA Hydrographic Services Review Panel October 26, 2011.
Evaluation of Preliminary DFIRMs Phase I Findings Terrebonne Parish June 22, 2009.
Coastal Hazards: Hurricanes. Homework Questions Would you live in an area at risk for hurricanes? If so, where? What level of risk from hurricanes is.
FLOOD STUDY Burlington County, NJ FEMA REGION II November 29, 2010.
FEMA Terms (Last updated July 25, 2006) The Acronyms  NFIP – National Flood Insurance Program  FIRM – Flood Insurance Rate Map  SFHA – Special Flood.
Coastal Outreach Advisory Team FEMA Region II COAT Kickoff Meeting April 4, 2013, 10:00 a.m. Alejandro De La Campa, FEMA Region II-Caribbean Division Director.
FLOOD STUDY Salem County, NJ FEMA REGION II February 22, 2011.
Cape May County, NJ Initial Coordination Meeting FEMA Region II Mitigation Division September 29th, :00-11:00.
Risk MAP Discovery Malheur & Payette Counties Information Exchange Sessions July 2015.
Middlesex County, NJ Initial Coordination Meeting FEMA Region II Mitigation Division October 13th, :00-15:00.
Preliminary DFIRM Community Coordination (PDCC) Meeting Dixie County, FL February 10, 2016.
FEMA Risk MAP City of Yakima – Lower Yakima Discovery Information Exchange Session May 9, 2016.
MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION Protecting Maine’s Air, Land and Water MAINE.
Osceola County Floodplain Program Jennifer Nicholson, CFM Picture credit: Osceola Historical Society.
North Carolina Lumber River Basin Plan
Colorado Hazard Mapping Phase III Program Overview
Glynn County, GA Flood Remapping January 2018
Risk MAP & the Little River Basin
Presentation transcript:

Georgia Flood M.A.P. Program CRS – Education and Outreach Workshop Georgia Coastal Counties Mapping Project Armstrong Center Savannah, GA August 28, 2014

3 Takeaways Why are the maps being updated. Status of the coastal project CRS Benefits of the new maps

Georgia Coastal Project 9 Counties Updated Bryan, Camden, Chatham, Charlton, Effingham, Glynn, Liberty, Long & McIntosh Counties 343 total panels Study Types Coastal surge and wave height study Approximately 284 miles of approximate study Approximately 57 miles of redelineation study Approximately 8 miles of local detailed study Approximately 12 miles of limited detailed studies Preliminary Risk MAP Products Phase I ( Riverine Study) – Completed Phase II (Coastal Study) – Available for viewing on June 2015

Why the Coastal Flood Risk Study Is Being Updated Flood risk changes over time – Effective study based on outdated hurricane modeling and topographic data Ability to more accurately define risk and account for significant development in project area To gain a complete and current picture of coastal flood risks. This helps community: Plan for the risk Communicate the risk to your citizens Take action to reduce flood risk to lives and property Build smarter and safer

Why the Coastal Flood Risk Study Is Being Updated Current surge analysis is 20 to 40+ years old Chatham County - Environmental Sciences Services Administration’s JPM Method – 1970 publication Climate data from 1965 to 1981 NOAA reports Glynn and Camden Counties – updated surge in 1989 using SURGE model

Why the Coastal Flood Risk Study Is Being Updated Your risk is better defined through Updated elevation data (topographic data and aerial imagery) New climatological data based on recent storms Computing resources – a lot has changed in 30 years! Updated coastal hazard methodologies/modeling Improvement in Geographic Information System (GIS) technologies to improve coastal mapping accuracy

Georgia Coastal Project Timeline Fall 2010 Fall 2011 Summer 2012 Winter 2013 Spring 2013 Fall 2013 Spring 2014 Summer 2014 Spring 2015 Summer2015 Winter 2016 Summer 2016 Inland Phase* Scoping Meetings Kickoff Meeting Draft Map Review Meetings PDCC Meeting Appeal & Protest Period LFD Resilience Meeting Effective FIRMs   Multi-Agency Stakeholder Meetings Open House Coastal Phase  Technical Update Meeting Storm Surge Update Meeting Resilience Meeting  *Camden, Glynn, & McIntosh Counties do not have any panels being revised under the inland phase of this project 7

Coastal Flood Risk Map

FEMA FIS Study is not Evacuation Study

Typical FIRM CRS Benefits The model simulates the response of the still water surface to atmospheric forcing (water interacts with elevation features)

Limit of Moderate Wave Action (LiMWA) CRS Benefits Defined by the area subject to wave action with waves greater than 1.5 feet in height

Limit of Moderate Wave Action (LiMWA) CRS Benefits FEMA Procedure Memorandum No. 50, 2008 At present not a regulatory requirement No Federal Insurance requirements tied to LiMWA Just for open coast CRS benefit for communities requiring VE Zone construction standards in areas defined by LiMWA or areas subject to waves greater then 1.5 ft.

Limit of Moderate Wave Action (LiMWA) CRS Benefits Video

Coastal Flood Risk Study Contacts Project Manager Todd Harris, CFM (404) 651-8504 todd.harris@dnr.state.ga.us State NFIP Coordinator Tom Shillock, CFM (404) 362-2606 tom.shillock@dnr.state.ga.us REUSE??